ML20056H595: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ -
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ -
SC   .
SC 50 ' ! ZA f
50 ' ! ZA f                             DEFENSE NUCLEAR AGENCY ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE 6901 WISCONSlN AVENUE
DEFENSE NUCLEAR AGENCY ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE 6901 WISCONSlN AVENUE BETHESDA, M ARYLAND 208B9-5603 AFRRI/RSDR 0 9 SEP 1993 I
          . - -                        BETHESDA, M ARYLAND 208B9-5603 AFRRI/RSDR                                                                         0 9 SEP 1993 I Document Control Desk US Nuclear Regulatory Commission Washington, DC 20555
Document Control Desk US Nuclear Regulatory Commission Washington, DC 20555


==Dear Sir:==
==Dear Sir:==
Based on the telephone conversation of 31 August between Mr.
Based on the telephone conversation of 31 August between Mr.
Arthur Della Ratta (NRC) and Mr. Robert George (AFRRI), the Armed                                 '
Arthur Della Ratta (NRC) and Mr. Robert George (AFRRI), the Armed Forces Radiobiology Research Institute (license R-84, docket 50-170) reactor facility physical security plan dated 01 August 1993 is changed as follows:
Forces Radiobiology Research Institute (license R-84, docket 50-170) reactor facility physical security plan dated 01 August 1993 is changed as follows:
: a. The newly required Department of Defense disclosure statement required by DoD Directive 5210.83 is added to the front and back covers. The document is unclassified but with controlled distribution. 5 U.S.C. 522 (b) (3) is the section of the FOIA authorizing this to be withheld, and 10 U.S.C.
: a. The newly required Department of Defense disclosure statement required by DoD Directive 5210.83 is added to the front and back covers. The document is unclassified but with controlled distribution. 5 U.S.C. 522 (b) (3) is the section of the FOIA authorizing this to be withheld, and 10 U.S.C. 128 is the legal authorization for the new
128 is the legal authorization for the new
                    " Unclassified Controlled Nuclear Information" designation.
" Unclassified Controlled Nuclear Information" designation.
: b. The date and revision number are added to each page.
: b. The date and revision number are added to each page.
: c. On page 2, paragraph 3.b. (2) (c) is added to clarify that foyer 3106A is a part of the RCA and not the CAA.
: c. On page 2, paragraph 3.b. (2) (c) is added to clarify that foyer 3106A is a part of the RCA and not the CAA.
Line 33: Line 33:
: 50. 54 (p) (2) and they do not decrease the effectiveness of the plan. The original 01 August 1993 plan has been superseded in its entirety and is being reissued as the attached Revision 1.
: 50. 54 (p) (2) and they do not decrease the effectiveness of the plan. The original 01 August 1993 plan has been superseded in its entirety and is being reissued as the attached Revision 1.
The attached document contains DoD Unclassified Nuclear Information (DoD UNCI) and, in accordance with 10 CFR 2.790, public disclosure of the details of this physical security plan is not in the public interest. As such, this plan is to be withheld from public disclosure.
The attached document contains DoD Unclassified Nuclear Information (DoD UNCI) and, in accordance with 10 CFR 2.790, public disclosure of the details of this physical security plan is not in the public interest. As such, this plan is to be withheld from public disclosure.
PDR   i                                                               s   y
PDR i
s y


i If you need further information, please contact the undersigned or Mr. Robert George at (301)295-1290.
i If you need further information, please contact the undersigned or Mr. Robert George at (301)295-1290.
Line 39: Line 40:


==Attachment:==
==Attachment:==
Mark Moore I   as stated                 Reactor Facility Director Cy Furn:
Mark Moore I
as stated Reactor Facility Director Cy Furn:
Mr. Marvin Mendonca, Mail Stop 11B20 Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 Regional Administrator, Region I (2)
Mr. Marvin Mendonca, Mail Stop 11B20 Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 Regional Administrator, Region I (2)
Mr. Arthur Della Ratta (1)
Mr. Arthur Della Ratta (1)
Mr. Thomas Dragoun (1)
Mr. Thomas Dragoun (1)
US Nuclear Regulatory Commission 475 Allendale Road                                               ;
US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 i
King of Prussia, PA 19406 i
l 1
l 1
t l
t l
Line 50: Line 51:
i l
i l
l
l
                                                              -- ---}}
-}}

Latest revision as of 12:39, 17 December 2024

Forwards Rev 1 to Armed Forces Radiobiology Research Inst Reactor Facility Physical Security Plan,Per 10CFR50.54(p)(2).Plan Withheld,Per 10CFR2.790
ML20056H595
Person / Time
Site: Armed Forces Radiobiology Research Institute
Issue date: 09/09/1993
From: Maria Moore
DEFENSE, DEPT. OF, DEFENSE NUCLEAR AGENCY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9309100162
Download: ML20056H595 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ -

SC 50 ' ! ZA f

DEFENSE NUCLEAR AGENCY ARMED FORCES RADIOBIOLOGY RESEARCH INSTITUTE 6901 WISCONSlN AVENUE BETHESDA, M ARYLAND 208B9-5603 AFRRI/RSDR 0 9 SEP 1993 I

Document Control Desk US Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

Based on the telephone conversation of 31 August between Mr.

Arthur Della Ratta (NRC) and Mr. Robert George (AFRRI), the Armed Forces Radiobiology Research Institute (license R-84, docket 50-170) reactor facility physical security plan dated 01 August 1993 is changed as follows:

a. The newly required Department of Defense disclosure statement required by DoD Directive 5210.83 is added to the front and back covers. The document is unclassified but with controlled distribution. 5 U.S.C. 522 (b) (3) is the section of the FOIA authorizing this to be withheld, and 10 U.S.C.

128 is the legal authorization for the new

" Unclassified Controlled Nuclear Information" designation.

b. The date and revision number are added to each page.
c. On page 2, paragraph 3.b. (2) (c) is added to clarify that foyer 3106A is a part of the RCA and not the CAA.
d. On page 6, the last sentence in paragraph 5.c.(2) is changed to clarify the frequency at which the Security Watchman makes rounds on weekends and holidays.

These changes have been reviewed for compliance with 10 CFR

50. 54 (p) (2) and they do not decrease the effectiveness of the plan. The original 01 August 1993 plan has been superseded in its entirety and is being reissued as the attached Revision 1.

The attached document contains DoD Unclassified Nuclear Information (DoD UNCI) and, in accordance with 10 CFR 2.790, public disclosure of the details of this physical security plan is not in the public interest. As such, this plan is to be withheld from public disclosure.

PDR i

s y

i If you need further information, please contact the undersigned or Mr. Robert George at (301)295-1290.

Sincerely, t

Attachment:

Mark Moore I

as stated Reactor Facility Director Cy Furn:

Mr. Marvin Mendonca, Mail Stop 11B20 Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 Regional Administrator, Region I (2)

Mr. Arthur Della Ratta (1)

Mr. Thomas Dragoun (1)

US Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 i

l 1

t l

l l

i l

l

-