ML20064F811: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,
Consumers power Company General officos: 1945 West Pernall Road, Jackson, MI 49201 * (517) 788-0550 November 15, 1982                                                                                                         -
Consumers power Company General officos: 1945 West Pernall Road, Jackson, MI 49201 * (517) 788-0550 November 15, 1982 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen ELlyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - COMPLIANCE WITH ORDER MODIFYING LICENSING As required by NRC Order dated November 9, 1979, on inspection of valves and other controls for engineered safety systems was conducted in October 1982.
James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen ELlyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - COMPLIANCE WITH ORDER MODIFYING LICENSING As required by NRC Order dated November 9, 1979, on inspection of valves and other controls for engineered safety systems was conducted in October 1982.
This inspection verified compliance with LCO requirements of the Technical Specifications, p.O h bwd Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades 8301110178 821115 PDR ADOCK 05000255 G
This inspection verified compliance with LCO requirements of the Technical Specifications, p.O h                       bwd Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades 8301110178 821115 PDR G
PDR
ADOCK 05000255 PDR                                           , g '6S?.
, g '6S?.
OC1182-0011A-NLO2 M$}}
OC1182-0011A-NLO2 M$}}

Latest revision as of 20:49, 16 December 2024

Advises of Insp of ESF Valves & Other Controls in Oct 1982, Per NRC 791109 Order.Insp Verified Compliance W/Limiting Conditions of Operation Requirements of Tech Specs
ML20064F811
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/15/1982
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8301110178
Download: ML20064F811 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _,

Consumers power Company General officos: 1945 West Pernall Road, Jackson, MI 49201 * (517) 788-0550 November 15, 1982 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen ELlyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - COMPLIANCE WITH ORDER MODIFYING LICENSING As required by NRC Order dated November 9, 1979, on inspection of valves and other controls for engineered safety systems was conducted in October 1982.

This inspection verified compliance with LCO requirements of the Technical Specifications, p.O h bwd Brian D Johnson Staff Licensing Engineer CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades 8301110178 821115 PDR ADOCK 05000255 G

PDR

, g '6S?.

OC1182-0011A-NLO2 M$