ML19347A865: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML19347A865
| number = ML19347A865
| issue date = 09/26/1980
| issue date = 09/26/1980
| title = Forwards Interim Technical Evaluation Rept, Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports.
| title = Forwards Interim Technical Evaluation Rept, Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports
| author name = Carfagno S
| author name = Carfagno S
| author affiliation = FRANKLIN INSTITUTE
| author affiliation = FRANKLIN INSTITUTE
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.     .        -
{{#Wiki_filter:.
1
*/
-
-r-u 2 4
  */                                                                                                         l
. Franklin Research Center A Division of The Franklin Institute September 26, 1980 United States Nuclear Regulatory Commission Washington, D.C.
                                                                                          -r- u 2 4
20555 Attention:
      ..    . Franklin Research Center A Division of The Franklin Institute September 26, 1980 United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention:     Mr. Edward J. Butcher, Jr.
Mr. Edward J. Butcher, Jr.
Project Officer
Project Officer


Line 33: Line 33:


==Dear Mr. Butcher:==
==Dear Mr. Butcher:==
Enclosed is an Interim Technical Evaluation Report leading to a temporary classification of the above referenced plant as Croup I for fracture-toughness adequacy of S/G and RCP supports.
Enclosed is an Interim Technical Evaluation Report leading to a temporary classification of the above referenced plant as Croup I for fracture-toughness adequacy of S/G and RCP supports.
A final Technical Evaluation Report for this plant will be prepared upon receipt and review of the Licensee's response to a request-for-information letter which we understand has been issued by the NRC with a request of the Licensee to inform the NRC when their response will be made.
A final Technical Evaluation Report for this plant will be prepared upon receipt and review of the Licensee's response to a request-for-information letter which we understand has been issued by the NRC with a request of the Licensee to inform the NRC when their response will be made.
Very truly yours, i
Very truly yours, i
S. P. Carfa no Project Manager SPC/TCS/cm Enclosure cc: J. R. Fair (also reproducible copy)
S. P. Carfa no Project Manager SPC/TCS/cm Enclosure cc: J. R. Fair (also reproducible copy)
K. R. Wichman                                                                           g A. F. Glagola (letter only)                                                             g s% r
K. R. Wichman g
                                                                                                              \
A. F. Glagola (letter only) g s% r
l 8009300440                                                                                         l The Benjamin Franklin Parkway, Philadelphia. Pa.19103 (215)448-1000 TWX-710 6701889}}
\\
l 8009300440 The Benjamin Franklin Parkway, Philadelphia. Pa.19103 (215)448-1000 TWX-710 6701889}}

Latest revision as of 06:41, 24 December 2024

Forwards Interim Technical Evaluation Rept, Fracture Toughness of Steam Generator & Reactor Coolant Pump Supports
ML19347A865
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/26/1980
From: Carfagno S
FRANKLIN INSTITUTE
To: Butcher E
Office of Nuclear Reactor Regulation
Shared Package
ML19347A866 List:
References
CON-NRC-03-79-118, CON-NRC-3-79-118 NUDOCS 8009300440
Download: ML19347A865 (1)


Text

.

  • /

-r-u 2 4

. Franklin Research Center A Division of The Franklin Institute September 26, 1980 United States Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. Edward J. Butcher, Jr.

Project Officer

Reference:

FRC Project C5257 NRC Contract NRC-03-79-ll8 NRC TAC No.12066 FRC Task No. 160

Title:

FRC Interim TER: Fracture Toughnes.s of Steam Generator and Reactor Coolant Pump Supports - Arkansas Nuclear One Unit 2

Dear Mr. Butcher:

Enclosed is an Interim Technical Evaluation Report leading to a temporary classification of the above referenced plant as Croup I for fracture-toughness adequacy of S/G and RCP supports.

A final Technical Evaluation Report for this plant will be prepared upon receipt and review of the Licensee's response to a request-for-information letter which we understand has been issued by the NRC with a request of the Licensee to inform the NRC when their response will be made.

Very truly yours, i

S. P. Carfa no Project Manager SPC/TCS/cm Enclosure cc: J. R. Fair (also reproducible copy)

K. R. Wichman g

A. F. Glagola (letter only) g s% r

\\

l 8009300440 The Benjamin Franklin Parkway, Philadelphia. Pa.19103 (215)448-1000 TWX-710 6701889