ML20038A845: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:m
{{#Wiki_filter:m
        /       s Commonwe::lth Edison
/
(       ) one First National Plaza, Chicago, Imnois
s Commonwe::lth Edison
(       ) Address Reply to. Post Office Box 767
(
(   / Chicago, lihnois 60690 Novembe r 16, 1981 Mr. James G. Keppler, Director                                                 I' f Directorate of Inspection and                                                         -''(       -i Enforcement - Region III U.S. Nuclear Regulatory Commission UOV,9 3 7gg      * -f 799 Roosevelt Road                                                                 <,.,,,,,l"*'
) one First National Plaza, Chicago, Imnois
                                                                                          "o        "7' Glen Ellyn, IL 60137
(
) Address Reply to. Post Office Box 767
(
/ Chicago, lihnois 60690 Novembe r 16, 1981 Mr. James G. Keppler, Director I' f Directorate of Inspection and
-''(
-i UOV,9 3 7gg * -f Enforcement - Region III U.S.
Nuclear Regulatory Commission 799 Roosevelt Road
<,.,,,,,l"*' "7' "o
Glen Ellyn, IL 60137


==Subject:==
==Subject:==
Byron Station Units 1 and 2 Braidwood Station Unit s 1 and 2
Byron Station Units 1 and 2 Braidwood Station Unit s 1 and 2 1)
: 1) Response to I.E. Bulletin 81-02 Supplement 1, " Failure o f Gate Type Valves to Close Against Differential Pressure"
Response to I.E.
: 2) Supplemental Response to 50.55(e)
Bulletin 81-02 Supplement 1,
Deficiency Report 81-03 NRC Docket Nos. 50-454/455/456/457 Reference (a):               T. R. Tramm letter to J. G. Keppler dated July 24, 1981.
" Failure o f Gate Type Valves to Close Against Differential Pressure" 2)
(D):     J. G. Keppler letter to Cordell Reed dated August 18, 1981.
Supplemental Response to 50.55(e)
(c):     E. D. Swartz letter to J. G. Keppler dated September 15, 1981.
Deficiency Report 81-03 NRC Docket Nos. 50-454/455/456/457 Reference (a):
T.
R.
Tramm letter to J.
G.
Keppler dated July 24, 1981.
(D):
J.
G.
Keppler letter to Cordell Reed dated August 18, 1981.
(c):
E.
D. Swartz letter to J.
G.
Keppler dated September 15, 1981.


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
Reference (b) requested Commonwealth Edison Company to review Bulletin No. 81-02, Supplement 1, for applicability to our plants under construction and report the results within ninety (90) days.
Reference (b) requested Commonwealth Edison Company to review Bulletin No. 81-02, Supplement 1, for applicability to our plants under construction and report the results within ninety (90) days.
The enclosure to this letter is provided to fulfill this ninety (90) day requirement for our Byron and Braidwood Stations.
The enclosure to this letter is provided to fulfill this ninety (90) day requirement for our Byron and Braidwood Stations.
Reference (c) fulfilled this ninety (90) day requirement for our LaSalle County Station.
Reference (c) fulfilled this ninety (90) day requirement for our LaSalle County Station.
The enclosure to this letter is also intended to supplement our Reference (a) response to the 10 CFR 50.55(e) reportable defi-ciency (number 81-03). However, the enclosure includes some changes to the information submitted in Reference (a). Specifically, the
The enclosure to this letter is also intended to supplement our Reference (a) response to the 10 CFR 50.55(e) reportable defi-ciency (number 81-03).
    " Consequence o f Failure" uescription has been modified in accordance with the Westinghouse determination, and six (6) valves have been added to the list (SI6808A,B,C,0, 8809A,B). Additionally, the maxi-mum differential pressure and specific corrective action determina-tions for Byron Station have been made and are reported herein.                             The 8111240214 811116                                                         yG,I c, 0 19m bl l PDR ADOCK 05000454 G                       PDR
However, the enclosure includes some changes to the information submitted in Reference (a).
Specifically, the
" Consequence o f Failure" uescription has been modified in accordance with the Westinghouse determination, and six (6) valves have been added to the list (SI6808A,B,C,0, 8809A,B).
Additionally, the maxi-mum differential pressure and specific corrective action determina-tions for Byron Station have been made and are reported herein.
The bl l 8111240214 811116 PDR ADOCK 05000454 yG,I c, 0 19m G
PDR


J. G. Keppler                                       Novembe r 16, 1981 specific modifications for the Braidwood units are expected to be available by March, 1982.
J.
Finally, modifications are expected to be completed on Byron Unit 1 by January 1, 1982.       The schedule for completion of the Byron Unit 2 and Braidwood Units 1 and 2 modifications will be determined and submitted by April 1, 1982.
G.
Our estimate of the hours expended in the review and prepa-ration of the enclosed supplementary Byron and Braidwood report is five and one half hours.       This does not, however, account for the Westinghouse efforts in preparing their determination on this matter.     Additionally, the manhour estimates for corrective action have not been determined.
Keppler Novembe r 16, 1981 specific modifications for the Braidwood units are expected to be available by March, 1982.
To the best of my knowledge and belief, the statements contained herein are true ani correct.         In some respects these statements are not based upon my personal knowledge, but upon information furnished by other Commonwealth Edison employees. Such information has been reviewed in accordance with Company practice and I believe it to be reliable.
Finally, modifications are expected to be completed on Byron Unit 1 by January 1, 1982.
The schedule for completion of the Byron Unit 2 and Braidwood Units 1 and 2 modifications will be determined and submitted by April 1, 1982.
Our estimate of the hours expended in the review and prepa-ration of the enclosed supplementary Byron and Braidwood report is five and one half hours.
This does not, however, account for the Westinghouse efforts in preparing their determination on this matter.
Additionally, the manhour estimates for corrective action have not been determined.
To the best of my knowledge and belief, the statements contained herein are true ani correct.
In some respects these statements are not based upon my personal knowledge, but upon information furnished by other Commonwealth Edison employees.
Such information has been reviewed in accordance with Company practice and I believe it to be reliable.
Please address any questions you may have concerning this matter to this office.
Please address any questions you may have concerning this matter to this office.
Very t ruly yours, fb f
Very t ruly yours, fb f
                                                $x-E. Douglas Swartz Nuclear Licensing Adminstrator Enclosure cc:     Director, NRC O f fice o f Inspection and Enforcement Region III Inspector - Byron Region III Inspector - Braidwood SUESCRIBED AND SWORN to of                       8
$x-E.
        /Mf.4I4.k.8.
Douglas Swartz Nuclear Licensing Adminstrator Enclosure cc:
Director, NRC O f fice o f Inspection and Enforcement Region III Inspector - Byron Region III Inspector - Braidwood SUESCRIBED AND SWORN to of 8
/Mf.4I4.k.8.
Notary Public 1m 2878N
Notary Public 1m 2878N


e 4
e 4
j                                                                                           ENCLOSURE                                       ,
j ENCLOSURE i
i J
J COMMONWEALTH EDISON COMPANY BYRON STATION UNITS 1 and 2 BRAIDWOOD STATION UNITS 1 and 2 RESPONSE TO I.E. BULLETIN 81-02 SUPPLEMENT 1 i
COMMONWEALTH EDISON COMPANY BYRON STATION UNITS 1 and 2 BRAIDWOOD STATION UNITS 1 and 2 RESPONSE TO I.E. BULLETIN 81-02 SUPPLEMENT 1 i
i 1
i 1
F i
F i
2878N
2878N
  . - - -  ,-e,     y. .e..-   - .-,
,-e, y.
                                      , 9 g.-.--3-..---m,,,--,w,m e, ,,r..w,.   -,-~-,.m.   --,---9,, - - . - - - - - ~ .. ,,--c_ys 3---,-+.---,,-3.,-we,-,3, --,e- ---gr-,,r-*,w+ve-----v4   v*-= e-++-
.e..-
, 9 g.-.--3-..---m,,,--,w,m e,
r
,,r..w,.
-,-~-,.m.
--,---9,,
- -. - - - - - ~..
,,--c_ys 3---,-+.---,,-3.,-we,-,3,
--,e-
---gr-,,r-*,w+ve-----v4 v*-=
e-++-


W EMD                               Consequence                   Byron Station Valve                                                                                     Required Valve            Location             Rodel       Maximum                 of Failure to Number         Reference     P (psi) (1)               Close                       Modification"                   =
Valve W EMD Consequence Byron Station Valve Location Rodel Maximum of Failure to Required
,' Function n
,' Function Number Reference P (psi) (1)
;'VCT Outlet         LCV-1128,C       4GM72FB       100           Failure of either of two valves                   A i
Close Modification"
in series to close reduces
=
?                                                                    redundancy of providing
;'VCT Outlet LCV-1128,C 4GM72FB 100 Failure of either of two valves A
'                                                                    isolation. Alternate valve i
n i
in series to close reduces redundancy of providing
?
isolation.
Alternate valve i
will provide isolation.
will provide isolation.
RWST to           LCV-ll2D,E       8GM72FB       200           Failure of either of two valves                   B
RWST to LCV-ll2D,E 8GM72FB 200 Failure of either of two valves B
Suction CCP                                                       in parallel from the RWST to the
Suction CCP in parallel from the RWST to the suction of the CCP's reduces redundancy of providing isolation 2
;                                                                    suction of the CCP's reduces redundancy of providing isolation 2   -      -
of RWST during the recirculation phase following a LOCA.
of RWST during the recirculation phase following a LOCA. Isolation will be provided by a check valve in series with the two paths.
Isolation will be provided by a check valve in series with the two paths.
RHR Suction       8701B             12GM88SEH     700           Failure of either of the two                     B I' solation                                                       inner isolation valves'in                                 ~
RHR Suction 8701B 12GM88SEH 700 Failure of either of the two B
(Inner)                                                           series to close reduces the redundancy of providing                           ,
I' solation inner isolation valves'in
isolation. Isolation is                           ,
~
provided by closing the outer valve.
(Inner) series to close reduces the redundancy of providing isolation.
RHR Suction     8701A             12GM88SEH   700             Same as 8701B/8702B except for                   B Isolation         8702A                                         closing the inner valves.
Isolation is provided by closing the outer valve.
RHR Suction 8701A 12GM88SEH 700 Same as 8701B/8702B except for B
Isolation 8702A closing the inner valves.
(Outer)
(Outer)
(1)   As flow approaches zero, final functional requirement.
(1)
A: Adjust open and close torque switchsetting.
As flow approaches zero, final functional requirement.
8:. Change to limit control closure, change gear ratio.
A:
Adjust open and close torque switchsetting.
8:.
Change to limit control closure, change gear ratio.


Valve                 W EMD                               Consequence               Byron Station Valve       Location                 Model     Maximum               of Failure to                   Recuired   -
Valve W EMD Consequence Byron Station Valve Location Model Maximum of Failure to Recuired Function Number Reference P (psi) (1)
Function         Number             Reference   P (psi) (1)               Close                   Modification RHR           8716A, B               8GM 74FE     300             Failure of either of the two.             A Discharge                                                         valves in series to close reduces redundancy of providing low head train separation during cold leg recirculation phase following a LOCA. Train separation can be                     ._.
Close Modification RHR 8716A, B 8GM 74FE 300 Failure of either of the two.
achieved by closing other valve.
A Discharge valves in series to close reduces redundancy of providing low head train separation during cold leg recirculation phase following a LOCA.
RHR Heat           8804A           8GM84FE     300             Failure of valve to close                 A Exchanger                                                         precludes realignment of RHR for Discharge to                                                     normal operation.   (Valve is CCP Suction                                                       opened f or recirculation phase following a LOCA).
Train separation can be achieved by closing other valve.
RHR Heat           8804B           8GM74FE     300             Same as '8804A                             A Exchanger Discharge to SI Pump                                                                                                     ,
RHR Heat 8804A 8GM84FE 300 Failure of valve to close A
Suction RWST to SI               .8806     8GM72FB     200             If valve fails to close,                 B Pump Suction                                                     backflow into RWST would be prevented by a check valve.
Exchanger precludes realignment of RHR for Discharge to normal operation.
(Valve is CCP Suction opened f or recirculation phase following a LOCA).
RHR Heat 8804B 8GM74FE 300 Same as '8804A A
Exchanger Discharge to SI Pump Suction RWST to SI
.8806 8GM72FB 200 If valve fails to close, B
Pump Suction backflow into RWST would be prevented by a check valve.
(Valve is closed for recirculation phase following a LOCA).
(Valve is closed for recirculation phase following a LOCA).
(1)   As flow approaches zero, final functional requirement.
(1)
A:   Adjust open and close torque switchsetting.
As flow approaches zero, final functional requirement.
B:   Change to limit control closure, change gear ratio.
A:
Adjust open and close torque switchsetting.
B:
Change to limit control closure, change gear ratio.
I Y
I Y


                                                                                                                                                                  .      e       ~.
e
                                                                                                                      -3_                           ..                      ,
~.
_...j Valve                       W EMD                           Consequence                 Byron 'Statipn Valve                                   Location                               Model   Maximum                 of Failure to                     Required   .
-3_
Number                   Reference P (psi) (1)               Close                     Modification i                Function a
_...j Valve W EMD Consequence Byron 'Statipn Valve Location Model Maximum of Failure to Required i
CCP Suction                                           8807A,B                 6GM72FB     200         There are two valves in parallel         Unit 1-A SI Pump                                                 8924                                             (8807A,B) in series with one             Unit 2-B Suction                                                                                                 (8924). Failure of any of these Crossover                                                                                                valves to close will not preclude isolation.
Function Number Reference P (psi) (1)
SI Pump                                                   8923A,B           6GM72FB       200         If either valve fails to close,         Unit 1-A Suction                                                                                                 the other valve will provide the         Unit 2-B Cross Connect                                                                                           separation.   (Valves are closed to provide SI pump train separation).
Close Modification a
0            Valve is closed to prevent RCS              None Accumulator                                       8808A,B,C,D                 10GM88FN Discharge                                                                                               pressurization during cold shut-down operation. If valve fails to close, the accumulator may be depressurized by venting the N2 to containment.
CCP Suction 8807A,B 6GM72FB 200 There are two valves in parallel Unit 1-A SI Pump 8924 (8807A,B) in series with one Unit 2-B Suction (8924).
i RHR Cold                                           8809A,B                   8GM78FN       200         Valve is closed for switchover             None Leg Injection                                                                                           from cold leg to hot leg recirculation. Failure of valve to close will degrade flow to hot legs.
Failure of any of these valves to close will not preclude Crossover isolation.
i . ,
SI Pump 8923A,B 6GM72FB 200 If either valve fails to close, Unit 1-A Suction the other valve will provide the Unit 2-B Cross Connect separation.
(1)         As flow approaches zero, final functional requirement.
(Valves are closed to provide SI pump train separation).
A:         Adjust open and close torque switchsetting.
Accumulator 8808A,B,C,D 10GM88FN 0
B:         Change to limit control closure, change gear ratio.
Valve is closed to prevent RCS None Discharge pressurization during cold shut-down operation.
If valve fails to close, the accumulator may be depressurized by venting the N2 to containment.
i RHR Cold 8809A,B 8GM78FN 200 Valve is closed for switchover None Leg Injection from cold leg to hot leg recirculation.
Failure of valve to close will degrade flow to hot legs.
i.,
(1)
As flow approaches zero, final functional requirement.
A:
Adjust open and close torque switchsetting.
B:
Change to limit control closure, change gear ratio.
4 090lb}}
4 090lb}}

Latest revision as of 01:35, 20 December 2024

Responds to IE Bulletin 81-02,Suppl 1, Failure of Gate Type Valves to Close Against Differential Pressure, & Supplemental Response to Deficiency Rept 81-03.Consequence of Failure Description Modified Per Westinghouse
ML20038A845
Person / Time
Site: Byron, Braidwood  
Issue date: 11/16/1981
From: Swartz E
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 IEB-81-02, IEB-81-2, NUDOCS 8111240214
Download: ML20038A845 (6)


Text

m

/

s Commonwe::lth Edison

(

) one First National Plaza, Chicago, Imnois

(

) Address Reply to. Post Office Box 767

(

/ Chicago, lihnois 60690 Novembe r 16, 1981 Mr. James G. Keppler, Director I' f Directorate of Inspection and

-(

-i UOV,9 3 7gg * -f Enforcement - Region III U.S.

Nuclear Regulatory Commission 799 Roosevelt Road

<,.,,,,,l"*' "7' "o

Glen Ellyn, IL 60137

Subject:

Byron Station Units 1 and 2 Braidwood Station Unit s 1 and 2 1)

Response to I.E.

Bulletin 81-02 Supplement 1,

" Failure o f Gate Type Valves to Close Against Differential Pressure" 2)

Supplemental Response to 50.55(e)

Deficiency Report 81-03 NRC Docket Nos. 50-454/455/456/457 Reference (a):

T.

R.

Tramm letter to J.

G.

Keppler dated July 24, 1981.

(D):

J.

G.

Keppler letter to Cordell Reed dated August 18, 1981.

(c):

E.

D. Swartz letter to J.

G.

Keppler dated September 15, 1981.

Dear Mr. Keppler:

Reference (b) requested Commonwealth Edison Company to review Bulletin No. 81-02, Supplement 1, for applicability to our plants under construction and report the results within ninety (90) days.

The enclosure to this letter is provided to fulfill this ninety (90) day requirement for our Byron and Braidwood Stations.

Reference (c) fulfilled this ninety (90) day requirement for our LaSalle County Station.

The enclosure to this letter is also intended to supplement our Reference (a) response to the 10 CFR 50.55(e) reportable defi-ciency (number 81-03).

However, the enclosure includes some changes to the information submitted in Reference (a).

Specifically, the

" Consequence o f Failure" uescription has been modified in accordance with the Westinghouse determination, and six (6) valves have been added to the list (SI6808A,B,C,0, 8809A,B).

Additionally, the maxi-mum differential pressure and specific corrective action determina-tions for Byron Station have been made and are reported herein.

The bl l 8111240214 811116 PDR ADOCK 05000454 yG,I c, 0 19m G

PDR

J.

G.

Keppler Novembe r 16, 1981 specific modifications for the Braidwood units are expected to be available by March, 1982.

Finally, modifications are expected to be completed on Byron Unit 1 by January 1, 1982.

The schedule for completion of the Byron Unit 2 and Braidwood Units 1 and 2 modifications will be determined and submitted by April 1, 1982.

Our estimate of the hours expended in the review and prepa-ration of the enclosed supplementary Byron and Braidwood report is five and one half hours.

This does not, however, account for the Westinghouse efforts in preparing their determination on this matter.

Additionally, the manhour estimates for corrective action have not been determined.

To the best of my knowledge and belief, the statements contained herein are true ani correct.

In some respects these statements are not based upon my personal knowledge, but upon information furnished by other Commonwealth Edison employees.

Such information has been reviewed in accordance with Company practice and I believe it to be reliable.

Please address any questions you may have concerning this matter to this office.

Very t ruly yours, fb f

$x-E.

Douglas Swartz Nuclear Licensing Adminstrator Enclosure cc:

Director, NRC O f fice o f Inspection and Enforcement Region III Inspector - Byron Region III Inspector - Braidwood SUESCRIBED AND SWORN to of 8

/Mf.4I4.k.8.

Notary Public 1m 2878N

e 4

j ENCLOSURE i

J COMMONWEALTH EDISON COMPANY BYRON STATION UNITS 1 and 2 BRAIDWOOD STATION UNITS 1 and 2 RESPONSE TO I.E. BULLETIN 81-02 SUPPLEMENT 1 i

i 1

F i

2878N

,-e, y.

.e..-

, 9 g.-.--3-..---m,,,--,w,m e,

r

,,r..w,.

-,-~-,.m.

--,---9,,

- -. - - - - - ~..

,,--c_ys 3---,-+.---,,-3.,-we,-,3,

--,e-

---gr-,,r-*,w+ve-----v4 v*-=

e-++-

Valve W EMD Consequence Byron Station Valve Location Rodel Maximum of Failure to Required

,' Function Number Reference P (psi) (1)

Close Modification"

=

'VCT Outlet LCV-1128,C 4GM72FB 100 Failure of either of two valves A

n i

in series to close reduces redundancy of providing

?

isolation.

Alternate valve i

will provide isolation.

RWST to LCV-ll2D,E 8GM72FB 200 Failure of either of two valves B

Suction CCP in parallel from the RWST to the suction of the CCP's reduces redundancy of providing isolation 2

of RWST during the recirculation phase following a LOCA.

Isolation will be provided by a check valve in series with the two paths.

RHR Suction 8701B 12GM88SEH 700 Failure of either of the two B

I' solation inner isolation valves'in

~

(Inner) series to close reduces the redundancy of providing isolation.

Isolation is provided by closing the outer valve.

RHR Suction 8701A 12GM88SEH 700 Same as 8701B/8702B except for B

Isolation 8702A closing the inner valves.

(Outer)

(1)

As flow approaches zero, final functional requirement.

A:

Adjust open and close torque switchsetting.

8:.

Change to limit control closure, change gear ratio.

Valve W EMD Consequence Byron Station Valve Location Model Maximum of Failure to Recuired Function Number Reference P (psi) (1)

Close Modification RHR 8716A, B 8GM 74FE 300 Failure of either of the two.

A Discharge valves in series to close reduces redundancy of providing low head train separation during cold leg recirculation phase following a LOCA.

Train separation can be achieved by closing other valve.

RHR Heat 8804A 8GM84FE 300 Failure of valve to close A

Exchanger precludes realignment of RHR for Discharge to normal operation.

(Valve is CCP Suction opened f or recirculation phase following a LOCA).

RHR Heat 8804B 8GM74FE 300 Same as '8804A A

Exchanger Discharge to SI Pump Suction RWST to SI

.8806 8GM72FB 200 If valve fails to close, B

Pump Suction backflow into RWST would be prevented by a check valve.

(Valve is closed for recirculation phase following a LOCA).

(1)

As flow approaches zero, final functional requirement.

A:

Adjust open and close torque switchsetting.

B:

Change to limit control closure, change gear ratio.

I Y

e

~.

-3_

_...j Valve W EMD Consequence Byron 'Statipn Valve Location Model Maximum of Failure to Required i

Function Number Reference P (psi) (1)

Close Modification a

CCP Suction 8807A,B 6GM72FB 200 There are two valves in parallel Unit 1-A SI Pump 8924 (8807A,B) in series with one Unit 2-B Suction (8924).

Failure of any of these valves to close will not preclude Crossover isolation.

SI Pump 8923A,B 6GM72FB 200 If either valve fails to close, Unit 1-A Suction the other valve will provide the Unit 2-B Cross Connect separation.

(Valves are closed to provide SI pump train separation).

Accumulator 8808A,B,C,D 10GM88FN 0

Valve is closed to prevent RCS None Discharge pressurization during cold shut-down operation.

If valve fails to close, the accumulator may be depressurized by venting the N2 to containment.

i RHR Cold 8809A,B 8GM78FN 200 Valve is closed for switchover None Leg Injection from cold leg to hot leg recirculation.

Failure of valve to close will degrade flow to hot legs.

i.,

(1)

As flow approaches zero, final functional requirement.

A:

Adjust open and close torque switchsetting.

B:

Change to limit control closure, change gear ratio.

4 090lb