ML20063K097: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_p | {{#Wiki_filter:_p a. | ||
a na a a | |||
...e. | |||
Seab | + -..' | ||
~- | |||
Energy Service Corporation | ~n | ||
+ | |||
Attention: | = | ||
x g-Y Seab NH 03874 | |||
~ | |||
Telephone (603)474-9521 | |||
= | |||
hh Facsimile (603)474 2987 | |||
[ | |||
Energy Service Corporation Ted C. Feigenbaum Senior Vice President and NYN-94016 Chief NuclearOfficer February 15,1994 i | |||
. United States Nuclear Regulatory Commission Washington, D.C. '0555 F | |||
Attention: | |||
Doctuent Control Desk | |||
==Reference:== | ==Reference:== | ||
Facility Operating License No. NPF-86. Docket No. 50-443 | Facility Operating License No. NPF-86. Docket No. 50-443 | ||
==Subject:== | ==Subject:== | ||
Annual Repon of Primary Coolant Specific Activity | Annual Repon of Primary Coolant Specific Activity Gentlemen: | ||
Gentlemen: | [ | ||
Seabrook Station Technical Specification 6.8.1.2.b requires an annual repon of primary coolant | Seabrook Station Technical Specification 6.8.1.2.b requires an annual repon of primary coolant | ||
[ | |||
specific activity analyses which are required to be conducted if the limits of Technical Specification 3.4.8, | specific activity analyses which are required to be conducted if the limits of Technical Specification 3.4.8, | ||
" Specific Activity" are exceeded. In accordance with this requirement, Nonh Atlantic Energy Service | |||
- i Corporation hereby reports that during 1993 primary coolant specific activity did not exceed the limits of Technical Specification 3.4.8. | |||
i Should you have any questions regarding this report, please contact Mr. James M. Peschel,- | i Should you have any questions regarding this report, please contact Mr. James M. Peschel,- | ||
Regulatory Compliance Manager, (603) 474-9521, extension 3772. | Regulatory Compliance Manager, (603) 474-9521, extension 3772. | ||
j i | |||
Very truly yours, l | Very truly yours, l | ||
/ | |||
TCF:Al 1/act | f Ted C. Feigenb, m TCF:Al 1/act i | ||
) | |||
cc: | cc: | ||
King of Prussia, PA 19406 Mr. Albert W. De Agazio Sr. Project Manager Project Directorate 1-4 Division of Reactor Projectr U.S. Nuclear Regulatory Commission Wasi.ington, DC 20555 1 | Mr. Thomas T. Manin Regional Administrator l | ||
I Mr. Antone C. Cerne | U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio Sr. Project Manager Project Directorate 1-4 Division of Reactor Projectr U.S. Nuclear Regulatory Commission Wasi.ington, DC 20555 1 | ||
I Mr. Antone C. Cerne | |||
' on7D n | |||
NRC Senior Resident inspector | |||
Seabrook, Nil 03874 | -ph P.O. Box i149 Seabrook, Nil 03874 | ||
} | |||
9402280206 940215 | 9402280206 940215 | ||
PDR- ADOCK 05000443 | [ | ||
b PDR-ADOCK 05000443 i | |||
L | |||
.P GE@ | |||
..}} | |||
Latest revision as of 21:41, 16 December 2024
| ML20063K097 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 02/15/1994 |
| From: | Feigenbaum T NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-94016, NUDOCS 9402280206 | |
| Download: ML20063K097 (1) | |
Text
_p a.
a na a a
...e.
+ -..'
~-
~n
+
=
x g-Y Seab NH 03874
~
Telephone (603)474-9521
=
hh Facsimile (603)474 2987
[
Energy Service Corporation Ted C. Feigenbaum Senior Vice President and NYN-94016 Chief NuclearOfficer February 15,1994 i
. United States Nuclear Regulatory Commission Washington, D.C. '0555 F
Attention:
Doctuent Control Desk
Reference:
Facility Operating License No. NPF-86. Docket No. 50-443
Subject:
Annual Repon of Primary Coolant Specific Activity Gentlemen:
[
Seabrook Station Technical Specification 6.8.1.2.b requires an annual repon of primary coolant
[
specific activity analyses which are required to be conducted if the limits of Technical Specification 3.4.8,
" Specific Activity" are exceeded. In accordance with this requirement, Nonh Atlantic Energy Service
- i Corporation hereby reports that during 1993 primary coolant specific activity did not exceed the limits of Technical Specification 3.4.8.
i Should you have any questions regarding this report, please contact Mr. James M. Peschel,-
Regulatory Compliance Manager, (603) 474-9521, extension 3772.
j i
Very truly yours, l
/
f Ted C. Feigenb, m TCF:Al 1/act i
)
cc:
Mr. Thomas T. Manin Regional Administrator l
U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio Sr. Project Manager Project Directorate 1-4 Division of Reactor Projectr U.S. Nuclear Regulatory Commission Wasi.ington, DC 20555 1
I Mr. Antone C. Cerne
' on7D n
NRC Senior Resident inspector
-ph P.O. Box i149 Seabrook, Nil 03874
}
9402280206 940215
[
b PDR-ADOCK 05000443 i
L
.P GE@
..