ML20058K904: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:a l | {{#Wiki_filter:a l | ||
NORTHERN | NORTHERN STATES POWER COMPANY M 8 N N E A PO LI S. M I N N E S OTA B540t Novenher 24, 1975 Mr. J. G. l'eppler Director - P,egion III Office of Inspection and Enforcement United States Nuclear Regulatory Corniission 799 Roosevelt Road Glen Ellyn, Illinois 60137 | ||
==Dear Mr. Keppler:== | ==Dear Mr. Keppler:== | ||
~ | |||
MONTICELLO NUCLEAR GENERATING FLANT Docket Eo.50-263 License No. DPR-22 This conthly summary report is subnitted as requested in IE Eulletin 75-04A. | |||
MONTICELLO NUCLEAR GENERATING FLANT Docket Eo.50-263 License No. DPR-22 This conthly summary report is subnitted as requested in IE Eulletin 75-04A. | (As discussed with Mr. E. Jordan of your office, this report is being submitted on novenber 24, 1975, rather than November 23, 1975.) | ||
As a result of the review of fire dc+ection sensor and firc hose station locations, the following changes to the facility are scheduled to be completed by May 23, 1976: | As a result of the review of fire dc+ection sensor and firc hose station locations, the following changes to the facility are scheduled to be completed by May 23, 1976: | ||
1. | |||
Installation of fire detection sensors in the Standby Cas Treatn ent Room, the 4.16 KV Switchgcar Area, and the Intake Stru'eture Pump Room. | |||
2. | |||
Yours very truly, L. | Installation of a fire hose station in the Intake Structure Punp Room. | ||
^1-n. | |||
fm r 'i r bose stations locatcd in the Adri | |||
Vice President - Power Production and System Operation ec: | .t | ||
CF | ! ~: Pu il d i.:r. h vc been fitted with nossles designed for use on electrical fircs. | ||
Yours very truly, h/ h L. | |||
. k'ac ht e r Vice President - Power Production and System Operation ec: | |||
Mr. R. S. Boyd Mr. G. Charnoff Minnesota Pollution Control Agency Attention: Mr. J. k'. | |||
Fernan 9104260267 751124 ' | |||
CF ADOCK 05000263 CF | |||
-}} | |||
Latest revision as of 08:23, 17 December 2024
| ML20058K904 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 11/24/1975 |
| From: | Wachter L NORTHERN STATES POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| IEB-75-04, IEB-75-4, NUDOCS 9104260267 | |
| Download: ML20058K904 (1) | |
Text
a l
NORTHERN STATES POWER COMPANY M 8 N N E A PO LI S. M I N N E S OTA B540t Novenher 24, 1975 Mr. J. G. l'eppler Director - P,egion III Office of Inspection and Enforcement United States Nuclear Regulatory Corniission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
~
MONTICELLO NUCLEAR GENERATING FLANT Docket Eo.50-263 License No. DPR-22 This conthly summary report is subnitted as requested in IE Eulletin 75-04A.
(As discussed with Mr. E. Jordan of your office, this report is being submitted on novenber 24, 1975, rather than November 23, 1975.)
As a result of the review of fire dc+ection sensor and firc hose station locations, the following changes to the facility are scheduled to be completed by May 23, 1976:
1.
Installation of fire detection sensors in the Standby Cas Treatn ent Room, the 4.16 KV Switchgcar Area, and the Intake Stru'eture Pump Room.
2.
Installation of a fire hose station in the Intake Structure Punp Room.
^1-n.
fm r 'i r bose stations locatcd in the Adri
.t
! ~: Pu il d i.:r. h vc been fitted with nossles designed for use on electrical fircs.
Yours very truly, h/ h L.
. k'ac ht e r Vice President - Power Production and System Operation ec:
Mr. R. S. Boyd Mr. G. Charnoff Minnesota Pollution Control Agency Attention: Mr. J. k'.
Fernan 9104260267 751124 '
-