ML20062E685: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:--          - L* o   -- .
{{#Wiki_filter:- L* o i
i 1           ..t
1
                        ~ 't                                                                                 ,
..t
1 Distribution:                                                               ..
~ 't 1
L. Beltracchi M.M. Mendonca
Distribution:
  .                    S.D. Rubin
L. Beltracchi M.M. Mendonca S.D. Rubin P. Check D.G. Eisenhut Z.R. Rosztoczy R. Satterfield I
  .                    P. Check D.G. Eisenhut Z.R. Rosztoczy R. Satterfield I                   D. Fieno
D. Fieno S.H. Weiss F.D. Coffman G. Holahan
    ;                  S.H. Weiss F.D. Coffman G. Holahan
()
()         P. Norian J. Voglewede
P. Norian J. Voglewede F. Odar L.E. Phillips PDR(1)-
      '                  F. Odar L.E. Phillips PDR(1)-
Enclosed is the following for your information:
Enclosed is the following for your information:
: 1. Ltr., dated October 17,1978, MFN-389-78, "Results of ODYN Calculations Requested by NRC Staff".
1.
: 2. Ltr., dated October 26,1978, MFN-399-78, " Transmittal of Requested Data and Calculational Results".
Ltr., dated October 17,1978, MFN-389-78, "Results of ODYN Calculations Requested by NRC Staff".
          -                  3. Ltr., dated October 10,1978, MFN-384-78, " Potential Differences Between i   (-).               GE and ODYN Models".
2.
t From:   Fuat Odar, Analysis Branch, Extenstion 27911.     . il-I gggD}9                                   l r}}
Ltr., dated October 26,1978, MFN-399-78, " Transmittal of Requested Data and Calculational Results".
3.
Ltr., dated October 10,1978, MFN-384-78, " Potential Differences Between i
(-).
GE and ODYN Models".
t
. il-From:
Fuat Odar, Analysis Branch, Extenstion 27911.
gggD}9 r}}

Latest revision as of 23:39, 16 December 2024

Provides Results of Test on Facility at End of Cycle 2 Conditions Using Proposed Licensing Basis Odyn Model
ML20062E685
Person / Time
Site: Peach Bottom 
Issue date: 10/17/1978
From: Cook K
GENERAL ELECTRIC CO.
To: Schroeder F
Office of Nuclear Reactor Regulation
Shared Package
ML20062E688 List:
References
MFN-389-78, NUDOCS 7812110272
Download: ML20062E685 (20)


Text

- L* o i

1

..t

~ 't 1

Distribution:

L. Beltracchi M.M. Mendonca S.D. Rubin P. Check D.G. Eisenhut Z.R. Rosztoczy R. Satterfield I

D. Fieno S.H. Weiss F.D. Coffman G. Holahan

()

P. Norian J. Voglewede F. Odar L.E. Phillips PDR(1)-

Enclosed is the following for your information:

1.

Ltr., dated October 17,1978, MFN-389-78, "Results of ODYN Calculations Requested by NRC Staff".

2.

Ltr., dated October 26,1978, MFN-399-78, " Transmittal of Requested Data and Calculational Results".

3.

Ltr., dated October 10,1978, MFN-384-78, " Potential Differences Between i

(-).

GE and ODYN Models".

t

. il-From:

Fuat Odar, Analysis Branch, Extenstion 27911.

gggD}9 r