ML20079B569: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, | {{#Wiki_filter:, | ||
315554-2650 4 | 4 1901 Chouteau Avenue t" | ||
Post O!!re Bu 149 St tows. Missouri 63166 315554-2650 4 | |||
UNION | UNION | ||
'Etscrmc 21?""*"' | |||
322 December 22, 1994 U.S. Nuclear Regulatory Commission Attn: | 322 December 22, 1994 U.S. Nuclear Regulatory Commission Attn: | ||
DOCKET NUMBER 50-483 CALLAWAY PLANT REVISION TO TECHNICAL SPECIFICATION 3/4.8.1 A.C SOURCES | Document Control Desk M il Station P1-137 a | ||
Washington, D.C. | |||
20555 Gentlemen: | |||
ULNRC-3119 DOCKET NUMBER 50-483 CALLAWAY PLANT REVISION TO TECHNICAL SPECIFICATION 3/4.8.1 A.C SOURCES | |||
==Reference:== | ==Reference:== | ||
ULNRC-3114, dated December 9, 1994 | ULNRC-3114, dated December 9, 1994 The referenced. letter transmitted an amendment application to revise Technical Specification (T/S) Surveillance Requirement 4.8.1.1.2f.7 to remove the requirement to perfc m the hot restart within 5 minutes of completing the 24 hour test and place it in a separate T/S. | ||
The referenced. letter transmitted an | The purpose of this transmittal is to submit a revision to the proposed change based upon conversations between Union Electric and the NRC Staff. | ||
amendment application to revise Technical Specification (T/S) Surveillance Requirement 4.8.1.1.2f.7 to remove | The areas of change consist of the following: | ||
the requirement to perfc m the hot restart within 5 minutes of completing the 24 hour test and place it in | Deleting the use of Specification 4.8.1.1.2f.6)b) for the hot restart test signal,. because this specification allows only the use of a simulated loss-of-offsite power in conjunction with a Safety Injection test signal to be used to auto-start the diesel generator. | ||
a separate T/S. | Also we have i | ||
The purpose of this transmittal is to submit a revision to the proposed change based upon conversations between Union Electric and the NRC Staff. | deleted the requirement to monitor operating temperature for stability and will rely solely on the 2 | ||
The areas of change consist of the following: Deleting the use of Specification 4.8.1.1.2f.6)b) for the hot restart test signal,. because this specification allows only the use of a simulated loss-of-offsite power in conjunction with a Safety Injection test signal to be used to auto-start the diesel generator. Also we have | ) | ||
temperature for stability and will rely solely on the 2 | |||
hour minimum operating time as specified in NUREG-1431 prior to performing the hot restart test. | hour minimum operating time as specified in NUREG-1431 prior to performing the hot restart test. | ||
See the attached sheets for the revised marked up page and retyped page. | |||
The conclusions in the Safety Evaluation of the original submittal are also applicable to this change. | |||
Very truly yo rs, | Very truly yo rs, | ||
) | |||
/ | |||
t | t 44 Donald F. Schnell JMC/plr 8p* | ||
Attachment 95010602O5 941222 | Attachment 95010602O5 941222 | ||
\\ | |||
E | E | ||
* PDR | **3 O' vva"" | ||
^" '* | |||
* PDR O | |||
l r | l r | ||
STATE OF MISSOURI | STATE OF MISSOURI | ||
) | |||
CITY OF ST. LOUIS | ) | ||
i Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing' document and knows the content.thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief. | SS CITY OF ST. LOUIS | ||
By_ | ) | ||
i Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing' document and knows the content.thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief. | |||
By_ | |||
8///f Donald F, Schnell Senior Vice President Nuclear SUBSCRIBED and sworn to before me this JdM day of ETJe/+ot-tfra 1994. | |||
r | r | ||
&A.- | |||
BARBARA | BARBARA J. PFAf( rp r-6 NOTAliY PUBLIC-STATE OF MISSOURI hjJ 00MMISS10N EXPIRES APRIL 22,1992 ST. Louts COUNTY. | ||
6 NOTAliY PUBLIC-STATE OF MISSOURI hjJ 00MMISS10N EXPIRES APRIL 22,1992 ST. Louts COUNTY. | |||
r | r | ||
(! | |||
IL | IL | ||
'i c | |||
- cc: ' | |||
T. A. Baxter,;Esq. | |||
Shaw, Pittman, Potts'& Trowbridge | Shaw, Pittman, Potts'& Trowbridge 2300 N.1 Street, N.W. | ||
Washington, D.O. 20037 | Washington, D.O. | ||
20037 | |||
Gaithersburg, MD 20879-5334 | -j M. H. Fletcher Professional Nuclear Consulting, Inc. | ||
. 18225-A Flower Hill Way. | |||
Gaithersburg, MD 20879-5334 i | |||
Bruce Bartlett | 'I L.' Robert'Greger l | ||
Callaway Resident Office U.S. Regulatory Commission | t, Chief, Reactor' Project Branch 1 U.S. Nuclear Regulatory Commission Region III 801 Warrenville Road i | ||
RR#1 | ] | ||
Lisle, IL 60532-4351 Bruce Bartlett Callaway Resident Office U.S. Regulatory Commission RR#1 i | |||
Missouri Public Service Commission P.O. Box 360 | Steedman, MO 65077 l' | ||
Jefferson City, MO 65102 | L. R. Wharton (2) l Office of Nuclear Reactor Regulation i | ||
Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102 | U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 i | ||
11555 Rockville Pike i | |||
f | Rockville, MD 20852 i | ||
Manager, Electric Department Missouri Public Service Commission P.O. | |||
Box 360 | |||
+ | |||
Jefferson City, MO 65102 j | |||
Ron Kucera Department of Natural Resources P.O. | |||
Box 176 Jefferson City, MO 65102 l | |||
t f | |||
f i | |||
I l | |||
s | |||
+ | |||
3. | |||
.w | |||
.,.,y,-, | |||
u e | |||
-}} | |||
Latest revision as of 23:54, 14 December 2024
| ML20079B569 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 12/22/1994 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20079B570 | List: |
| References | |
| ULNRC-3119, NUDOCS 9501060205 | |
| Download: ML20079B569 (3) | |
Text
,
4 1901 Chouteau Avenue t"
Post O!!re Bu 149 St tows. Missouri 63166 315554-2650 4
UNION
'Etscrmc 21?""*"'
322 December 22, 1994 U.S. Nuclear Regulatory Commission Attn:
Document Control Desk M il Station P1-137 a
Washington, D.C.
20555 Gentlemen:
ULNRC-3119 DOCKET NUMBER 50-483 CALLAWAY PLANT REVISION TO TECHNICAL SPECIFICATION 3/4.8.1 A.C SOURCES
Reference:
ULNRC-3114, dated December 9, 1994 The referenced. letter transmitted an amendment application to revise Technical Specification (T/S) Surveillance Requirement 4.8.1.1.2f.7 to remove the requirement to perfc m the hot restart within 5 minutes of completing the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test and place it in a separate T/S.
The purpose of this transmittal is to submit a revision to the proposed change based upon conversations between Union Electric and the NRC Staff.
The areas of change consist of the following:
Deleting the use of Specification 4.8.1.1.2f.6)b) for the hot restart test signal,. because this specification allows only the use of a simulated loss-of-offsite power in conjunction with a Safety Injection test signal to be used to auto-start the diesel generator.
Also we have i
deleted the requirement to monitor operating temperature for stability and will rely solely on the 2
)
hour minimum operating time as specified in NUREG-1431 prior to performing the hot restart test.
See the attached sheets for the revised marked up page and retyped page.
The conclusions in the Safety Evaluation of the original submittal are also applicable to this change.
Very truly yo rs,
)
/
t 44 Donald F. Schnell JMC/plr 8p*
Attachment 95010602O5 941222
\\
E
- 3 O' vva""
^" '*
- PDR O
l r
STATE OF MISSOURI
)
)
)
i Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing' document and knows the content.thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By_
8///f Donald F, Schnell Senior Vice President Nuclear SUBSCRIBED and sworn to before me this JdM day of ETJe/+ot-tfra 1994.
r
&A.-
BARBARA J. PFAf( rp r-6 NOTAliY PUBLIC-STATE OF MISSOURI hjJ 00MMISS10N EXPIRES APRIL 22,1992 ST. Louts COUNTY.
r
(!
IL
'i c
- cc: '
T. A. Baxter,;Esq.
Shaw, Pittman, Potts'& Trowbridge 2300 N.1 Street, N.W.
Washington, D.O.
20037
-j M. H. Fletcher Professional Nuclear Consulting, Inc.
. 18225-A Flower Hill Way.
Gaithersburg, MD 20879-5334 i
'I L.' Robert'Greger l
t, Chief, Reactor' Project Branch 1 U.S. Nuclear Regulatory Commission Region III 801 Warrenville Road i
]
Lisle, IL 60532-4351 Bruce Bartlett Callaway Resident Office U.S. Regulatory Commission RR#1 i
Steedman, MO 65077 l'
L. R. Wharton (2) l Office of Nuclear Reactor Regulation i
U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 i
11555 Rockville Pike i
Rockville, MD 20852 i
Manager, Electric Department Missouri Public Service Commission P.O.
Box 360
+
Jefferson City, MO 65102 j
Ron Kucera Department of Natural Resources P.O.
Box 176 Jefferson City, MO 65102 l
t f
f i
I l
s
+
3.
.w
.,.,y,-,
u e
-