GEORGIA POWER Comwwr                                             ,
GEORGIA POWER Comwwr
  'n]
'n]
L   ED 1 HATCH                       270 PEACHTREE STREET                     Po asas i ATIsANTA August 1, 1972 1
L ED 1 HATCH 270 PEACHTREE STREET Po asas i
Mr. L. Manning Muntzing Director of Regulation United States Atomic Energy Commission                               l 20545 Washington, D. C.
ATIsANTA August 1, 1972 1
Mr. L. Manning Muntzing Director of Regulation United States Atomic Energy Commission l
Washington, D. C.
20545


==Dear Mr. Muntzing:==
==Dear Mr. Muntzing:==
I Georgia Power Company hereby files an Application for a Construction Permit and Operating License for a nuclear             i power plant, designated as the Alvin W. Vogtle Nuclear Plant.
I Georgia Power Company hereby files an Application for a Construction Permit and Operating License for a nuclear i
Submitted herewith, in support of this application, are the           ,
power plant, designated as the Alvin W. Vogtle Nuclear Plant.
facility Preliminary Safety Analysis Report, Environmental           i
Submitted herewith, in support of this application, are the facility Preliminary Safety Analysis Report, Environmental i
      +
Report, and information requested by the Attorney General
Report, and information requested by the Attorney General for the Anti-Trust Review.
+
for the Anti-Trust Review.
In accordance with current requirements, we enclose three (3) signed copies and seven (7) conformed copies of this application, ten (10) copies of the documents submitted in support of this application (herein defined), and the ap-plication fee for a construction permit for a power reactor as required by 10CFR170.21.
In accordance with current requirements, we enclose three (3) signed copies and seven (7) conformed copies of this application, ten (10) copies of the documents submitted in support of this application (herein defined), and the ap-plication fee for a construction permit for a power reactor as required by 10CFR170.21.
Ver truly yours, Edwin I. Hatch l
Ver truly yours, Edwin I. Hatch i
i i
i
l
\\;
        \;
9406100069 730200 PDR ADOCK 05000424 g
9406100069 730200 PDR   ADOCK 05000424 g                 PDR l}}
PDR l
,}}

Latest revision as of 10:49, 16 December 2024

Informs That Georgia Power Co Filed Application for Construction Permit & Operating License for Plant.Listed Documents Supporting Application Encl
ML20069G548
Person / Time
Site: Vogtle 
Issue date: 08/01/1972
From: Hatch E
GEORGIA POWER CO.
To: Muntzing L
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20069G537 List:
References
NUDOCS 9406100069
Download: ML20069G548 (1)


Text

f f

GEORGIA POWER Comwwr

'n]

L ED 1 HATCH 270 PEACHTREE STREET Po asas i

ATIsANTA August 1, 1972 1

Mr. L. Manning Muntzing Director of Regulation United States Atomic Energy Commission l

Washington, D. C.

20545

Dear Mr. Muntzing:

I Georgia Power Company hereby files an Application for a Construction Permit and Operating License for a nuclear i

power plant, designated as the Alvin W. Vogtle Nuclear Plant.

Submitted herewith, in support of this application, are the facility Preliminary Safety Analysis Report, Environmental i

Report, and information requested by the Attorney General

+

for the Anti-Trust Review.

In accordance with current requirements, we enclose three (3) signed copies and seven (7) conformed copies of this application, ten (10) copies of the documents submitted in support of this application (herein defined), and the ap-plication fee for a construction permit for a power reactor as required by 10CFR170.21.

Ver truly yours, Edwin I. Hatch i

i

\\;

9406100069 730200 PDR ADOCK 05000424 g

PDR l

,