{{#Wiki_filter:7         Hzrry Taubsr r Nr  ,d Conoucten Detroit Edison EE5==
{{#Wiki_filter:7 Hzrry Taubsr Nr r
,d Conoucten Detroit Edison EE5==
September 3, 1982 EF2 - 59,235 Mr. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555
September 3, 1982 EF2 - 59,235 Mr. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555


==Dear Mr. Kintner:==
==Dear Mr. Kintner:==
==References:==
==References:==
(1) Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 (2) Letter H. Tauber to L. L. Kintner, May 18, 1982, EF2 - 57,885
(1)
Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 (2)
Letter H. Tauber to L.
L. Kintner, May 18, 1982, EF2 - 57,885


==Subject:==
==Subject:==
Seismic Reevaluation of the NSSS Piping The Reference 2 letter submitted a summary of analyt-ical results for the seismic reassessment of the NSSS piping.         It was indicated in the letter that some snubbers were calculated to exceed their rated loads and three recirculation nozzles were calculated to exceed their allowable values. Hence, Detroit Edison has replaced the overloaded snubbers (15 Kip) with stiffer ones (55 Kip). The increased stiffness of the snubbers was verified by analysis to correct the problem.         In addition, the three recirculation nozzles and recirculation pump have been requalified by analy-sis for the new loadings. The results of these analy-ses are available for audit should you desire.
Seismic Reevaluation of the NSSS Piping The Reference 2 letter submitted a summary of analyt-ical results for the seismic reassessment of the NSSS piping.
It was indicated in the letter that some snubbers were calculated to exceed their rated loads and three recirculation nozzles were calculated to exceed their allowable values.
Hence, Detroit Edison has replaced the overloaded snubbers (15 Kip) with stiffer ones (55 Kip).
The increased stiffness of the snubbers was verified by analysis to correct the problem.
In addition, the three recirculation nozzles and recirculation pump have been requalified by analy-sis for the new loadings.
The results of these analy-ses are available for audit should you desire.
As a consequence, all piping stresses for the required NSSS piping are now within ASME Code allowables for the seismic reassessment without exception. In addition, all applicable pipe mounted equipment is within code allowables.
As a consequence, all piping stresses for the required NSSS piping are now within ASME Code allowables for the seismic reassessment without exception. In addition, all applicable pipe mounted equipment is within code allowables.
Should you have any additional questions, please con-tact Mr. L. E. Schuerman, (313) 649-7562.
Should you have any additional questions, please con-tact Mr. L.
Sincerely,                   gCl 8209140274 820903                             b,   -
E. Schuerman, (313) 649-7562.
A PDR ADOCK 05000341 A                   PDR                               H.'T W cc:     Mr. B. Little
Sincerely, gCl 8209140274 820903 b,
A PDR ADOCK 05000341 A
PDR H.'T W cc:
Mr. B. Little
___}}
___}}

Latest revision as of 20:05, 16 December 2024

Discusses Seismic re-evaluation of NSSS Piping.Proper Snubbers Installed.Three Recirculation Nozzles & Recirculation Pump Requalified by Analysis for New Loadings. All Piping Stresses Now within ASME Code
ML20065B163
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/03/1982
From: Tauber H
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
References
EF2---59-235, NUDOCS 8209140274
Download: ML20065B163 (1)


Text

7 Hzrry Taubsr Nr r

,d Conoucten Detroit Edison EE5==

September 3, 1982 EF2 - 59,235 Mr. L. L. Kintner U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555

Dear Mr. Kintner:

References:

(1)

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341 (2)

Letter H. Tauber to L.

L. Kintner, May 18, 1982, EF2 - 57,885

Subject:

Seismic Reevaluation of the NSSS Piping The Reference 2 letter submitted a summary of analyt-ical results for the seismic reassessment of the NSSS piping.

It was indicated in the letter that some snubbers were calculated to exceed their rated loads and three recirculation nozzles were calculated to exceed their allowable values.

Hence, Detroit Edison has replaced the overloaded snubbers (15 Kip) with stiffer ones (55 Kip).

The increased stiffness of the snubbers was verified by analysis to correct the problem.

In addition, the three recirculation nozzles and recirculation pump have been requalified by analy-sis for the new loadings.

The results of these analy-ses are available for audit should you desire.

As a consequence, all piping stresses for the required NSSS piping are now within ASME Code allowables for the seismic reassessment without exception. In addition, all applicable pipe mounted equipment is within code allowables.

Should you have any additional questions, please con-tact Mr. L.

E. Schuerman, (313) 649-7562.

Sincerely, gCl 8209140274 820903 b,

A PDR ADOCK 05000341 A

PDR H.'T W cc:

Mr. B. Little

___