ML20065M462: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:_,
{{#Wiki_filter:_,
g, MVERMONT YANKEE NUCLEAR POWER CORPORATION x       s Ferry Road, Brattleboro, VT 05301-7002
g, MVERMONT YANKEE NUCLEAR POWER CORPORATION x
_m
..(7b([f Ferry Road, Brattleboro, VT 05301-7002 s
    ..(7b([f N
_m i
i N-'     -
ENGINEERING OFFICE N
ENGINEERING OFFICE 580 MAIN STREET DOL TON. M A 01740 (506) 779-6711 April 22,1994 BVY 94 - 46 United States Nuclear Regulatory Commission ATIN: Document Contml Desk Washington, DC 20555
N-'
580 MAIN STREET DOL TON. M A 01740 (506) 779-6711 April 22,1994 BVY 94 - 46 United States Nuclear Regulatory Commission ATIN: Document Contml Desk Washington, DC 20555


==References:==
==References:==
: a. License No. DPR-28 (Docket No. 50-271)
a.
License No. DPR-28 (Docket No. 50-271)


==Subject:==
==Subject:==
Line 33: Line 35:
We trust this information is acceptable; howevee, should you have any questions, please contact this office.
We trust this information is acceptable; howevee, should you have any questions, please contact this office.
Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION
Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION
                                                              ' dPv6           .
' dPv6 A%
A%           ,1   ,
,1 Leonard A. Tremblay, Jr., P.E. \\j Senior Licensing Engineer cc:
Leonard A. Tremblay, Jr., P.E. \j Senior Licensing Engineer cc:     USNRC Region I Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager- VYNPS 2UOO_U 940426oo42 940422
USNRC Region I Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager-VYNPS 2UOO_U 940426oo42 940422
{DR ADOCK 05000271                                                                             -
{DR ADOCK 05000271
                                                                                                                        '\' I PDR
- '\\'
[                                                                                                                             J}}
I PDR
[
J}}

Latest revision as of 19:25, 16 December 2024

Forwards ...Cycle 16 Operating Rept, in Accordance W/ 10CFR50.59(b)(2) & 10CFR50.4.Rept Describes Facility Changes,Tests & Experiments,Including SE of Each,Conducted During Period 930101-1024 W/O Prior NRC Approval
ML20065M462
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/22/1994
From: Tremblay L
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065M463 List:
References
BVY-94-46, NUDOCS 9404260042
Download: ML20065M462 (1)


Text

_,

g, MVERMONT YANKEE NUCLEAR POWER CORPORATION x

..(7b([f Ferry Road, Brattleboro, VT 05301-7002 s

_m i

ENGINEERING OFFICE N

N-'

580 MAIN STREET DOL TON. M A 01740 (506) 779-6711 April 22,1994 BVY 94 - 46 United States Nuclear Regulatory Commission ATIN: Document Contml Desk Washington, DC 20555

References:

a.

License No. DPR-28 (Docket No. 50-271)

Subject:

Vemiont Yankee Cycle 16 Operating Report Enclosed please find one copy of the Vermont Yankee Operating Report for the portion of Cycle 16 which occurred in calender year 1993, submitted in accordance with 10CFR50.59(b)(2) and 10CFR50.4. This report describes the facility changes, tests, and experiments, including a summary of the safety evaluation of each, which were conducted during this time period without prior NRC approval and which constituted a change in the facility as described in the Final Safety Analysis Report (FSAR).

This report accommodates a regulatory-driven transition with regard to the submittal frequency for the Operating Report from annual to cyclic. As such, this report covers the period from January 1,1993 to the end of the 1993 refueling outage which occuned on October 24,1993.

(the end of Cycle 16). In accordance with 10CFR50.59(b)(2), this submittal is being made concurrent with a revision to the Final Safety Analysis Report (FSAR), being submitted under separate cover.

We trust this information is acceptable; howevee, should you have any questions, please contact this office.

Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION

' dPv6 A%

,1 Leonard A. Tremblay, Jr., P.E. \\j Senior Licensing Engineer cc:

USNRC Region I Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager-VYNPS 2UOO_U 940426oo42 940422

{DR ADOCK 05000271

- '\\'

I PDR

[

J