ML20079D971: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20079D971 | | number = ML20079D971 | ||
| issue date = 09/30/1991 | | issue date = 09/30/1991 | ||
| title = Requests Extension to Respond to Generic Ltr 90-06, Resolution of Generic Issue 70, | | title = Requests Extension to Respond to Generic Ltr 90-06, Resolution of Generic Issue 70, PORV & Block Valve Reliability & Generic Issue 94, Addl Low Temp Overpressure Protection for LWRs Until 920131 | ||
| author name = Woodard J | | author name = Woodard J | ||
| author affiliation = ALABAMA POWER CO. | | author affiliation = ALABAMA POWER CO. | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.n | {{#Wiki_filter:.n | ||
I d-W1 | ~.... ~.. | ||
I d-W1 40 invenetA Cener Pwkway Post Offer Box 1295 | |||
. B.mnyat Abhwns 3s201 it?cohone ?OS SOMO% - | |||
r-u J[D. Woodard | |||
r-u J[D. Woodard | -/ b M}DMl! N Cf uce ree+ Neem ray m"' | ||
Septatber 30, 1991 | Septatber 30, 1991 | ||
-Docket Nos. 50-348 50-364 U. S Nuclear Regulatory Commission ATTN: Document Cont rol Desk | |||
~ Washington, DC 20555 Joseph H. Farley Nuclear Plant Request for Extension for Response to Generic Issue 70 | |||
" Power-Operated. Relief Valve and Block Valve Reliability" Der Geaeric Letter 90-06 i: | |||
Der Geaeric Letter 90-06 Gentlemen: | Gentlemen: | ||
On June-25, 1990 the'NRC issued Generic tetter (G.L.) 90-06: Resolution of | On June-25, 1990 the'NRC issued Generic tetter (G.L.) 90-06: | ||
Resolution of | |||
. Generic Issue 70, " Power-0perated Relief Valve and Block Valve Reliability," and Generic Issue 94, " Additional Low-Temperature | |||
: Overpressure Protection for Light-Water Reactors." Alabama Power Company | : Overpressure Protection for Light-Water Reactors." Alabama Power Company | ||
-submitted a response to C.L. 90-06 by {{letter dated|date=December 14, 1990|text=letter dated December 14, 1990}}, in this: letter a commi.tment was made to submit a proposed change to the power-operated relief valve (PORV) technical specification or a justification for the current technical ' specification by October 1991. | |||
N This date was selected to' allow time'to develop a plant-specific probabilistic-risk analysis-(PRA) model and cenduct-analysis-with one and two PORV's inoperable. Alabama Power Company wished to coordinate this effort with that required by G.L. 88-20, " Individual Plant Examination (IPE). for Severe Accident Vulnerabilities " | |||
N | |||
Alabama Power. Company is'. presently performing the PRA analysis-in an effort to quantify the risk associated with operation with one or both PORV's. | Alabama Power. Company is'. presently performing the PRA analysis-in an effort to quantify the risk associated with operation with one or both PORV's. | ||
L | L inor 'rable. ' The. intention of this analysis.is'in justify longer allowed | ||
: outs i times than those specified in G.L. 90-06. However, the PRA model is L | |||
~ not yet complete,- and as such, the necessary technicalLbasis will not be L | |||
available inLtime to. permit an October 1991 submittal. | |||
current schedule, the' PRA model will be complete' by the end of 1991. | Based upon the current schedule, the' PRA model will be complete' by the end of 1991. | ||
Therefore, Alabama Power Company will provide a response to Generic 1ssue | Therefore, Alabama Power Company will provide a response to Generic 1ssue 70 by January 31, 1992. | ||
70 by January 31, 1992. | I | ||
I | . Alabama Power Company recognizca the'NRC's' assertion that the technical L. | ||
specifications should provide assurance of a PORV's ability to perform pressure control functions as wsll as to close and not contribute to-the severity of an. accident as-occurred at THI-2.. Therefore, as-an interim compensatory measure, Alabama Power Company-has-implemented administrative requirements which comply with the limiting conditions of operation as | specifications should provide assurance of a PORV's ability to perform pressure control functions as wsll as to close and not contribute to-the severity of an. accident as-occurred at THI-2.. Therefore, as-an interim compensatory measure, Alabama Power Company-has-implemented administrative requirements which comply with the limiting conditions of operation as | ||
'specified in Enclosure A, Attachment-A-1 of G.L. 90-06. | |||
9110040264 DR | 9110040264 910930 DR ADOCK 05000340 f | ||
'' ~ | |||
PDR J | |||
l 0 | |||
m am | |||
a4 | a4 j | ||
U. S. Nuclear Regulatory Commission Page 2 These provisions will remain in effect until the results of the PRA are available and a final response to G.L. 90-06 is submitted. | |||
If.there are any questions, please advise. | If.there are any questions, please advise. | ||
Respectfully, ALADAMA POWER COMPANY t0. jb )k ANW: | Respectfully, ALADAMA POWER COMPANY t0. jb )k ANW: | ||
J. D. Woodard | J. D. Woodard | ||
J0W/BHW: map 0775 cc: | /*~ | ||
J0W/BHW: map 0775 cc: | |||
otary P My Comission Expires: | Mr.- S. D. Ebneter Hr. S. T. Iloffman SWORN TO AND SUBSCRIBED BEFORE ME Mr. G. F. Maxwell S | ||
Tills 30 DAY OF 3._,c W, 1991 | |||
, Ya e o !?u ")lr')e:lMc0? | |||
/ | |||
otary P My Comission Expires: | |||
/s/es/jp i | |||
L L | L L | ||
i I | i I | ||
| Line 60: | Line 69: | ||
l I | l I | ||
f l~ | f l~ | ||
.}} | |||
Latest revision as of 23:47, 14 December 2024
| ML20079D971 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/30/1991 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| REF-GTECI-070, REF-GTECI-094, REF-GTECI-NI, TASK-070, TASK-094, TASK-OR GL-90-06, NUDOCS 9110040264 | |
| Download: ML20079D971 (2) | |
Text
.n
~.... ~..
I d-W1 40 invenetA Cener Pwkway Post Offer Box 1295
. B.mnyat Abhwns 3s201 it?cohone ?OS SOMO% -
r-u J[D. Woodard
-/ b M}DMl! N Cf uce ree+ Neem ray m"'
Septatber 30, 1991
-Docket Nos. 50-348 50-364 U. S Nuclear Regulatory Commission ATTN: Document Cont rol Desk
~ Washington, DC 20555 Joseph H. Farley Nuclear Plant Request for Extension for Response to Generic Issue 70
" Power-Operated. Relief Valve and Block Valve Reliability" Der Geaeric Letter 90-06 i:
Gentlemen:
On June-25, 1990 the'NRC issued Generic tetter (G.L.) 90-06:
Resolution of
. Generic Issue 70, " Power-0perated Relief Valve and Block Valve Reliability," and Generic Issue 94, " Additional Low-Temperature
- Overpressure Protection for Light-Water Reactors." Alabama Power Company
-submitted a response to C.L. 90-06 by letter dated December 14, 1990, in this: letter a commi.tment was made to submit a proposed change to the power-operated relief valve (PORV) technical specification or a justification for the current technical ' specification by October 1991.
N This date was selected to' allow time'to develop a plant-specific probabilistic-risk analysis-(PRA) model and cenduct-analysis-with one and two PORV's inoperable. Alabama Power Company wished to coordinate this effort with that required by G.L. 88-20, " Individual Plant Examination (IPE). for Severe Accident Vulnerabilities "
Alabama Power. Company is'. presently performing the PRA analysis-in an effort to quantify the risk associated with operation with one or both PORV's.
L inor 'rable. ' The. intention of this analysis.is'in justify longer allowed
- outs i times than those specified in G.L. 90-06. However, the PRA model is L
~ not yet complete,- and as such, the necessary technicalLbasis will not be L
available inLtime to. permit an October 1991 submittal.
Based upon the current schedule, the' PRA model will be complete' by the end of 1991.
Therefore, Alabama Power Company will provide a response to Generic 1ssue 70 by January 31, 1992.
I
. Alabama Power Company recognizca the'NRC's' assertion that the technical L.
specifications should provide assurance of a PORV's ability to perform pressure control functions as wsll as to close and not contribute to-the severity of an. accident as-occurred at THI-2.. Therefore, as-an interim compensatory measure, Alabama Power Company-has-implemented administrative requirements which comply with the limiting conditions of operation as
'specified in Enclosure A, Attachment-A-1 of G.L. 90-06.
9110040264 910930 DR ADOCK 05000340 f
~
PDR J
l 0
m am
a4 j
U. S. Nuclear Regulatory Commission Page 2 These provisions will remain in effect until the results of the PRA are available and a final response to G.L. 90-06 is submitted.
If.there are any questions, please advise.
Respectfully, ALADAMA POWER COMPANY t0. jb )k ANW:
J. D. Woodard
/*~
J0W/BHW: map 0775 cc:
Mr.- S. D. Ebneter Hr. S. T. Iloffman SWORN TO AND SUBSCRIBED BEFORE ME Mr. G. F. Maxwell S
Tills 30 DAY OF 3._,c W, 1991
, Ya e o !?u ")lr')e:lMc0?
/