UNITED STATES OF AMERICA NUCLEAR REGULATORY COMNISSId84 FEB -6 P1 :04 ATOMIC SAFETY AND LICENSING BOARD _ .
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMNISSId84 FEB -6 P1 :04 ATOMIC SAFETY AND LICENSING BOARD _.
60$fIi$N'SkIV:
60$fIi$N'SkIV:
BEFORE ADMINISTRATIVE JUDGES         ERANCH Lawrence Brenner, Chairman Dr. Richard F. Cole Dr. Peter A. Morris In the Matter of                               :    Docket Nos. 30-3 2-0?
BEFORE ADMINISTRATIVE JUDGES ERANCH Lawrence Brenner, Chairman Dr. Richard F. Cole Dr. Peter A. Morris In the Matter of Docket Nos. 30-3 2-0?
iS-953-OL PHILADELPHIA ELECTRIC COMPANY                 -
iS-953-OL PHILADELPHIA ELECTRIC COMPANY
                                                                  /                 ,
/
(Limerick Generating Station,                 :                          ,
(Limerick Generating Station, Units 1 and 2)
Units 1 and 2)
INTERROGATORIES 0F THE CITY OF PHILADELPHIA TO THE NUCLEAR REGULATORY COMMISSION TECHNICAL STAFF Kindly respond to the following requests as they apply to the Nuclear Regulatory Commission's ("NRC") review of the environmental qualification of equipment at the Limerick Nuclear Generating Station.
INTERROGATORIES 0F THE CITY OF PHILADELPHIA TO THE NUCLEAR REGULATORY COMMISSION TECHNICAL STAFF Kindly respond to the following requests as they apply to the Nuclear Regulatory Commission's ("NRC") review of the environmental qualification of equipment at the Limerick Nuclear Generating Station.
: 22. Did the NRC request a list from PECO of all systems and components important-to-safety?       If yes, please provide the response.   '
22.
: 23. Has the NRC determined that PECO is using the proper definitions
Did the NRC request a list from PECO of all systems and components important-to-safety?
(   of safety-related and important-to-safety in their Environmental Qualification program and classification of structures, systems, and components?
If yes, please provide the response.
: 24. What review did the NRC perform of the Appedix A list in the LGS l
23.
l   Environmental Qualification program for:
Has the NRC determined that PECO is using the proper definitions
: a.     completeness
(
: b.     accuracy
of safety-related and important-to-safety in their Environmental Qualification program and classification of structures, systems, and components?
: c.     correct use of safety classifiction terms and definitions
24.
: 25. a.     Has the Staff concluded that PECO has properly considered i
What review did the NRC perform of the Appedix A list in the LGS l
8402080146 840203 i                                 PDR ADOCK 05000352 g                   PDR
l Environmental Qualification program for:
a.
completeness b.
accuracy c.
correct use of safety classifiction terms and definitions 25.
a.
Has the Staff concluded that PECO has properly considered 8402080146 840203 i
i PDR ADOCK 05000352 g
PDR


          ,                  all important-to-safety equipment.
all important-to-safety equipment.
: b. If yes, provide the basis.
b.
: 26. Have you requested that PECO provide a list of all important-to safety equipment which is subject to a harsh environment during an accident for which exception is taken with respect to that harsh environment?       If yes, provide a copy of their response.     If no, explain the basis for concluding PECO complies with 10 CFR $50.49.
If yes, provide the basis.
: 27. Did the Staff review the basis for exclusions from the Q List of     '
: 26. Have you requested that PECO provide a list of all important-to safety equipment which is subject to a harsh environment during an accident for which exception is taken with respect to that harsh environment?
items important-to safety and in a harsh environment but not qualified?
If yes, provide a copy of their response.
If no, explain the basis for concluding PECO complies with 10 CFR $50.49.
27.
Did the Staff review the basis for exclusions from the Q List of items important-to safety and in a harsh environment but not qualified?
Describe the review performed.
Describe the review performed.
: 28. Has the NRC accepted the exceptions PECO is taking to installing the Regulatory Guide 1.97, Rev. 2 equipment?       If so, please identify all equipment PECO is not installing and the NRC's basis for accepting this position.
28.
: 29. Has the NRC reviewed the alternate equipment used instead of Regulatory Guide 1.97, Rev. 2 equipment for adequacy in the Environmental Qualification program?                                   -
Has the NRC accepted the exceptions PECO is taking to installing the Regulatory Guide 1.97, Rev. 2 equipment?
: a. If yes, provide the basis for acceptance of each piece of alternate equipment.
If so, please identify all equipment PECO is not installing and the NRC's basis for accepting this position.
: b. If no, provide the basis for not conduction such a review.
29.
                                                                                                ~
Has the NRC reviewed the alternate equipment used instead of Regulatory Guide 1.97, Rev. 2 equipment for adequacy in the Environmental Qualification program?
l
If yes, provide the basis for acceptance of each piece of a.
!                  30. Kindly provide any actions the NRC Staff has taken to insure that i
alternate equipment.
LGS equipment operability is not inpaired due to
b.
: a. qualification methodology shortcomings;
If no, provide the basis for not conduction such a review.
: h. design bases shortcomings; l                       c. inadequate equipment.
~
l 30.
Kindly provide any actions the NRC Staff has taken to insure that i
LGS equipment operability is not inpaired due to a.
qualification methodology shortcomings; h.
design bases shortcomings; l
c.
inadequate equipment.
l
l


==Reference:==
==Reference:==
Environmental Qualification Briefing of Chairman By Sandia (Board Notification 044), January 5,1984.
Environmental Qualification Briefing of Chairman By Sandia (Board Notification 044), January 5,1984.
l l       Dated:   February.3, 1984
l l
(                                                                                                     .}}
Dated:
February.3, 1984
(.}}

Latest revision as of 22:27, 14 December 2024

Interrogatories 22-30 Re Environ Qualification
ML20080C596
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 02/03/1984
From:
PHILADELPHIA, PA
To:
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Shared Package
ML20080C572 List:
References
ISSUANCES-OL, NUDOCS 8402080146
Download: ML20080C596 (2)


Text

-

CC' ' M '

/~

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMNISSId84 FEB -6 P1 :04 ATOMIC SAFETY AND LICENSING BOARD _.

60$fIi$N'SkIV:

BEFORE ADMINISTRATIVE JUDGES ERANCH Lawrence Brenner, Chairman Dr. Richard F. Cole Dr. Peter A. Morris In the Matter of Docket Nos. 30-3 2-0?

iS-953-OL PHILADELPHIA ELECTRIC COMPANY

/

(Limerick Generating Station, Units 1 and 2)

INTERROGATORIES 0F THE CITY OF PHILADELPHIA TO THE NUCLEAR REGULATORY COMMISSION TECHNICAL STAFF Kindly respond to the following requests as they apply to the Nuclear Regulatory Commission's ("NRC") review of the environmental qualification of equipment at the Limerick Nuclear Generating Station.

22.

Did the NRC request a list from PECO of all systems and components important-to-safety?

If yes, please provide the response.

23.

Has the NRC determined that PECO is using the proper definitions

(

of safety-related and important-to-safety in their Environmental Qualification program and classification of structures, systems, and components?

24.

What review did the NRC perform of the Appedix A list in the LGS l

l Environmental Qualification program for:

a.

completeness b.

accuracy c.

correct use of safety classifiction terms and definitions 25.

a.

Has the Staff concluded that PECO has properly considered 8402080146 840203 i

i PDR ADOCK 05000352 g

PDR

all important-to-safety equipment.

b.

If yes, provide the basis.

26. Have you requested that PECO provide a list of all important-to safety equipment which is subject to a harsh environment during an accident for which exception is taken with respect to that harsh environment?

If yes, provide a copy of their response.

If no, explain the basis for concluding PECO complies with 10 CFR $50.49.

27.

Did the Staff review the basis for exclusions from the Q List of items important-to safety and in a harsh environment but not qualified?

Describe the review performed.

28.

Has the NRC accepted the exceptions PECO is taking to installing the Regulatory Guide 1.97, Rev. 2 equipment?

If so, please identify all equipment PECO is not installing and the NRC's basis for accepting this position.

29.

Has the NRC reviewed the alternate equipment used instead of Regulatory Guide 1.97, Rev. 2 equipment for adequacy in the Environmental Qualification program?

If yes, provide the basis for acceptance of each piece of a.

alternate equipment.

b.

If no, provide the basis for not conduction such a review.

~

l 30.

Kindly provide any actions the NRC Staff has taken to insure that i

LGS equipment operability is not inpaired due to a.

qualification methodology shortcomings; h.

design bases shortcomings; l

c.

inadequate equipment.

l

Reference:

Environmental Qualification Briefing of Chairman By Sandia (Board Notification 044), January 5,1984.

l l

Dated:

February.3, 1984

(.