ML20065T663: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:.. _ - - _ | ||
.. ~,_ | |||
t I | |||
I VIROINIA ELecTalC AND Powna CoxPANY HicuxoNo, VrRGINIA 20261 R. H. Ls Amatino 1 | |||
vw r...is nr September 15, 1982 Nuctuan OramATION. | |||
Mr. N. M. Haller,' Director Serial No. 533 Office of Management and Program Analysis N0/GSS:acm U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D. C. 20555 50-281 License Nos. DPR-32 l | |||
DPR-37 | |||
==Dear Mr. Haller:== | |||
l Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of August, 1982. | |||
4 Very truly yours, m | |||
'.I | |||
/ | |||
Dk T R. H. Leasburg 3 | |||
9 1 | |||
Enclosure (3 copies) 4 1 | |||
l cc: | |||
Mr. R. C. DeYoung, Director (12 copies) | |||
Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy) | |||
Regional Administrator j | |||
Region II L. OY 8211020630 B20915 PDR ADOCK 05000280 R | |||
PDR r | |||
-. ~ -,., -,.. -... _ | |||
n.,. - | |||
- -, -.... -. -..,,,, _...,.., -.. -,. _}} | |||
Latest revision as of 18:51, 16 December 2024
| ML20065T663 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 09/15/1982 |
| From: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Haller N NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| Shared Package | |
| ML20065T664 | List: |
| References | |
| 533, NUDOCS 8211020630 | |
| Download: ML20065T663 (1) | |
Text
.. _ - - _
.. ~,_
t I
I VIROINIA ELecTalC AND Powna CoxPANY HicuxoNo, VrRGINIA 20261 R. H. Ls Amatino 1
vw r...is nr September 15, 1982 Nuctuan OramATION.
Mr. N. M. Haller,' Director Serial No. 533 Office of Management and Program Analysis N0/GSS:acm U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Washington, D. C. 20555 50-281 License Nos. DPR-32 l
Dear Mr. Haller:
l Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. I and 2 for the month of August, 1982.
4 Very truly yours, m
'.I
/
Dk T R. H. Leasburg 3
9 1
Enclosure (3 copies) 4 1
l cc:
Mr. R. C. DeYoung, Director (12 copies)
Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)
Regional Administrator j
Region II L. OY 8211020630 B20915 PDR ADOCK 05000280 R
PDR r
-. ~ -,., -,.. -... _
n.,. -
- -, -.... -. -..,,,, _...,.., -.. -,. _