ML20070K384: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:H Nebraska Public Power District Always there when you need us NLS2020014                                                                           50.54(q)
{{#Wiki_filter:H Nebraska Public Power District NLS2020014 March 03, 2020 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Always there when you need us
March 03, 2020                                                                       72.44(f)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001


==Subject:==
==Subject:==
Report of Changes to Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46
Report of Changes to Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
 
50.54(q) 72.44(f)
During a site assessment in December 2019, it was identified that a change to Cooper Nuclear Station's (CNS) emergency plan implementing procedure (EPIP) 5.7.1, Emergency Classification, was not reported to the Nuclear Regulatory Commission (NRC) within 30 days of the change as required by 10 CFR 50.54(q)(5). This issue was documented in CNS' Corrective Action Program.
During a site assessment in December 2019, it was identified that a change to Cooper Nuclear Station's (CNS) emergency plan implementing procedure (EPIP) 5.7.1, Emergency Classification, was not reported to the Nuclear Regulatory Commission (NRC) within 30 days of the change as required by 10 CFR 50.54(q)(5). This issue was documented in CNS' Corrective Action Program.
After further review, it was identified that three additional revisions to this EPIP were also not reported as required.
After further review, it was identified that three additional revisions to this EPIP were also not reported as required.
The purpose of this letter is to report a description of the changes and summary of analyses made to EPIP 5. 7 .1 that were not previously reported in the last three years. The most current revision of EPIP 5.7.1 is also enclosed.
The purpose of this letter is to report a description of the changes and summary of analyses made to EPIP 5. 7.1 that were not previously reported in the last three years. The most current revision of EPIP 5.7.1 is also enclosed.
This letter contains no regulatory commitments.
This letter contains no regulatory commitments.
If you have any questions regarding this submittal, please contact me at (402) 825-5416.
If you have any questions regarding this submittal, please contact me at ( 402) 825-5416.
Sincerely,
Sincerely,  
~Jm Linda Dewhirst
~Jm -f!x, t. bewh,;-ir Linda Dewhirst Regulatory Affairs and Compliance Manager  
                            -f!x, t. bewh,;-ir Regulatory Affairs and Compliance Manager
/bk  
/bk


==Attachment:==
==Attachment:==
Report of Changes and Summary of 50.54(q) Analyses Emergency Plan Implementing Procedure 5. 7.1, Emergency Classification
Report of Changes and Summary of 50.54( q) Analyses Emergency Plan Implementing Procedure 5. 7.1, Emergency Classification  


==Enclosure:==
==Enclosure:==
Emergency Plan Implementing Procedure 5.7.1, Emergen~y Classification, Revision 64 (Current Revision)
Emergency Plan Implementing Procedure 5.7.1, Emergen~y Classification, Revision 64 (Current Revision)
COOPER NUCLEAR STATION P.O. Box 98/ Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com
COOPER NUCLEAR STATION P.O. Box 98/ Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com  


NLS2020014 Page 2 of2 cc:   Regional Administrator, w/ attachment and enclosure (2)
NLS2020014 Page 2 of2 cc:
USNRC - Region IV Director, Division of Fuel Management, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment (enclosure per controlled document distribution)
Regional Administrator, w/ attachment and enclosure (2)
USNRC - Region IV Director, Division of Fuel Management, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment ( enclosure per controlled document distribution)
USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure}}
USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure}}

Latest revision as of 09:31, 16 December 2024

Transmittal of Report of Changes to Emergency Plan Implementing Procedure 5.7.1
ML20070K384
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/03/2020
From: Dewhirst L
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NLS2020014
Download: ML20070K384 (2)


Text

H Nebraska Public Power District NLS2020014 March 03, 2020 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Always there when you need us

Subject:

Report of Changes to Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46

Dear Sir or Madam:

50.54(q) 72.44(f)

During a site assessment in December 2019, it was identified that a change to Cooper Nuclear Station's (CNS) emergency plan implementing procedure (EPIP) 5.7.1, Emergency Classification, was not reported to the Nuclear Regulatory Commission (NRC) within 30 days of the change as required by 10 CFR 50.54(q)(5). This issue was documented in CNS' Corrective Action Program.

After further review, it was identified that three additional revisions to this EPIP were also not reported as required.

The purpose of this letter is to report a description of the changes and summary of analyses made to EPIP 5. 7.1 that were not previously reported in the last three years. The most current revision of EPIP 5.7.1 is also enclosed.

This letter contains no regulatory commitments.

If you have any questions regarding this submittal, please contact me at ( 402) 825-5416.

Sincerely,

~Jm -f!x, t. bewh,;-ir Linda Dewhirst Regulatory Affairs and Compliance Manager

/bk

Attachment:

Report of Changes and Summary of 50.54( q) Analyses Emergency Plan Implementing Procedure 5. 7.1, Emergency Classification

Enclosure:

Emergency Plan Implementing Procedure 5.7.1, Emergen~y Classification, Revision 64 (Current Revision)

COOPER NUCLEAR STATION P.O. Box 98/ Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com

NLS2020014 Page 2 of2 cc:

Regional Administrator, w/ attachment and enclosure (2)

USNRC - Region IV Director, Division of Fuel Management, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment ( enclosure per controlled document distribution)

USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure