ML20004F075: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20004F075 | | number = ML20004F075 | ||
| issue date = 05/20/1981 | | issue date = 05/20/1981 | ||
| title = Supplements Response to NRC | | title = Supplements Response to NRC Re Violations Noted in IE Insp Rept 50-341/80-20.Corrective Actions:Electrical Cables Pulled & Sample Cables Sent to Lab to Test for Cable Damage | ||
| author name = Wells D | | author name = Wells D | ||
| author affiliation = DETROIT EDISON CO. | | author affiliation = DETROIT EDISON CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = EF2-53560, NUDOCS 8106160469 | | document report number = EF2-53560, NUDOCS 8106160469 | ||
| title reference date = 01-23-1981 | |||
| package number = ML20004F071 | | package number = ML20004F071 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 19: | Line 20: | ||
{{#Wiki_filter:* | {{#Wiki_filter:* | ||
b O | b O | ||
Donald A. W&lls y | Donald A. W&lls y | ||
M*]*;25,*lf? ""''' | |||
2:co secene Avenue b f3i$INM$"# | 2:co secene Avenue b f3i$INM$"# | ||
May 20, 1981 EF2-53560 Mr. G. Fiore111, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory ~crmtission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 | May 20, 1981 EF2-53560 Mr. G. Fiore111, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory ~crmtission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 | ||
| Line 30: | Line 32: | ||
==Dear Mr. Fiore111:== | ==Dear Mr. Fiore111:== | ||
This letter describes additional action Detroit Edison is taking on item of nonempliance 80-20-31 contained in your IE Report 50-341/80-20. It supplements the action described in our letter of January 23, 1981 (reference). | This letter describes additional action Detroit Edison is taking on item of nonempliance 80-20-31 contained in your IE Report 50-341/80-20. It supplements the action described in our letter of January 23, 1981 (reference). | ||
This inspection of Enrico Fermi Unit 2 Site Construction activities was | This inspection of Enrico Fermi Unit 2 Site Construction activities was conducted by Mr. P.A. Barrett of NRC Region III en November 12-14, 1980. | ||
conducted by Mr. P.A. Barrett of NRC Region III en November 12-14, 1980. | 1 Only the additional action taken to address the concess of Mr. P.A. Barrett as expressed in a telephone conversation with Mr. H.A. Walker of Detroit l | ||
1 | |||
Edison on February 3,1981 are discussed in this supplement. This is in I | Edison on February 3,1981 are discussed in this supplement. This is in I | ||
addition to the action previously described in the referenced letter. | addition to the action previously described in the referenced letter. | ||
We trust that this letter satisfactorily addresses the additional NRC concerns on this matter. We will be glad to discuss any further concerns you might have. | |||
1 very truly yours, 1l) | 1 very truly yours, 1l) | ||
m/ HAW /cp cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Pr @. ass U.S. Nuclear Regulatory Camussion Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Ccmnission Resident Inspectors Office | { | ||
6450 North Dixie Highway Newport, Michigan 48166 | m/ HAW /cp cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Pr @. ass U.S. Nuclear Regulatory Camussion Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Ccmnission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan 48166 | ||
f | f | ||
' life DEIROIT EDISCN CCEPANY QUALITY ASSURANCE DEPARDENT ENRICO FERMI 2 PROJEI:T Supplemental Response to NRC Report No. 50-341/80-20 Docket No. 50-341 Idcense No. CPPR - 87 Inspection At: Femi 2 Site, Monroe, Michigan 48161 Inspection Conducted: Ibvember 12 - 14, 1980 l | |||
l Prepared by: | l Prepared by: | ||
li.A. Walker, Supervisor Construction Quality Assurance Approved by: | e li.A. Walker, Supervisor Construction Quality Assurance Approved by: | ||
M ((#M T.A. Alessi, Director Project Quality Assurance l | |||
[ | [ | ||
t l | t l | ||
l l | l l | ||
Supplemental Response to NRC Inspection Report 50-341/80-20 | Supplemental Response to NRC Inspection Report 50-341/80-20 Page 2 of 4 | ||
'Ihis supplemental repcrt describes the additional action that has been taken on item 80-20-01 to address the additional concerns expressed by Mr. P.A. Barrett of NRC Region III. 'lhe actions described below are in addition to those previously reported in our report of January 23, 1981. | |||
Statement of Violation 80-20, Appendix A, Item #1 (80-20-01) | Statement of Violation 80-20, Appendix A, Item #1 (80-20-01) | ||
Contrary to 10CFR50, Appendix B, Criterion II and the Enrico Fermi Unit 2-Quality Assurance Manual Section 1.0.1, quality control personnel of a contractor to Detroit Edison permitted instrunent cable installation activi-ties to continue before correcting a known deficiency in the pulling activi-ties. One cable had already been broken by these deficient activities. 'Ihis item is a severity Ievel IV violation. | Contrary to 10CFR50, Appendix B, Criterion II and the Enrico Fermi Unit 2-Quality Assurance Manual Section 1.0.1, quality control personnel of a contractor to Detroit Edison permitted instrunent cable installation activi-ties to continue before correcting a known deficiency in the pulling activi-ties. One cable had already been broken by these deficient activities. 'Ihis item is a severity Ievel IV violation. | ||
Additional Corrective Action Taken and Results Achieved Item 2.a. | Additional Corrective Action Taken and Results Achieved Item 2.a. | ||
(Page 3 of Report) | |||
(1) Determine how many other cables have been installed in this deficient manner and t uen ca m surate corrective action. | (1) Determine how many other cables have been installed in this deficient manner and t uen ca m surate corrective action. | ||
As stried in our previcus response, all Fermi 2 electrical cables pulled prior to the date of the NRC inspection were pulled using L.K. Cmstock' pulling instruction # 000-03-008 which was in use at the time of the inspecticm. Pulling records do not indicate those cables on which hand pulling was used. In addition to the cable testing described in our original response' Detroit Edison is taking the following additional action on this item. | As stried in our previcus response, all Fermi 2 electrical cables pulled prior to the date of the NRC inspection were pulled using L.K. Cmstock' pulling instruction # 000-03-008 which was in use at the time of the inspecticm. Pulling records do not indicate those cables on which hand pulling was used. In addition to the cable testing described in our original response' Detroit Edison is taking the following additional action on this item. | ||
Five cable samples have been selected and sent.to the Detroit Edison Research Laboratory for testing for cable darrage. 'Ihese sanples were | Five cable samples have been selected and sent.to the Detroit Edison Research Laboratory for testing for cable darrage. 'Ihese sanples were taken frm the forward end (where maxinum tension would have occurred) of cables where pull links had broken and DDR's had been written. Should the test results indicate that cable damage occurred then additional action will be determined and taken at that time. If no prob 1ms are found the cables will be considered typical of those cables where pos-sible ver-tensioning has occurred. | ||
taken frm the forward end (where maxinum tension would have occurred) of cables where pull links had broken and DDR's had been written. Should the test results indicate that cable damage occurred then additional action will be determined and taken at that time. If no prob 1ms are found the cables will be considered typical of those cables where pos-sible ver-tensioning has occurred. | |||
(2) Document the stop work order issued on Novcurber 13, 1980 concerning these installation activities. | (2) Document the stop work order issued on Novcurber 13, 1980 concerning these installation activities. | ||
l | l The stop work order verbally issued on November 13, 1980 on hand pulling of cables was formerly issued on Ncv m ber 17, 1980. A copy of this document is on file and is available for review at the Fermi 2 Construc-tion Site. | ||
l Corrective Action Taken to Avoid FtL@r Nonempliances Covered in the original response and no additional action was taken in this area. | l Corrective Action Taken to Avoid FtL@r Nonempliances Covered in the original response and no additional action was taken in this area. | ||
r-.v | r-.v | ||
.,--.,-.,,_,._,,.c.__, | |||
,-,.p,.,,,...,~, | |||
.--,,,_-,,.,c.-,.- | |||
--,4,,._-i f_py,%.--,%.,.,,_,,.,..,. - -.,,...,. _,,,,., -,,, - -. _,. - - _ _ -, - - - - | |||
4 | 4 A | ||
Supplemental Response to NRC Inspection Report 50-341/80-20 Page 3 of 4 Date When Full Ca pliance Will Be Achieved The esble tests will be empleted by the Edison Research Iaboratory and the results evaluated before July 31, 1981. | |||
I f | I f | ||
b o | b o | ||
e | |||
'Ihe foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief. | |||
h. | |||
H.A. Walker, Supervisor Construction Quality Assurance l | H.A. Walker, Supervisor Construction Quality Assurance l | ||
Subscribed and sworn to before me this | Subscribed and sworn to before me this 20th l | ||
day of May, 1981. | day of May, 1981. | ||
._,_,.1. | |||
_ g JENNiF)E KYKO ' | _ g JENNiF)E KYKO ' | ||
Notary Public, Monroe County, MI Wg @mnasico Expires Nov.26, IN4 | Notary Public, Monroe County, MI Wg @mnasico Expires Nov.26, IN4 | ||
... -}} | |||
Latest revision as of 10:37, 23 December 2024
| ML20004F075 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/20/1981 |
| From: | Wells D DETROIT EDISON CO. |
| To: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20004F071 | List: |
| References | |
| EF2-53560, NUDOCS 8106160469 | |
| Download: ML20004F075 (5) | |
Text
b O
Donald A. W&lls y
M*]*;25,*lf? ""
2:co secene Avenue b f3i$INM$"#
May 20, 1981 EF2-53560 Mr. G. Fiore111, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory ~crmtission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Additional Action on Nonccrnpliance at Enrico Fermi Unit 2 Construction Site.
Reference:
Istter (EF2-49,875) E. Hines to G. Fiore111 dated January 23, 1981.
Dear Mr. Fiore111:
This letter describes additional action Detroit Edison is taking on item of nonempliance 80-20-31 contained in your IE Report 50-341/80-20. It supplements the action described in our letter of January 23, 1981 (reference).
This inspection of Enrico Fermi Unit 2 Site Construction activities was conducted by Mr. P.A. Barrett of NRC Region III en November 12-14, 1980.
1 Only the additional action taken to address the concess of Mr. P.A. Barrett as expressed in a telephone conversation with Mr. H.A. Walker of Detroit l
Edison on February 3,1981 are discussed in this supplement. This is in I
addition to the action previously described in the referenced letter.
We trust that this letter satisfactorily addresses the additional NRC concerns on this matter. We will be glad to discuss any further concerns you might have.
1 very truly yours, 1l)
{
m/ HAW /cp cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Pr @. ass U.S. Nuclear Regulatory Camussion Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Ccmnission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan 48166
f
' life DEIROIT EDISCN CCEPANY QUALITY ASSURANCE DEPARDENT ENRICO FERMI 2 PROJEI:T Supplemental Response to NRC Report No. 50-341/80-20 Docket No. 50-341 Idcense No. CPPR - 87 Inspection At: Femi 2 Site, Monroe, Michigan 48161 Inspection Conducted: Ibvember 12 - 14, 1980 l
l Prepared by:
e li.A. Walker, Supervisor Construction Quality Assurance Approved by:
M ((#M T.A. Alessi, Director Project Quality Assurance l
[
t l
l l
Supplemental Response to NRC Inspection Report 50-341/80-20 Page 2 of 4
'Ihis supplemental repcrt describes the additional action that has been taken on item 80-20-01 to address the additional concerns expressed by Mr. P.A. Barrett of NRC Region III. 'lhe actions described below are in addition to those previously reported in our report of January 23, 1981.
Statement of Violation 80-20, Appendix A, Item #1 (80-20-01)
Contrary to 10CFR50, Appendix B, Criterion II and the Enrico Fermi Unit 2-Quality Assurance Manual Section 1.0.1, quality control personnel of a contractor to Detroit Edison permitted instrunent cable installation activi-ties to continue before correcting a known deficiency in the pulling activi-ties. One cable had already been broken by these deficient activities. 'Ihis item is a severity Ievel IV violation.
Additional Corrective Action Taken and Results Achieved Item 2.a.
(Page 3 of Report)
(1) Determine how many other cables have been installed in this deficient manner and t uen ca m surate corrective action.
As stried in our previcus response, all Fermi 2 electrical cables pulled prior to the date of the NRC inspection were pulled using L.K. Cmstock' pulling instruction # 000-03-008 which was in use at the time of the inspecticm. Pulling records do not indicate those cables on which hand pulling was used. In addition to the cable testing described in our original response' Detroit Edison is taking the following additional action on this item.
Five cable samples have been selected and sent.to the Detroit Edison Research Laboratory for testing for cable darrage. 'Ihese sanples were taken frm the forward end (where maxinum tension would have occurred) of cables where pull links had broken and DDR's had been written. Should the test results indicate that cable damage occurred then additional action will be determined and taken at that time. If no prob 1ms are found the cables will be considered typical of those cables where pos-sible ver-tensioning has occurred.
(2) Document the stop work order issued on Novcurber 13, 1980 concerning these installation activities.
l The stop work order verbally issued on November 13, 1980 on hand pulling of cables was formerly issued on Ncv m ber 17, 1980. A copy of this document is on file and is available for review at the Fermi 2 Construc-tion Site.
l Corrective Action Taken to Avoid FtL@r Nonempliances Covered in the original response and no additional action was taken in this area.
r-.v
.,--.,-.,,_,._,,.c.__,
,-,.p,.,,,...,~,
.--,,,_-,,.,c.-,.-
--,4,,._-i f_py,%.--,%.,.,,_,,.,..,. - -.,,...,. _,,,,., -,,, - -. _,. - - _ _ -, - - - -
4 A
Supplemental Response to NRC Inspection Report 50-341/80-20 Page 3 of 4 Date When Full Ca pliance Will Be Achieved The esble tests will be empleted by the Edison Research Iaboratory and the results evaluated before July 31, 1981.
I f
b o
e
'Ihe foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
h.
H.A. Walker, Supervisor Construction Quality Assurance l
Subscribed and sworn to before me this 20th l
day of May, 1981.
._,_,.1.
_ g JENNiF)E KYKO '
Notary Public, Monroe County, MI Wg @mnasico Expires Nov.26, IN4
... -