ML20069D803: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS | | document type = OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING, TEXT-LICENSE APPLICATIONS & PERMITS | ||
| page count = 2 | | page count = 2 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:l | ||
,9 g | |||
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 400 Chestnut Street Tower II September 17, 1982 TVA-SQN-TS-36 i | |||
Mr. Harold R. Denton, Dhector Office of Nuclear 3eactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 | |||
==Dear Mr. Denton:== | |||
In the Matter of | |||
) | |||
Docket Nos. 50-327 Tennessee Valley Authority | |||
) | |||
50-328 In accordance with 10 CFR Part 50.59, we are enclosing 40 copies of a requested amendment to the operating licenses DPR-77 and DPR-79 for a change to the Sequoyah Nuclear Plant units 1 and 2 technical specifications. The proposed changes to the technical specifications and justifications for the changes are provided in the following enclosures. - Change No. 1 - Diesel Generator Battery Float Voltage | |||
, - Change No. 2 - Isolation Times for Containment Isolation Valves - Change No. 3 - Instrumentation Surveillance Requirement Test Frequency of Tables 4.3-1 and 4.3-2 - Change No. 4 - Changes to Reflect Installation of Permanent Hydrogen Mitigation System - Change No. 5 - Addition of Second Level of Undervoltage Protection NRC approval of the changes to the technical specifications, provided in Enclosures 4 and 5, is required for unit 1 of our Sequoyah Nuclear Plant before startup from the present refueling outage. | |||
s | |||
/@ | |||
PDR ADOCK820922O277 82f917 05000327 P | |||
PDR An Equal Opportunity Employer | |||
4- | |||
. Mr. Harold R. Denton, Director September 17, 1982 In accordance with the provisions of 10 CFR Part 170.22, we have determined the proposed amendment to be Class IV for unit 1 and Class I for unit 2. | |||
This classification is based on the fact that the amendment involves several changes of the Class III type incorporated into this amendment and involves a second essentially identical unit at the same site. The remittance of $12,700 is being wired to the Nuclear Regulatory Commission, Attention: Licensing Fee Management Branch. | |||
Very truly yours, TENNESSEE VALLEY AUTHORITY DS W D. S. Kammer Nuclear Engineer Sworn to d subscrib d be ore me this./7 day of,. | |||
1982 ftWJwk Notar[Public | |||
~ | |||
My 06mmission Expires 9,![ 6 M i | |||
Enclosures (40) cc: | |||
U.S. Nuclear Regulatory Commission Region II Attn: | |||
Mr. James P. O'Reilly, Regional Administrater 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303}} | |||
Latest revision as of 11:00, 16 December 2024
| ML20069D803 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 09/17/1982 |
| From: | Kammer D TENNESSEE VALLEY AUTHORITY |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20069D807 | List: |
| References | |
| TVA-SQN-TS-36, NUDOCS 8209220277 | |
| Download: ML20069D803 (2) | |
Text
l
,9 g
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 400 Chestnut Street Tower II September 17, 1982 TVA-SQN-TS-36 i
Mr. Harold R. Denton, Dhector Office of Nuclear 3eactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Denton:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 In accordance with 10 CFR Part 50.59, we are enclosing 40 copies of a requested amendment to the operating licenses DPR-77 and DPR-79 for a change to the Sequoyah Nuclear Plant units 1 and 2 technical specifications. The proposed changes to the technical specifications and justifications for the changes are provided in the following enclosures. - Change No. 1 - Diesel Generator Battery Float Voltage
, - Change No. 2 - Isolation Times for Containment Isolation Valves - Change No. 3 - Instrumentation Surveillance Requirement Test Frequency of Tables 4.3-1 and 4.3-2 - Change No. 4 - Changes to Reflect Installation of Permanent Hydrogen Mitigation System - Change No. 5 - Addition of Second Level of Undervoltage Protection NRC approval of the changes to the technical specifications, provided in Enclosures 4 and 5, is required for unit 1 of our Sequoyah Nuclear Plant before startup from the present refueling outage.
s
/@
PDR ADOCK820922O277 82f917 05000327 P
PDR An Equal Opportunity Employer
4-
. Mr. Harold R. Denton, Director September 17, 1982 In accordance with the provisions of 10 CFR Part 170.22, we have determined the proposed amendment to be Class IV for unit 1 and Class I for unit 2.
This classification is based on the fact that the amendment involves several changes of the Class III type incorporated into this amendment and involves a second essentially identical unit at the same site. The remittance of $12,700 is being wired to the Nuclear Regulatory Commission, Attention: Licensing Fee Management Branch.
Very truly yours, TENNESSEE VALLEY AUTHORITY DS W D. S. Kammer Nuclear Engineer Sworn to d subscrib d be ore me this./7 day of,.
1982 ftWJwk Notar[Public
~
My 06mmission Expires 9,![ 6 M i
Enclosures (40) cc:
U.S. Nuclear Regulatory Commission Region II Attn:
Mr. James P. O'Reilly, Regional Administrater 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303