ML20057D770: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.......... ~....
~,
sunk least L
sie Portland General Electric Company J
N James E. Cross Vice President and Chief Nuclear Officer September 30,1993
-]
1 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555
 
==Dear Sirs:==
Trojan Nuclear Plant.
Permanently Defueled Emergency Plan and Emercency Plan Imolementine Procedure.s
. This letter transmits the Permanently Defueled Emergency Plan (PGE-1060) and Emergency Plan Implementing Procedures for the Trojan Nuclear Plant. PGE-1060 replaces PGE-1008, " Trojan Nuclear Plant Emergency Plan," in its entirety.
Attachment I provides a copy of PGE-1060, " Trojan Nuclear Plant Permanently Defueled Emergency Plan." Copies of the procedures implementing the Permanently Defueled Emergency
- Plan are included as Attachment II.
1 Sincerely, S. M. Quennoz for J. E. Cross A"achments P
288 a 8s888844 g RW
~
w121 SW Salmon Street, Portland, OR 97204 503/464-8897
 
Document Control Desk September 30,1993 Pace 2 c:
Mr. Bobby H. Faulkenberry (2)
Regional Administrator, Region V U. S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. James Melfi NRC Resident Inspector
~
Trojan Nuclear Plant
 
4 Attachment I I
)
--}}

Latest revision as of 11:50, 17 December 2024

Forwards Rev 0 to PGE-1060, Trojan Nuclear Plant Permanently Defueled Emergency Plan & Permanently Defueled Epips,Including Rev 0 to EPIP 1,Rev 0 to EPIP 2,Rev 0 to EPIP 3,Rev 0 to EPIP 4,Rev 0 to EPIP 5 & Rev 0 to EPIP 6
ML20057D770
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/30/1993
From: Cross J, Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20057D771 List:
References
NUDOCS 9310050345
Download: ML20057D770 (3)


Text

.......... ~....

~,

sunk least L

sie Portland General Electric Company J

N James E. Cross Vice President and Chief Nuclear Officer September 30,1993

-]

1 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555

Dear Sirs:

Trojan Nuclear Plant.

Permanently Defueled Emergency Plan and Emercency Plan Imolementine Procedure.s

. This letter transmits the Permanently Defueled Emergency Plan (PGE-1060) and Emergency Plan Implementing Procedures for the Trojan Nuclear Plant. PGE-1060 replaces PGE-1008, " Trojan Nuclear Plant Emergency Plan," in its entirety.

Attachment I provides a copy of PGE-1060, " Trojan Nuclear Plant Permanently Defueled Emergency Plan." Copies of the procedures implementing the Permanently Defueled Emergency

- Plan are included as Attachment II.

1 Sincerely, S. M. Quennoz for J. E. Cross A"achments P

288 a 8s888844 g RW

~

w121 SW Salmon Street, Portland, OR 97204 503/464-8897

Document Control Desk September 30,1993 Pace 2 c:

Mr. Bobby H. Faulkenberry (2)

Regional Administrator, Region V U. S. Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr. James Melfi NRC Resident Inspector

~

Trojan Nuclear Plant

4 Attachment I I

)

--