ML20056F407: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 20: Line 20:


=Text=
=Text=
{{#Wiki_filter:_   ._.      __                .                        .  .
{{#Wiki_filter:_
            .                                                                                        i l
i
l
]
      .-                                                                                            ]
BEFORE THE UNITED STATES 1
.                                          BEFORE THE UNITED STATES                                 I 1
NUCLEAR REGULATORY COMMISSION i
NUCLEAR REGULATORY COMMISSION                               i
)
                                                                                                      )
In the Matter of i
In the Matter of                                                                           i I
I 0maha Public Power District Docket No. 50-285 (Fort Calhoun Station l
0maha Public Power District                               Docket No. 50-285                 !
Unit No. 1)
(Fort Calhoun Station                                                                       l Unit No. 1)                                                                                 ;
I APPLICATION FOR AMENDMENT 0F i
I APPLICATION FOR AMENDMENT                                 !
4 OPERATING LICENSE i
4 0F                                            i OPERATING LICENSE i
Pursuant to Section 50.90 of the regulations of the U. S. Nuclear Regulatory
Pursuant to Section 50.90 of the regulations of the U. S. Nuclear Regulatory       _l Commission ("the Commission"), Omaha Public Power District, holder of Facility             :
_l Commission ("the Commission"), Omaha Public Power District, holder of Facility Operating License No. DPR-40, herewith requests that the Technical Specifications set l
Operating License No. DPR-40, herewith requests that the Technical Specifications set       ,
forth in Appendix A to that License be amended to incorporate changes to credit leak i
l' forth in Appendix A to that License be amended to incorporate changes to credit leak       i before break methodology to resolve Unresolved Saf ety Issue A-2, " Asymmetrical Blowdown   i Loads on Reactor Primary Coolant System," for the Fort Calhoun Station Unit No.1.           '
before break methodology to resolve Unresolved Saf ety Issue A-2, " Asymmetrical Blowdown i
                                                                                                    -i
Loads on Reactor Primary Coolant System," for the Fort Calhoun Station Unit No.1.
:                The proposed changes in Technical Specificai. ions are provided in Attachment A to   i this Application. A Discussion, Justification and No Significant Hazards Consideration     !
-i The proposed changes in Technical Specificai. ions are provided in Attachment A to i
Analysis, which demonstrates that the proposed changes do not involve significant hazards considerations, was previously transmitted as Attachment'B in an application       j for amendment dated February 12, 1993 (LIC-93-0074).           The proposed changes in     j specifications would not authorize any change in the types or any increase in the 4         amounts of effluents or a change in the authorized power level of the facility.             l WHEREFORE, Applicant respectfully requests that Specification 2.1.4 of Appendix     !
this Application. A Discussion, Justification and No Significant Hazards Consideration Analysis, which demonstrates that the proposed changes do not involve significant hazards considerations, was previously transmitted as Attachment'B in an application j
A to Facility Operating License No. DPR-40 be amended in tha form attached hereto as       !
for amendment dated February 12, 1993 (LIC-93-0074).
Attachment A.
The proposed changes in j
j                                                                                                     !
specifications would not authorize any change in the types or any increase in the 4
J
amounts of effluents or a change in the authorized power level of the facility.
WHEREFORE, Applicant respectfully requests that Specification 2.1.4 of Appendix A to Facility Operating License No. DPR-40 be amended in tha form attached hereto as Attachment A.
j J
(
(
I i
I i
i l
i l
1 i.
1 i.
9308270145   930820         "
9308270145 930820 DR ADOCK 05000285 l
DR ADOCK 05000285         $                                                        l PDR       @j                                                       l
PDR
@j l
v --
e
-w


A copy of this Application, including its attachments, has been submitted to the Director - Nebraska State Division of Radiological Health, as required by 10 CFR 50.91.
. A copy of this Application, including its attachments, has been submitted to the Director - Nebraska State Division of Radiological Health, as required by 10 CFR 50.91.
i OMAHA PUBLIC POWER DISTRICT By  N' Vice President Subscribed and sworn to before me this Md Ofb ay of b d , 1993.
i OMAHA PUBLIC POWER DISTRICT N'
U
By Vice President Subscribed and sworn to before me this M Ofb ay of b d, 1993.
              %bA-             idW                            (DGAL NIMtY4tse of muta Notary Public ymmmg My Comm. Esp.Fehr.17.1937 l}}
d U
idW
%bA-(DGAL NIMtY4tse of muta Notary Public ymmmg My Comm. Esp.Fehr.17.1937 l}}

Latest revision as of 13:10, 17 December 2024

Application for Amend to License DPR-40,incorporating Changes to Credit Leak Before Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys
ML20056F407
Person / Time
Site: Fort Calhoun 
Issue date: 08/20/1993
From: Gates W
OMAHA PUBLIC POWER DISTRICT
To:
Shared Package
ML20056F402 List:
References
REF-GTECI-A-02, REF-GTECI-RV, TASK-A-02, TASK-A-2, TASK-OR NUDOCS 9308270145
Download: ML20056F407 (2)


Text

_

i

]

BEFORE THE UNITED STATES 1

NUCLEAR REGULATORY COMMISSION i

)

In the Matter of i

I 0maha Public Power District Docket No. 50-285 (Fort Calhoun Station l

Unit No. 1)

I APPLICATION FOR AMENDMENT 0F i

4 OPERATING LICENSE i

Pursuant to Section 50.90 of the regulations of the U. S. Nuclear Regulatory

_l Commission ("the Commission"), Omaha Public Power District, holder of Facility Operating License No. DPR-40, herewith requests that the Technical Specifications set l

forth in Appendix A to that License be amended to incorporate changes to credit leak i

before break methodology to resolve Unresolved Saf ety Issue A-2, " Asymmetrical Blowdown i

Loads on Reactor Primary Coolant System," for the Fort Calhoun Station Unit No.1.

-i The proposed changes in Technical Specificai. ions are provided in Attachment A to i

this Application. A Discussion, Justification and No Significant Hazards Consideration Analysis, which demonstrates that the proposed changes do not involve significant hazards considerations, was previously transmitted as Attachment'B in an application j

for amendment dated February 12, 1993 (LIC-93-0074).

The proposed changes in j

specifications would not authorize any change in the types or any increase in the 4

amounts of effluents or a change in the authorized power level of the facility.

WHEREFORE, Applicant respectfully requests that Specification 2.1.4 of Appendix A to Facility Operating License No. DPR-40 be amended in tha form attached hereto as Attachment A.

j J

(

I i

i l

1 i.

9308270145 930820 DR ADOCK 05000285 l

PDR

@j l

v --

e

-w

. A copy of this Application, including its attachments, has been submitted to the Director - Nebraska State Division of Radiological Health, as required by 10 CFR 50.91.

i OMAHA PUBLIC POWER DISTRICT N'

By Vice President Subscribed and sworn to before me this M Ofb ay of b d, 1993.

d U

idW

%bA-(DGAL NIMtY4tse of muta Notary Public ymmmg My Comm. Esp.Fehr.17.1937 l