ML19345C536: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 13: | Line 13: | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 2 | | page count = 2 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:* | ||
\\ | |||
BALTIMORE G AS AND ELECTRIC COMPANY P.O. BOX 1475 C ALTIMOR E. M A RYLAND 212o3 AntHun E. I,UNDVAbbedR- | BALTIMORE G AS AND ELECTRIC COMPANY P.O. BOX 1475 C ALTIMOR E. M A RYLAND 212o3 AntHun E. I,UNDVAbbedR-December 3, 1980 Vice ParsectNT som. | ||
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ATTENTION: | Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ATTENTION: | ||
Mr. R. A. Clark, Chief Operating Reactors Branch #3 Division of Licensing | |||
==SUBJECT:== | ==SUBJECT:== | ||
Calvert Cliffs Nuclear Power Plant Unit No.1, Docke: No. 50-317 Amendment to Operating License DPR-53 Fif th Cycle License Application Responses to NRC Staff Questions Gentlemen: | Calvert Cliffs Nuclear Power Plant Unit No.1, Docke: No. 50-317 Amendment to Operating License DPR-53 Fif th Cycle License Application Responses to NRC Staff Questions Gentlemen: | ||
Enclosed are our reponses to questions posed by NRC staff on the subject application. | Enclosed are our reponses to questions posed by NRC staff on the subject application. | ||
Very truly yours, BALTIMORE GAS ApD ELECTRIC COMPAAY | Very truly yours, BALTIMORE GAS ApD ELECTRIC COMPAAY y'l | ||
&fbx L l A. E. Lun$all, Jr. | |||
y'l | Vice President - Supply AEL/W3L/mit Copy To: | ||
Vice President - Supply AEL/W3L/mit Copy To: | J. A. Biddison, Esquire (w/out Encl.) | ||
G. F. Trowbridge, Esquire (w/out Encl.) | G. F. Trowbridge, Esquire (w/out Encl.) | ||
Messrs. | Messrs. | ||
E. L. Conner, Jr., NRC P. W. Kruse, CE Enclosure (40 copies) pm S30!!?d35Ea: | |||
( | |||
a v tu v 30 CO 3g1205oi: 54 g g.g | |||
t ENCLOSURE QUESTION Table 6-1 contains values for core average heat flux and average linear heat rate for both cycle 5 and the reference cycle 4 of Unit 1. | |||
t ENCLOSURE QUESTION Table 6-1 contains values for core average heat flux and average linear heat rate for both cycle 5 and the reference cycle 4 of Unit 1. The cycle'5 to cycle 4 ratios of these two quantities should be equal but are not. Please explain why. | The cycle'5 to cycle 4 ratios of these two quantities should be equal but are not. Please explain why. | ||
===RESPONSE=== | ===RESPONSE=== | ||
The value of Average Linear Heat Rate given in Table 6-1 for cycle 5 (6.45 kw/ft)_has been found to be inconsistent with the associated descrip-tive label. The correct value for cycle 5 is 6.23 kw/ft. Contrary to the descriptive label in the submittal,-the earlier value corresponded to densified fuel without accounting for the fraction of heat generated out-side the fuel rod. Use of 6.23 kw/ft in the cycle 5 to cycle 4 ratio results in agreement with the cycle 5 to cycle'4 ratio of Core Average Heat Flux | The value of Average Linear Heat Rate given in Table 6-1 for cycle 5 (6.45 kw/ft)_has been found to be inconsistent with the associated descrip-tive label. The correct value for cycle 5 is 6.23 kw/ft. Contrary to the descriptive label in the submittal,-the earlier value corresponded to densified fuel without accounting for the fraction of heat generated out-side the fuel rod. | ||
Use of 6.23 kw/ft in the cycle 5 to cycle 4 ratio results in agreement with the cycle 5 to cycle'4 ratio of Core Average Heat Flux. | |||
e}} | e}} | ||
Latest revision as of 10:00, 24 December 2024
| ML19345C536 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 12/03/1980 |
| From: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| To: | Clark R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8012050454 | |
| Download: ML19345C536 (2) | |
Text
\\
BALTIMORE G AS AND ELECTRIC COMPANY P.O. BOX 1475 C ALTIMOR E. M A RYLAND 212o3 AntHun E. I,UNDVAbbedR-December 3, 1980 Vice ParsectNT som.
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ATTENTION:
Mr. R. A. Clark, Chief Operating Reactors Branch #3 Division of Licensing
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit No.1, Docke: No. 50-317 Amendment to Operating License DPR-53 Fif th Cycle License Application Responses to NRC Staff Questions Gentlemen:
Enclosed are our reponses to questions posed by NRC staff on the subject application.
Very truly yours, BALTIMORE GAS ApD ELECTRIC COMPAAY y'l
&fbx L l A. E. Lun$all, Jr.
Vice President - Supply AEL/W3L/mit Copy To:
J. A. Biddison, Esquire (w/out Encl.)
G. F. Trowbridge, Esquire (w/out Encl.)
Messrs.
E. L. Conner, Jr., NRC P. W. Kruse, CE Enclosure (40 copies) pm S30!!?d35Ea:
(
a v tu v 30 CO 3g1205oi: 54 g g.g
t ENCLOSURE QUESTION Table 6-1 contains values for core average heat flux and average linear heat rate for both cycle 5 and the reference cycle 4 of Unit 1.
The cycle'5 to cycle 4 ratios of these two quantities should be equal but are not. Please explain why.
RESPONSE
The value of Average Linear Heat Rate given in Table 6-1 for cycle 5 (6.45 kw/ft)_has been found to be inconsistent with the associated descrip-tive label. The correct value for cycle 5 is 6.23 kw/ft. Contrary to the descriptive label in the submittal,-the earlier value corresponded to densified fuel without accounting for the fraction of heat generated out-side the fuel rod.
Use of 6.23 kw/ft in the cycle 5 to cycle 4 ratio results in agreement with the cycle 5 to cycle'4 ratio of Core Average Heat Flux.
e