ML20058K904: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:a l                                               '
{{#Wiki_filter:a l
NORTHERN               STATES             POWER           COMPANY M 8 N N E A PO LI S. M I N N E S OTA B540t Novenher 24, 1975 Mr. J. G. l'eppler Director - P,egion III Office of Inspection and Enforcement United States Nuclear Regulatory Corniission 799 Roosevelt Road Glen Ellyn, Illinois         60137
NORTHERN STATES POWER COMPANY M 8 N N E A PO LI S. M I N N E S OTA B540t Novenher 24, 1975 Mr. J. G. l'eppler Director - P,egion III Office of Inspection and Enforcement United States Nuclear Regulatory Corniission 799 Roosevelt Road Glen Ellyn, Illinois 60137


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==
 
~
                      ~
MONTICELLO NUCLEAR GENERATING FLANT Docket Eo.50-263 License No. DPR-22 This conthly summary report is subnitted as requested in IE Eulletin 75-04A.
MONTICELLO NUCLEAR GENERATING FLANT Docket Eo.50-263 License No. DPR-22 This conthly summary report is subnitted as requested in IE Eulletin 75-04A.   (As discussed with Mr. E. Jordan of your office, this report is being submitted on novenber 24, 1975, rather than November 23, 1975.)
(As discussed with Mr. E. Jordan of your office, this report is being submitted on novenber 24, 1975, rather than November 23, 1975.)
As a result of the review of fire dc+ection sensor and firc hose station locations, the following changes to the facility are scheduled to be completed by May 23, 1976:
As a result of the review of fire dc+ection sensor and firc hose station locations, the following changes to the facility are scheduled to be completed by May 23, 1976:
: 1. Installation of fire detection sensors in the Standby Cas Treatn ent Room, the 4.16 KV Switchgcar Area, and the Intake Stru'eture Pump Room.
1.
: 2. Installation of a fire hose station in the Intake Structure Punp Room.
Installation of fire detection sensors in the Standby Cas Treatn ent Room, the 4.16 KV Switchgcar Area, and the Intake Stru'eture Pump Room.
        ^1-n. fm r 'i r bose stations locatcd in the Adri                   .t     ! ~: Pu il d i .:r. h vc been fitted with nossles designed for use on electrical fircs.
2.
Yours very truly, L.
Installation of a fire hose station in the Intake Structure Punp Room.
h/
^1-n.
                                                              . k'ac ht e r h
fm r 'i r bose stations locatcd in the Adri
Vice President - Power Production and System Operation ec:   Mr. R. S. Boyd Mr. G. Charnoff Minnesota Pollution Control Agency Attention: Mr . J. k'. Fernan 9104260267 751124 '
.t
CF   ADOCK 05000263 CF ,
! ~: Pu il d i.:r. h vc been fitted with nossles designed for use on electrical fircs.
                                                                ;}}
Yours very truly, h/ h L.
. k'ac ht e r Vice President - Power Production and System Operation ec:
Mr. R. S. Boyd Mr. G. Charnoff Minnesota Pollution Control Agency Attention: Mr. J. k'.
Fernan 9104260267 751124 '
CF ADOCK 05000263 CF
-}}

Latest revision as of 08:23, 17 December 2024

Submits Monthly Summary Rept Requested in IE Bulletin 75-04A as Result of Review of Fire Detection Sensor & Fire Hose Station Locations
ML20058K904
Person / Time
Site: Monticello 
Issue date: 11/24/1975
From: Wachter L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-75-04, IEB-75-4, NUDOCS 9104260267
Download: ML20058K904 (1)


Text

a l

NORTHERN STATES POWER COMPANY M 8 N N E A PO LI S. M I N N E S OTA B540t Novenher 24, 1975 Mr. J. G. l'eppler Director - P,egion III Office of Inspection and Enforcement United States Nuclear Regulatory Corniission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

~

MONTICELLO NUCLEAR GENERATING FLANT Docket Eo.50-263 License No. DPR-22 This conthly summary report is subnitted as requested in IE Eulletin 75-04A.

(As discussed with Mr. E. Jordan of your office, this report is being submitted on novenber 24, 1975, rather than November 23, 1975.)

As a result of the review of fire dc+ection sensor and firc hose station locations, the following changes to the facility are scheduled to be completed by May 23, 1976:

1.

Installation of fire detection sensors in the Standby Cas Treatn ent Room, the 4.16 KV Switchgcar Area, and the Intake Stru'eture Pump Room.

2.

Installation of a fire hose station in the Intake Structure Punp Room.

^1-n.

fm r 'i r bose stations locatcd in the Adri

.t

! ~: Pu il d i.:r. h vc been fitted with nossles designed for use on electrical fircs.

Yours very truly, h/ h L.

. k'ac ht e r Vice President - Power Production and System Operation ec:

Mr. R. S. Boyd Mr. G. Charnoff Minnesota Pollution Control Agency Attention: Mr. J. k'.

Fernan 9104260267 751124 '

CF ADOCK 05000263 CF

-