OPER ATING DA) s REPORT | OPER ATING DA) s REPORT 50-317 | ||
- DOCKET NO. - | |||
: 1. Uni: Name: | DATE 1/14/83 COMPLETED BY Elaine 1.otito TELEPilONE __ (301) 78Z.-5363 OP1 RATING STA T US | ||
: 2. Reporting Period: - | : 1. Uni: Name: | ||
: 3. Li:enwd Thermal Power (MW ): 2.700 | Calsert Cliffs #1 Not*5 December 1982 | ||
: 4. Nameplate Rating (Gross MWe): | : 2. Reporting Period: - | ||
: 3. Li:enwd Thermal Power (MW ): 2.700 918 | |||
: 4. Nameplate Rating (Gross MWe): | |||
~ | |||
0" | |||
: 5. Desi;;n Elutrical Raimg(Net MWe): | : 5. Desi;;n Elutrical Raimg(Net MWe): | ||
860 | 860 | ||
: 6. Masimum Dependable Capacity (Gross MWe): | : 6. Masimum Dependable Capacity (Gross MWe): | ||
: 7. Mssimum Dependable Capacity (Net MWe): | : 7. Mssimum Dependable Capacity (Net MWe): | ||
825 | |||
: 8. If Charges Oecur in Capaity RatinFs (1 cms Nunter 3 Through 7) Since Last Report.Gise Reascas: | : 8. If Charges Oecur in Capaity RatinFs (1 cms Nunter 3 Through 7) Since Last Report.Gise Reascas: | ||
: 9. Power Lesello hhich Restricted. lf Any (Net LIWe): | : 9. Power Lesello hhich Restricted. lf Any (Net LIWe): | ||
: 10. Reasons For Restruticru. If Any: | : 10. Reasons For Restruticru. If Any: | ||
This Month | This Month Yr..to-Date Ct. nubtive II. Ilours in Reporting Pesiod 744.0 8,760.0 67,069.0 | ||
: 12. Number Oi tfours Reactor Was Critical | : 12. Number Oi tfours Reactor Was Critical 733.9 b,496.2 53,095.9 | ||
: 13. Reactor Resene Shutdown Hours | : 13. Reactor Resene Shutdown Hours 0.0 16.1 | ||
: 14. Ilours Generatae On-line | _1,808.5 | ||
: 15. Urdt Reune Sheldown Hours | : 14. Ilours Generatae On-line 720.2 _ | ||
: 16. Cross Thermal Energy Gererated (MWiin | 6,422.2 | ||
: 17. Gross Electrical Encray Generated IMWill | : 15. Urdt Reune Sheldown Hours 0.0 O.0 _ | ||
6,006,946 | 52,023.9, 0.0 | ||
: 18. Net Electrical Energy Generated (MWH) | : 16. Cross Thermal Energy Gererated (MWiin 1,887,348 16,750,568 126,670,046 | ||
: 19. Unit Smice Factor | : 17. Gross Electrical Encray Generated IMWill 644,020 6,006,946 | ||
: 20. Unit Assitatility Factcr | _4_2,000,943 | ||
: 21. Unit Capacity Factos (Using MDC Net, | : 18. Net Electrical Energy Generated (MWH) 617,437 5,362,175 39,664,208 | ||
: 22. Unit Capacity l' actor (Usmg DER Net) | : 19. Unit Smice Factor 96.8 73.3 77.6 | ||
: 23. Unit Forced Outage Rate | : 20. Unit Assitatility Factcr 96.8 73.3 77.6 | ||
: 24. Shutdowns SchedulcJ 0.cr . Nest 6 Months (Type. Date. nd Duration of Eacht: | : 21. Unit Capacity Factos (Using MDC Net, 100.6 74.2 72.9 | ||
: 22. Unit Capacity l' actor (Usmg DER Net) 8. | |||
72.4 70.0 a | |||
.2 u | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns SchedulcJ 0.cr. Nest 6 Months (Type. Date. nd Duration of Eacht: | |||
: 25. t(Shut Down At End of Report Period. Estimated Date of Startup: | : 25. t(Shut Down At End of Report Period. Estimated Date of Startup: | ||
: 26. Units In Test Status (Prior to Commercial 0per.*sion). | : 26. Units In Test Status (Prior to Commercial 0per.*sion). | ||
INITI L L ELECTRICITY COMs!ERCI AL OPER ATION 8301260148 820114 PDR ADOCK 05000317 | Forecast Achiesed INITIA L CRITICALITY. | ||
R | INITI L L ELECTRICITY COMs!ERCI AL OPER ATION 8301260148 820114 PDR ADOCK 05000317 M 7) | ||
R PDR | |||
^ | |||
OPER ATING DAT 4 REPORT DOCKET NO. 50-318 DATE 1/16/83 COMPLETED BY Elaine Lotito TELEPHONE 730T) 7874363 OPE RATING STAT US j | |||
i | |||
: 1. Urdt Name: | |||
: 1. Urdt Name: | Calvert Cliffs #2 Notes December 1982 | ||
: 2. Reporting Period. | : 2. Reporting Period. | ||
: 3. Li:ensed Thermal Power DlW ); 2,700 911 | : 3. Li:ensed Thermal Power DlW ); 2,700 911 | ||
: 4. Narneplate Rating (Gross MWel: | : 4. Narneplate Rating (Gross MWel: | ||
: 5. Desiga Elutrical RetingINet MWe): | 8'' | ||
: 6. Maximum Dependable Capacity IGross MWep: | : 5. Desiga Elutrical RetingINet MWe): | ||
: 7. Masimum Dependable Capacity (Net MWe): | : 6. Maximum Dependable Capacity IGross MWep: | ||
860 825 | |||
: 7. Masimum Dependable Capacity (Net MWe): | |||
: 8. If Charges Oect.r in Cap.aity Ratinp (!tems Nunter 3 Through 7) Since Last Report.Gi e Reasons. | : 8. If Charges Oect.r in Cap.aity Ratinp (!tems Nunter 3 Through 7) Since Last Report.Gi e Reasons. | ||
: 9. Power Lesel To hhich Hestricted. lf Any (Net Mhen: | : 9. Power Lesel To hhich Hestricted. lf Any (Net Mhen: | ||
: 10. Reasons For Restrutiens. If Any: | : 10. Reasons For Restrutiens. If Any: | ||
This Month | This Month Ys. to Date Cs.mulative | ||
: 11. llours In Reporting Period | : 11. llours In Reporting Period 744.0 8,760.0 50,424.0 | ||
50,424.0 | : 12. Number Of flours Reactor Was Critical 0.0 6,532.9 42,100.9 | ||
: 12. Number Of flours Reactor Was Critical | !3. Reactor Resene Shutdown Hours 0.0 81.0 795.2 | ||
: 14. Houn Generator On Line 0.0 6,498.5 41,542.9 | |||
795.2 | : 15. Unit Resene Shutdown flours 0.0 0.0 0.0 0 | ||
: 14. Houn Generator On Line | 16,1/6,201 102,220,/d/ | ||
: 15. Unit Resene Shutdown flours | : 16. Gross Thermal Energy Generated IMWH) | ||
: 17. Gross Electrical Energy Generated IMWill | : 17. Gross Electrical Energy Generated IMWill | ||
__f#'"'" | |||
: 18. Net Electrical Energy Generated (MWH, | ~ | ||
: 19. Unit Senice Factor | : 18. Net Electrical Energy Generated (MWH, 0 | ||
: 20. Unit Assalability Factcr | 5,004,951 | ||
: 21. Unit Capacity Factor IUsing MDC Neti | _32,090,762 | ||
: 22. Unit C:pacity Factor (L' sing DER 'ier) | : 19. Unit Senice Factor 0.0 74.2 82.4 | ||
: 23. Unit i orced Outage Rate | : 20. Unit Assalability Factcr 0.0 74.2 82.4 | ||
: 21. Unit Capacity Factor IUsing MDC Neti 0.0 69.3 77.8 | |||
: 22. Unit C:pacity Factor (L' sing DER 'ier) 0.0 67.6 75.3 | |||
: 23. Unit i orced Outage Rate 0.0 6.0 5.5 | |||
: 24. Shutdowns Scheduled O,er Nest 6 Moriths 11ype. flate,and Duration of Eacht: | : 24. Shutdowns Scheduled O,er Nest 6 Moriths 11ype. flate,and Duration of Eacht: | ||
'Jo. 2 Plant will be on a planned outage from 10/17/82 until 2/14/83 for refueling, unit general inspection and retube the condenser. | |||
: 25. Il Shut Down At End Of Report Feriod Estimated Date of Startup: 2/14/83 lo. Unitiin Test Status (Prior to Commercial operation). | : 25. Il Shut Down At End Of Report Feriod Estimated Date of Startup: 2/14/83 lo. Unitiin Test Status (Prior to Commercial operation). | ||
INiil4L EL ECTRICITY COM\f ERCI AL OPE R ATION (4/77) | Forecess Achiesed INITI A L CRITICA LITY. | ||
INiil4L EL ECTRICITY COM\\f ERCI AL OPE R ATION (4/77) | |||
s | s o. | ||
AVERAGE DAILY UNIT POWER LEVEL i | AVERAGE DAILY UNIT POWER LEVEL i | ||
DOCKET NO. 50-317 Calvert Cliffs #1 l | DOCKET NO. 50-317 Calvert Cliffs #1 l | ||
WIT | WIT 1/14/83 DATE Maine. tito COMPLETED BY TELEPff0NE December 1982 MONTil | ||
) | |||
DAY | DAY AVERAGE D.4ILY P | ||
'ER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) 840 876 1 | |||
875 | 7 2 | ||
l | 871 is 877 3 | ||
863 39 873 4 | |||
838 20 876 5 | |||
875 21 876 869 876 6 | |||
22 875 7 | |||
23 876 8 | |||
y 86f 9 | |||
25 858 10 26 854 ll 872 27 860 12 875 23 861 l | |||
875 l | |||
13 29 258 14 876 30 874 876 877 15 3 | |||
16 877 l | |||
l INSTRUCTIONS On this format. list the userage dady unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt. | |||
l (9/77) l I | l (9/77) l I | ||
l l | l l | ||
AVERAGE D AILY UNIT POWER LEVEL 50-318 DOCKET NO. | AVERAGE D AILY UNIT POWER LEVEL 50-318 DOCKET NO. | ||
Calvert Cliffs #2 UNIT DATE 1/14/83 COMPLETED BY Elaine Lotito TELEPHONE (301) 787-5363 December 1982 MONTil DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) | |||
17 2 | (MWe Net) 1 17 2 | ||
18 3 | |||
19 4 | |||
27 12 | 20 5 | ||
21 6 | |||
~ | |||
16 INSTRUCTIONS l | 22 | ||
~ | |||
7 23 8 | |||
24 9 | |||
25 10 26 II 27 12 28 13 29 14 30 15 | |||
~ | |||
~ | |||
31 16 INSTRUCTIONS l | |||
On this format,hst the aserage daily urit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt. | On this format,hst the aserage daily urit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt. | ||
(9/77) a | (9/77) a | ||
DOCKETNO. 50-317 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME calve-t cliffs si | DOCKETNO. 50-317 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME calve-t cliffs si DATE 1/14/93 December' 1982 COMPLETED RY ri st-, e o t +- | ||
DATE 1/14/93 COMPLETED RY ri st-, e o t +- | REPORT MONTH 17.LEPHONE E01) 187-5303 n. | ||
E E | |||
E | 3g j :E3 bcunsee | ||
,E,g jg Cause & Corrective W-Date h | |||
W- | 5g 4 | ||
3 Action so 2., E Event gy gV Prevent Recurrence f I, 5 | |||
82-09 | jgg Report a mV g | ||
82-10 | 6 82-09 821208 F | ||
I | 12.8 A | ||
B-Maintenance of Test | 3 R8 CONROD Low voltage to control rods. | ||
E-Operator Training & Ucense Exansnation | 82-10 821229 F | ||
(9/77) | 11.0 A | ||
1 XX MOTORX Low oil level on No. 128 Reactor coolant pump motor. | |||
I 2 | |||
3 4 | |||
F: Forced Reason: | |||
Method: | |||
Exlubit G. instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Prepasation of Data B-Maintenance of Test 2-Manual Scram. | |||
Entry Sheets for Licensee C-Refueling 3-Automatic Scram. | |||
. Event Report (LER) File (NUREG-D-Regulatory Restriction 42 Continuation 0161) | |||
E-Operator Training & Ucense Exansnation 5-Load Reduction F-Administrative 5 | |||
9-Other G-Operational Earor (Explain) | |||
Exhibit I - Same Source (9/77) | |||
Il4)ther (Explain) | |||
DOCKETNO. g0-31a UNIT SHUTDOWNS AND POWER REDUCT10NS | DOCKETNO. g0-31a UNIT SHUTDOWNS AND POWER REDUCT10NS UNIT N AME | ||
gryg 1/14/83 COMPLETED RY | '*l''rt Clif f 5 #2 gryg 1/14/83 Elaine Lotito COMPLETED RY REPORT MONTH December. 1982 TELEPHONE !301) 767-5363 "5 | ||
c _. ce | E c _. | ||
ce 3 ses c | |||
No. | Cause & Corrective | ||
.2 e s | |||
,s4 Licensee c* | |||
Report = | E.% | ||
I | ? | ||
B-Maintenance of Test | Action to No. | ||
Date g | |||
3g y | |||
,g g y Esent aT E | |||
jgg Report = | |||
'N 0 f4 Prevent Recurrence d | |||
82-09 821016 S | |||
744.0 C | |||
4 XX FUEL XX Refueling, unit general inspection and retube condenser. | |||
I 2 | |||
3 4 | |||
F: Forced Reason: | |||
Method: | |||
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) | |||
I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. | |||
Entry Sheets for Licensee C-Refueling 3-Automatic Scram. | |||
Event Repor (LER) File (NUREG-D Regulator) Restriction 4:-Continuation 016I) i E Operator Training & Ucense Exainination 5-Load Reduction 1 | |||
F Adnunistrative 5 | |||
9-Other l | |||
G-Operational Errus (Explam) | G-Operational Errus (Explam) | ||
I | Exhibit I - Sane Source I | ||
(9/77) | |||
ItOther (Explain) l t | |||
January 10,1983 REFUELING INFORMATION REQUEST | January 10,1983 REFUELING INFORMATION REQUEST 1. | ||
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2. | |||
Scheduled date for next Refueling Shutdown: October 1,1983 3. | |||
Scheduled date for restart following refueling: December 11,1983 4. | |||
Will refueling or resumption of operation thereafter require a technical specification change or other lleense amendment? | |||
I Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core. | I Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core. | ||
5. | |||
June 29,1983 | Scheduled date(s) for submitting proposed licensing action and supporting information. | ||
Reload fuel will be similar to that reload fuel inserted into the previous cycle. | June 29,1983 6. | ||
Important licensing considerations associated with the refueling. | |||
(a) 217 | 1 Reload fuel will be similar to that reload fuel inserted into the previous cycle. | ||
7. | |||
1830 Licensed 1358 Currently Installed 9, | The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool. | ||
(a) 217 (b) 732 Spent Fuel Pools are common to Units 1 and 2 8. | |||
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies. | |||
1830 Licensed 1358 Currently Installed 9, | |||
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load. | |||
April,1991 i | April,1991 i | ||
l L | l L | ||
January 10,1983 REFUELING INFORMATION REQUEST 1. | |||
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2. | |||
2. | |||
Scheduled date for next refueling shutdown: October 15,1982. | |||
3. | |||
Scheduled date for restart following refueling: January 12,1983. | |||
4. | |||
Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment? | |||
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core. | Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core. | ||
5. | |||
October 11,1982 | Scheduled date(s) for submitting proposed licensing action and supporting information. | ||
October 11,1982 6. | |||
Important licensing considerations associated with refueling. | |||
Reload fuel will be similar to that reload fuel inserted in the previous cycle. | Reload fuel will be similar to that reload fuel inserted in the previous cycle. | ||
7. | |||
(a) 217 | The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool. | ||
(a) 217 (b) 732* | |||
Spent Fuel Poolis common to Units 1 and 2. | Spent Fuel Poolis common to Units 1 and 2. | ||
8. | |||
1830 Licensed 1358 Currently Installed | The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies. | ||
1830 Licensed 1358 Currently Installed 9. | |||
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load. | |||
April,1991 | April,1991 | ||
==SUMMARY== | ==SUMMARY== | ||
OF UNIT 1 OFERATING EXPERIENCE DECEMBER 1982 12/1 | OF UNIT 1 OFERATING EXPERIENCE DECEMBER 1982 12/1 At the beginning of this reporting period Unit I was operating at 850 MWe with the reactor at 91.5% power while investigating saltwater leakage into the main condenser. Load was increased to 910 MWe at 0215 when Indications of saltwater leakage disappeared. At 0830 load was reduced to 810 MWe to investigate saltwater leakage into the main condenser. Load was increased to 910 MWe at 1345 when indications of saltwater leakage disappeared. At 1900 load was reduced to 835 MWe to investigate saltwater leakage into the main condenser. Load was increased to 910 MWe at 2300 when indications of saltwater leakage disappeared. | ||
12/2 | 12/2 At 2045 load was reduced to 870 MWe to investigate saltwater leakage into the main condenser. | ||
12/3 | 12/3 Load was reduced to 840 MWe at 0240 for further investigation of saltwater leakage into the main condenser. Load was increased to 910 MWe at 0615 when indications of saltwater leakage disappeared. | ||
12/4 | 12/4 At 0640 load was reduced to 840 MWe to investigate saltwater leakage into the main condenser. Load was increased to 905 MWe at 1915 when indications of saltwater leakage disappeared. | ||
12/6 | 12/6 At 0015 load was reduced to 835 MWe to investigate saltwater leakage into the main condenser. Load was increased to 905 MWe at 0330 when indications of saltwater leakage disappeared. | ||
12/8 | 12/8 The turbine tripped at 1436 when an mdervoltage condition occurred on the reactor trip bus. | ||
12/9 | 12/9 The reactor was brought critical at 0045 and the unit paralleled at 0323. | ||
Resumed f ull load operation (900 MWe) at 1900. | Resumed f ull load operation (900 MWe) at 1900. | ||
12/10 | 12/10 At 0100 load was reduced to 805 MWe to investigate saltwater leakage into the main condenser. Load was increased to 905 MWe at 0400 when indications of saltwater leakage disappeared. | ||
12/23 At 2130, load was reduced to 860 MWe in preparation for shutting down the unit due to lack of back up power to #11 Control Room A/C Unit. Load was increased to capacity (905 MWe) at 2200. | 12/23 At 2130, load was reduced to 860 MWe in preparation for shutting down the unit due to lack of back up power to #11 Control Room A/C Unit. Load was increased to capacity (905 MWe) at 2200. | ||
12/24 L'oad was reduced to 898 MWe at 2230 due to loss of the plant computer. | 12/24 L'oad was reduced to 898 MWe at 2230 due to loss of the plant computer. | ||
| Line 192: | Line 266: | ||
12/21 At the end of this reporting period Unit I was operating at 890 MWe with the reactor at 100% power. | 12/21 At the end of this reporting period Unit I was operating at 890 MWe with the reactor at 100% power. | ||
1 l | 1 l | ||
i | |||
1 | 1 | ||
==SUMMARY== | ==SUMMARY== | ||
OF UNIT 2 OPERATING EXPERIENCE DECEMBER 1982 12/1 | OF UNIT 2 OPERATING EXPERIENCE DECEMBER 1982 12/1 At the beginning of this reporting period, Unit 2 was shutdown for its 4th scheduled refueling outage. | ||
12/31 At the end of this reporting period, Unit 2 remained shutdown for its 4th scheduled refueling cutage. | 12/31 At the end of this reporting period, Unit 2 remained shutdown for its 4th scheduled refueling cutage. | ||
_j}} | _j}} | ||
Latest revision as of 09:19, 16 December 2024
| ML20070P114 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 01/14/1983 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20070P113 | List: |
| References | |
| NUDOCS 8301260148 | |
| Download: ML20070P114 (11) | |
Text
-
OPER ATING DA) s REPORT 50-317
- DOCKET NO. -
DATE 1/14/83 COMPLETED BY Elaine 1.otito TELEPilONE __ (301) 78Z.-5363 OP1 RATING STA T US
- 1. Uni: Name:
Calsert Cliffs #1 Not*5 December 1982
- 2. Reporting Period: -
- 3. Li:enwd Thermal Power (MW ): 2.700 918
- 4. Nameplate Rating (Gross MWe):
~
0"
- 5. Desi;;n Elutrical Raimg(Net MWe):
860
- 6. Masimum Dependable Capacity (Gross MWe):
- 7. Mssimum Dependable Capacity (Net MWe):
825
- 8. If Charges Oecur in Capaity RatinFs (1 cms Nunter 3 Through 7) Since Last Report.Gise Reascas:
- 9. Power Lesello hhich Restricted. lf Any (Net LIWe):
- 10. Reasons For Restruticru. If Any:
This Month Yr..to-Date Ct. nubtive II. Ilours in Reporting Pesiod 744.0 8,760.0 67,069.0
- 12. Number Oi tfours Reactor Was Critical 733.9 b,496.2 53,095.9
- 13. Reactor Resene Shutdown Hours 0.0 16.1
_1,808.5
- 14. Ilours Generatae On-line 720.2 _
6,422.2
- 15. Urdt Reune Sheldown Hours 0.0 O.0 _
52,023.9, 0.0
- 16. Cross Thermal Energy Gererated (MWiin 1,887,348 16,750,568 126,670,046
- 17. Gross Electrical Encray Generated IMWill 644,020 6,006,946
_4_2,000,943
- 18. Net Electrical Energy Generated (MWH) 617,437 5,362,175 39,664,208
- 19. Unit Smice Factor 96.8 73.3 77.6
- 20. Unit Assitatility Factcr 96.8 73.3 77.6
- 21. Unit Capacity Factos (Using MDC Net, 100.6 74.2 72.9
- 22. Unit Capacity l' actor (Usmg DER Net) 8.
72.4 70.0 a
.2 u
- 23. Unit Forced Outage Rate
- 24. Shutdowns SchedulcJ 0.cr. Nest 6 Months (Type. Date. nd Duration of Eacht:
- 25. t(Shut Down At End of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial 0per.*sion).
Forecast Achiesed INITIA L CRITICALITY.
INITI L L ELECTRICITY COMs!ERCI AL OPER ATION 8301260148 820114 PDR ADOCK 05000317 M 7)
R PDR
^
OPER ATING DAT 4 REPORT DOCKET NO. 50-318 DATE 1/16/83 COMPLETED BY Elaine Lotito TELEPHONE 730T) 7874363 OPE RATING STAT US j
i
- 1. Urdt Name:
Calvert Cliffs #2 Notes December 1982
- 2. Reporting Period.
- 3. Li:ensed Thermal Power DlW ); 2,700 911
- 4. Narneplate Rating (Gross MWel:
8
- 5. Desiga Elutrical RetingINet MWe):
- 6. Maximum Dependable Capacity IGross MWep:
860 825
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Charges Oect.r in Cap.aity Ratinp (!tems Nunter 3 Through 7) Since Last Report.Gi e Reasons.
- 9. Power Lesel To hhich Hestricted. lf Any (Net Mhen:
- 10. Reasons For Restrutiens. If Any:
This Month Ys. to Date Cs.mulative
- 11. llours In Reporting Period 744.0 8,760.0 50,424.0
- 12. Number Of flours Reactor Was Critical 0.0 6,532.9 42,100.9
!3. Reactor Resene Shutdown Hours 0.0 81.0 795.2
- 14. Houn Generator On Line 0.0 6,498.5 41,542.9
- 15. Unit Resene Shutdown flours 0.0 0.0 0.0 0
16,1/6,201 102,220,/d/
- 16. Gross Thermal Energy Generated IMWH)
- 17. Gross Electrical Energy Generated IMWill
__f#'"'"
~
- 18. Net Electrical Energy Generated (MWH, 0
5,004,951
_32,090,762
- 19. Unit Senice Factor 0.0 74.2 82.4
- 20. Unit Assalability Factcr 0.0 74.2 82.4
- 21. Unit Capacity Factor IUsing MDC Neti 0.0 69.3 77.8
- 22. Unit C:pacity Factor (L' sing DER 'ier) 0.0 67.6 75.3
- 23. Unit i orced Outage Rate 0.0 6.0 5.5
- 24. Shutdowns Scheduled O,er Nest 6 Moriths 11ype. flate,and Duration of Eacht:
'Jo. 2 Plant will be on a planned outage from 10/17/82 until 2/14/83 for refueling, unit general inspection and retube the condenser.
- 25. Il Shut Down At End Of Report Feriod Estimated Date of Startup: 2/14/83 lo. Unitiin Test Status (Prior to Commercial operation).
Forecess Achiesed INITI A L CRITICA LITY.
INiil4L EL ECTRICITY COM\\f ERCI AL OPE R ATION (4/77)
s o.
AVERAGE DAILY UNIT POWER LEVEL i
DOCKET NO. 50-317 Calvert Cliffs #1 l
WIT 1/14/83 DATE Maine. tito COMPLETED BY TELEPff0NE December 1982 MONTil
)
DAY AVERAGE D.4ILY P
'ER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) 840 876 1
7 2
871 is 877 3
863 39 873 4
838 20 876 5
875 21 876 869 876 6
22 875 7
23 876 8
y 86f 9
25 858 10 26 854 ll 872 27 860 12 875 23 861 l
875 l
13 29 258 14 876 30 874 876 877 15 3
16 877 l
l INSTRUCTIONS On this format. list the userage dady unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
l (9/77) l I
l l
AVERAGE D AILY UNIT POWER LEVEL 50-318 DOCKET NO.
Calvert Cliffs #2 UNIT DATE 1/14/83 COMPLETED BY Elaine Lotito TELEPHONE (301) 787-5363 December 1982 MONTil DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 1 17 2
18 3
19 4
20 5
21 6
~
22
~
7 23 8
24 9
25 10 26 II 27 12 28 13 29 14 30 15
~
~
31 16 INSTRUCTIONS l
On this format,hst the aserage daily urit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) a
DOCKETNO. 50-317 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME calve-t cliffs si DATE 1/14/93 December' 1982 COMPLETED RY ri st-, e o t +-
REPORT MONTH 17.LEPHONE E01) 187-5303 n.
E E
3g j :E3 bcunsee
,E,g jg Cause & Corrective W-Date h
5g 4
3 Action so 2., E Event gy gV Prevent Recurrence f I, 5
jgg Report a mV g
6 82-09 821208 F
12.8 A
3 R8 CONROD Low voltage to control rods.
82-10 821229 F
11.0 A
1 XX MOTORX Low oil level on No. 128 Reactor coolant pump motor.
I 2
3 4
F: Forced Reason:
Method:
Exlubit G. instructions S: Scheduled A Equipment Failure (Explain) 1 -Manual for Prepasation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
. Event Report (LER) File (NUREG-D-Regulatory Restriction 42 Continuation 0161)
E-Operator Training & Ucense Exansnation 5-Load Reduction F-Administrative 5
9-Other G-Operational Earor (Explain)
Exhibit I - Same Source (9/77)
Il4)ther (Explain)
DOCKETNO. g0-31a UNIT SHUTDOWNS AND POWER REDUCT10NS UNIT N AME
'*lrt Clif f 5 #2 gryg 1/14/83 Elaine Lotito COMPLETED RY REPORT MONTH December. 1982 TELEPHONE !301) 767-5363 "5
E c _.
ce 3 ses c
Cause & Corrective
.2 e s
,s4 Licensee c*
E.%
?
Action to No.
Date g
3g y
,g g y Esent aT E
jgg Report =
'N 0 f4 Prevent Recurrence d
82-09 821016 S
744.0 C
4 XX FUEL XX Refueling, unit general inspection and retube condenser.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain)
I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Repor (LER) File (NUREG-D Regulator) Restriction 4:-Continuation 016I) i E Operator Training & Ucense Exainination 5-Load Reduction 1
F Adnunistrative 5
9-Other l
G-Operational Errus (Explam)
Exhibit I - Sane Source I
(9/77)
ItOther (Explain) l t
January 10,1983 REFUELING INFORMATION REQUEST 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1 2.
Scheduled date for next Refueling Shutdown: October 1,1983 3.
Scheduled date for restart following refueling: December 11,1983 4.
Will refueling or resumption of operation thereafter require a technical specification change or other lleense amendment?
I Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
June 29,1983 6.
Important licensing considerations associated with the refueling.
1 Reload fuel will be similar to that reload fuel inserted into the previous cycle.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 732 Spent Fuel Pools are common to Units 1 and 2 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
1830 Licensed 1358 Currently Installed 9,
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991 i
l L
January 10,1983 REFUELING INFORMATION REQUEST 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
2.
Scheduled date for next refueling shutdown: October 15,1982.
3.
Scheduled date for restart following refueling: January 12,1983.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
October 11,1982 6.
Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
7.
The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 732*
Spent Fuel Poolis common to Units 1 and 2.
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
1830 Licensed 1358 Currently Installed 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
SUMMARY
OF UNIT 1 OFERATING EXPERIENCE DECEMBER 1982 12/1 At the beginning of this reporting period Unit I was operating at 850 MWe with the reactor at 91.5% power while investigating saltwater leakage into the main condenser. Load was increased to 910 MWe at 0215 when Indications of saltwater leakage disappeared. At 0830 load was reduced to 810 MWe to investigate saltwater leakage into the main condenser. Load was increased to 910 MWe at 1345 when indications of saltwater leakage disappeared. At 1900 load was reduced to 835 MWe to investigate saltwater leakage into the main condenser. Load was increased to 910 MWe at 2300 when indications of saltwater leakage disappeared.
12/2 At 2045 load was reduced to 870 MWe to investigate saltwater leakage into the main condenser.
12/3 Load was reduced to 840 MWe at 0240 for further investigation of saltwater leakage into the main condenser. Load was increased to 910 MWe at 0615 when indications of saltwater leakage disappeared.
12/4 At 0640 load was reduced to 840 MWe to investigate saltwater leakage into the main condenser. Load was increased to 905 MWe at 1915 when indications of saltwater leakage disappeared.
12/6 At 0015 load was reduced to 835 MWe to investigate saltwater leakage into the main condenser. Load was increased to 905 MWe at 0330 when indications of saltwater leakage disappeared.
12/8 The turbine tripped at 1436 when an mdervoltage condition occurred on the reactor trip bus.
12/9 The reactor was brought critical at 0045 and the unit paralleled at 0323.
Resumed f ull load operation (900 MWe) at 1900.
12/10 At 0100 load was reduced to 805 MWe to investigate saltwater leakage into the main condenser. Load was increased to 905 MWe at 0400 when indications of saltwater leakage disappeared.
12/23 At 2130, load was reduced to 860 MWe in preparation for shutting down the unit due to lack of back up power to #11 Control Room A/C Unit. Load was increased to capacity (905 MWe) at 2200.
12/24 L'oad was reduced to 898 MWe at 2230 due to loss of the plant computer.
12/25 Resumed full load operation (905 MWe) at 0010. At 0855 load was decreased to 890 MWe for moderator temperature coefficient testing.
12/27 Load was increased to capacity (905 MWe) at 1800.
12/29 The generator was taken off the line at 0240 to investigate an indicated low oil level on 12B RCP motor. Completed repair of a leaking lower sight glass lower tap on 12B RCP and the unit paralleled at 1339. Load was increased to capacity (896 MWe) at 2230.
12/21 At the end of this reporting period Unit I was operating at 890 MWe with the reactor at 100% power.
1 l
i
1
SUMMARY
OF UNIT 2 OPERATING EXPERIENCE DECEMBER 1982 12/1 At the beginning of this reporting period, Unit 2 was shutdown for its 4th scheduled refueling outage.
12/31 At the end of this reporting period, Unit 2 remained shutdown for its 4th scheduled refueling cutage.