ML20056F437: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
l l
l l
1 I
1 I
:                                            AUG   6 1993 l
AUG 6 1993 l
Docket Nos. 50-424, 50-425 License Nos. NPF-68, NPF-81 Georgia Power Company ATTN: Mr. C. K. McCoy Vice President
Docket Nos. 50-424, 50-425 License Nos. NPF-68, NPF-81 Georgia Power Company ATTN: Mr. C. K. McCoy Vice President Vogtle Electric Generating Plant P. O. Box 1295 t
,            Vogtle Electric Generating Plant
Birmingham, AL 35201 l
P. O. Box 1295                                                                       t Birmingham, AL 35201 l
l Gentlemen:
Gentlemen:
l


==SUBJECT:==
==SUBJECT:==
LICENSED OPERATOR REQUALIFICATION PROGRAM EVALUATION - INSPECTION REPORT NOS. 50-424/93-18 AND 50-425/93-18
LICENSED OPERATOR REQUALIFICATION PROGRAM EVALUATION - INSPECTION REPORT NOS. 50-424/93-18 AND 50-425/93-18 This is to advise you of a special initiative that is being performed at l
This is to advise you of a special initiative that is being performed at l   operating reactors. It will include an inspection to be performed at your Vogtle l   Electric Generating Plant. The initiative is entitled the " Licensed Operator Requalification Program Evaluation".
operating reactors. It will include an inspection to be performed at your Vogtle l
Electric Generating Plant.
The initiative is entitled the " Licensed Operator Requalification Program Evaluation".
The purpose of the inspection is to verify that your requalification program for licensed operators incorporates the requirements of 10 CFR 55. In addition, an inspection of some training programs under procedure 41500 will be conducted.
The purpose of the inspection is to verify that your requalification program for licensed operators incorporates the requirements of 10 CFR 55. In addition, an inspection of some training programs under procedure 41500 will be conducted.
The inspection is scheduled for the requalification cycle beginning November 1, 1993, in lieu of the previously scheduled requalification examination and will encompass one of the five examination weeks. Several three day site visits may also be made by one or two examinert prior to or after the inspection week in order to observe operator simulator and classroom training activities.       This inspection effort will be led by Mr. R. Aiello.
The inspection is scheduled for the requalification cycle beginning November 1, 1993, in lieu of the previously scheduled requalification examination and will encompass one of the five examination weeks. Several three day site visits may also be made by one or two examinert prior to or after the inspection week in order to observe operator simulator and classroom training activities.
If you have any questions in the interim regarding the inspection program, please     l contact Mr. Aiello at 004) 331-5562.
This inspection effort will be led by Mr. R. Aiello.
l Sincerely,                               1 ORIGINAL SIGNED BY T. A. PEEBLES           l Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety               1 cc:     (See page 2) l l
If you have any questions in the interim regarding the inspection program, please contact Mr. Aiello at 004) 331-5562.
              .n 9308270226 930806           E                                                 \\
l Sincerely, ORIGINAL SIGNED BY T. A. PEEBLES Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety 1
PDR       ADOCK 05000424     is
cc:
(See page 2)
.n 9308270226 930806 E
\\\\
PDR ADOCK 05000424 is


l h
l h
i l
i Carolina Power & Light Co.
Carolina Power & Light Co.                 2 AUG           6 $%
2 AUG 6 $%
cc:   Mr. J. D. Woodard Senior Vice President i           Georgia Power Company Nuclear Operations                                                               .
cc:
P. O. Box 1295 Birmingham, AL 35201 J. B. Beasley General Manager, Nuclear Operations i
Mr. J. D. Woodard Senior Vice President i
l           Georgia Power Company P. O. Box 1600 Waynesboro, GA 30830                                                             ,
Georgia Power Company Nuclear Operations P. O. Box 1295 Birmingham, AL 35201 J. B. Beasley General Manager, Nuclear Operations i
l I           J. A. Bailey l           Manager-Licensing i           Georgia Power Company P. O. Box 1295                                                                 i Birmingham, AL 35201 Nancy G. Cowles, Counsel Office of the Consumer's Utility Council                                                               !
l Georgia Power Company P. O. Box 1600 Waynesboro, GA 30830 l
84 Peachtree Street, NW, Suite 201                                               l Atlanta, GA 30303-2318                                                           l l
I J. A. Bailey l
Office of Planning and Budget Room 615B 270 Washington Street, SW Atlanta, GA 30334 Office of the County Commissioner Burke County Ccamission Waynesboro, GA 30830                                                             ;
Manager-Licensing i
Harold Reheis, Director                                                         i Department of Natural Resources                                                 ;
Georgia Power Company P. O. Box 1295 i
205 Butler Street, SE, Suite 1252                                               ;
Birmingham, AL 35201 Nancy G. Cowles, Counsel Office of the Consumer's Utility Council 84 Peachtree Street, NW, Suite 201 Atlanta, GA 30303-2318 l
Atlanta, GA 30334 Thomas Hill, Manager                                                             l Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta, GA 30354 Attorney General Law Department                                                                   ,
Office of Planning and Budget Room 615B 270 Washington Street, SW Atlanta, GA 30334 Office of the County Commissioner Burke County Ccamission Waynesboro, GA 30830 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Thomas Hill, Manager Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta, GA 30354 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 cc cont'd:
132 Judicial Building Atlanta, GA 30334 cc cont'd:   (See page 3) r
(See page 3) r


Carolina Power & Light Co.                 3 AUG   6 1993           !
Carolina Power & Light Co.
cc cont'd:                                                                             .
3 AUG 6 1993 cc cont'd:
I Dan H. Smith Vice President                                                                 j Power Supply Operations Oglethorpe Power Corporation 2100 E. Exchange Place                                                         !
I Dan H. Smith Vice President j
Tucker, GA 30085-1349                                                         ;
Power Supply Operations Oglethorpe Power Corporation 2100 E. Exchange Place Tucker, GA 30085-1349 Charles A. Patrizia, Esq.
Charles A. Patrizia, Esq.                                                     !
Paul, Hastings, Janofsky & Walker 12th Floor 1050 Connecticut Avenue, NW Washington, D. C.
Paul, Hastings, Janofsky & Walker 12th Floor                                                                     ;
20036 R. E. Dorman, Plant Training and Emergency Preparedness Manager Vogtle Electric Generating Plant i
1050 Connecticut Avenue, NW Washington, D. C. 20036                                                   !
P. O. Box 1600 l
R. E. Dorman, Plant Training and                                               !
Waynesboro, GA 30830 i
;              Emergency Preparedness Manager                                               ,
l bec:
Vogtle Electric Generating Plant                                               i P. O. Box 1600                                                                 l Waynesboro, GA 30830                                                           i l
D. Seymour, RII l
bec:   D. Seymour, RII                                                               l D. Hood, NRR                                                                   l P. Skinner, RII                                                               ;
D. Hood, NRR l
A. Herdt, RII                                                                 :
P. Skinner, RII A. Herdt, RII l
l            R. Aiello, DRS                                                                 l Document Control Desk i
R. Aiello, DRS l
NRC Senior Resident Inspector                                                 ;
Document Control Desk i
U.S. Nuclear Regulatory Commission P. O. Box 572                                                                 i Waynesboro, GA 30830 I
NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 572 i
I l                                                                                            l RII:DRS                     RII:DRS           RII:DRS RII:DR 8 01                         &1                 ffnD RMcWhorter:rm/sd             RAiello       g Llawyer  TP  les 08/g/93                   y08/_f/93           08/5 /93 08/[/93 Document name:     G:\LA\V0GTLE\R1890DA.RDM i
Waynesboro, GA 30830 I
l RII:DRS RII:DRS RII:DRS RII:DR 8 01
&1 ffnD RMcWhorter:rm/sd RAiello 08/g/93 y08/_f/93 g Llawyer TP les 08/5 /93 08/[/93 Document name:
G:\\LA\\V0GTLE\\R1890DA.RDM i
t
t
                                                                                      .-- -}}
-}}

Latest revision as of 13:10, 17 December 2024

Advises of Special Initiative, Licensed Operator Requalification Program Evaluation Insp Being Performed at Operating Reactors.Insp Scheduled for Requalification Cycle Beginning 931101
ML20056F437
Person / Time
Site: Vogtle  
Issue date: 08/06/1993
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mccoy C
GEORGIA POWER CO.
References
NUDOCS 9308270226
Download: ML20056F437 (3)


Text

.

l l

1 I

AUG 6 1993 l

Docket Nos. 50-424, 50-425 License Nos. NPF-68, NPF-81 Georgia Power Company ATTN: Mr. C. K. McCoy Vice President Vogtle Electric Generating Plant P. O. Box 1295 t

Birmingham, AL 35201 l

l Gentlemen:

SUBJECT:

LICENSED OPERATOR REQUALIFICATION PROGRAM EVALUATION - INSPECTION REPORT NOS. 50-424/93-18 AND 50-425/93-18 This is to advise you of a special initiative that is being performed at l

operating reactors. It will include an inspection to be performed at your Vogtle l

Electric Generating Plant.

The initiative is entitled the " Licensed Operator Requalification Program Evaluation".

The purpose of the inspection is to verify that your requalification program for licensed operators incorporates the requirements of 10 CFR 55. In addition, an inspection of some training programs under procedure 41500 will be conducted.

The inspection is scheduled for the requalification cycle beginning November 1, 1993, in lieu of the previously scheduled requalification examination and will encompass one of the five examination weeks. Several three day site visits may also be made by one or two examinert prior to or after the inspection week in order to observe operator simulator and classroom training activities.

This inspection effort will be led by Mr. R. Aiello.

If you have any questions in the interim regarding the inspection program, please contact Mr. Aiello at 004) 331-5562.

l Sincerely, ORIGINAL SIGNED BY T. A. PEEBLES Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety 1

cc:

(See page 2)

.n 9308270226 930806 E

\\\\

PDR ADOCK 05000424 is

l h

i Carolina Power & Light Co.

2 AUG 6 $%

cc:

Mr. J. D. Woodard Senior Vice President i

Georgia Power Company Nuclear Operations P. O. Box 1295 Birmingham, AL 35201 J. B. Beasley General Manager, Nuclear Operations i

l Georgia Power Company P. O. Box 1600 Waynesboro, GA 30830 l

I J. A. Bailey l

Manager-Licensing i

Georgia Power Company P. O. Box 1295 i

Birmingham, AL 35201 Nancy G. Cowles, Counsel Office of the Consumer's Utility Council 84 Peachtree Street, NW, Suite 201 Atlanta, GA 30303-2318 l

Office of Planning and Budget Room 615B 270 Washington Street, SW Atlanta, GA 30334 Office of the County Commissioner Burke County Ccamission Waynesboro, GA 30830 Harold Reheis, Director Department of Natural Resources 205 Butler Street, SE, Suite 1252 Atlanta, GA 30334 Thomas Hill, Manager Radioactive Materials Program Department of Natural Resources 4244 International Parkway Suite 114 Atlanta, GA 30354 Attorney General Law Department 132 Judicial Building Atlanta, GA 30334 cc cont'd:

(See page 3) r

Carolina Power & Light Co.

3 AUG 6 1993 cc cont'd:

I Dan H. Smith Vice President j

Power Supply Operations Oglethorpe Power Corporation 2100 E. Exchange Place Tucker, GA 30085-1349 Charles A. Patrizia, Esq.

Paul, Hastings, Janofsky & Walker 12th Floor 1050 Connecticut Avenue, NW Washington, D. C.

20036 R. E. Dorman, Plant Training and Emergency Preparedness Manager Vogtle Electric Generating Plant i

P. O. Box 1600 l

Waynesboro, GA 30830 i

l bec:

D. Seymour, RII l

D. Hood, NRR l

P. Skinner, RII A. Herdt, RII l

R. Aiello, DRS l

Document Control Desk i

NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 572 i

Waynesboro, GA 30830 I

l RII:DRS RII:DRS RII:DRS RII:DR 8 01

&1 ffnD RMcWhorter:rm/sd RAiello 08/g/93 y08/_f/93 g Llawyer TP les 08/5 /93 08/[/93 Document name:

G:\\LA\\V0GTLE\\R1890DA.RDM i

t

-