ML20023A853: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 21: Line 21:


==Dear Sir:==
==Dear Sir:==
MONTHLY OPERATING REPORT SALEM NO. 1 l
MONTHLY OPERATING REPORT SALEM NO. 1 l
DOCKET NO. 50-272 In compliance with section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of September 1982 are being l   sent to you.
DOCKET NO. 50-272 In compliance with section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of September 1982 are being l
sent to you.
l Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Summary of Safety Related Maintenance Operating Summary Refueling Information Sincerely yours,
l Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Summary of Safety Related Maintenance Operating Summary Refueling Information Sincerely yours,
                                                      /bl A7/ak ~
/bl A7/ak ~74 T 4Lka H.J. Midura General Manager - Salem Operations LKM:dev cc:
74 T 4Lka H.J. Midura General Manager - Salem Operations LKM:dev cc:     Mr. R. C. Haynes                                                                       l Regional Administrator USNRC Office of Inspection and Enforcement Region I 631 Park Avenue                                                                       l King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page 1 of 15                                                                             .
Mr.
8-1-7.R4 Tsnen-~,n---u 8210 20 0 0 SS R                                                       _ _ - _ _---
R. C. Haynes l
                                                                                                -s-}}
Regional Administrator USNRC Office of Inspection and Enforcement Region I 631 Park Avenue l
King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page 1 of 15 8-1-7.R4 Tsnen-~,n---u 8210 20 0 0 SS R
-s-
_ _ - _ _---}}

Latest revision as of 01:57, 21 December 2024

Forwards Monthly Operating Rept for Sept 1982
ML20023A853
Person / Time
Site: Salem 
Issue date: 10/10/1982
From: Midura H
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20023A854 List:
References
NUDOCS 8210200085
Download: ML20023A853 (1)


Text

-

O PSEG Public Service Electnc and Gas Company P.O. Box # 168 Hancocks Bridge, New Jersey 08038 October 10, 1982 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 l

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 l

DOCKET NO. 50-272 In compliance with section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of September 1982 are being l

sent to you.

l Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Summary of Safety Related Maintenance Operating Summary Refueling Information Sincerely yours,

/bl A7/ak ~74 T 4Lka H.J. Midura General Manager - Salem Operations LKM:dev cc:

Mr.

R. C. Haynes l

Regional Administrator USNRC Office of Inspection and Enforcement Region I 631 Park Avenue l

King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page 1 of 15 8-1-7.R4 Tsnen-~,n---u 8210 20 0 0 SS R

-s-

_ _ - _ _---