ML20080H036: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20080H036 | | number = ML20080H036 | ||
| issue date = 01/31/1995 | | issue date = 01/31/1995 | ||
| title = Monthly Operating Rept for Jan 1995 for Waterford 3 Ses.W/ | | title = Monthly Operating Rept for Jan 1995 for Waterford 3 Ses.W/ | ||
| author name = Becker T, Burski R | | author name = Becker T, Burski R | ||
| author affiliation = ENTERGY OPERATIONS, INC. | | author affiliation = ENTERGY OPERATIONS, INC. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = W3F1-95-0020, W3F1-95-20, NUDOCS 9502140379 | | document report number = W3F1-95-0020, W3F1-95-20, NUDOCS 9502140379 | ||
| title reference date = 02-13-1995 | |||
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | ||
| page count = 7 | | page count = 7 | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, | {{#Wiki_filter:, | ||
~; ~ ENTERGY E'E"e """ " ""'' | |||
K61orta. LA 70066 Tet 504 739 6774 | |||
: n. F. surski Deior Nilear Savy VACerford 3 W3F1-95-0020 A4.05 PR February 13, 1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 | : n. F. surski Deior Nilear Savy VACerford 3 W3F1-95-0020 A4.05 PR February 13, 1995 U.S. Nuclear Regulatory Commission ATTN: | ||
Document Control Desk Washington, D.C. 20555 | |||
==Subject:== | ==Subject:== | ||
Waterford 3 SES Docket No. 50-382 | Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen: | ||
License No. NPF-38 Monthly Operating Report Gentlemen: | Attached is the subject monthly report which covers the operating l | ||
Attached is the subject monthly report which covers the operating | statistics for the month of January,1995. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38. | ||
Very truly yours, e | Very truly yours, zt e | ||
R.F. Burski Director Nuclear Safety i | |||
RFB/DFL/ssf | RFB/DFL/ssf i | ||
Attachment cc: | |||
L.J. Callan (NRC Region IV) | |||
C.P. Patel, NRC-NRR i | |||
R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.) | |||
J.T. Wheelock (INP0 Records Center) | J.T. Wheelock (INP0 Records Center) | ||
NRC Resident Inspectors Office 7 ' n c c- | NRC Resident Inspectors Office 7 ' n c c-t | ||
"~ d | |||
..,n | |||
9502140379 950131 | . 4 9502140379 950131 M i PDR ADDCK 050003B2 R | ||
PDR l | |||
] | |||
1 I | |||
s 1 | |||
i NRC MONTHLY OPERATING REPORT f | |||
NRC MONTHLY OPERATING REPORT | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATIONS | OF OPERATIONS i | ||
JANUARY 1995 | WATERFORD 3 JANUARY 1995 P | ||
P | .) | ||
The unit operated at an average reactor power of 99.8% and experienced no shutdowns or significant power reductions during the period. | |||
The unit operated at an average reactor power of 99.8% and experienced no shutdowns or significant power reductions during the period. | i i | ||
i s | i s | ||
I f | I f | ||
| Line 51: | Line 57: | ||
i i | i i | ||
i | i | ||
} | |||
i f | i f | ||
l i | l i | ||
| Line 58: | Line 64: | ||
l | l | ||
i | |||
( | ( | ||
t PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES t | |||
FAILURES AND CHALLENGES | WATERFORD 3 During the month of January 1995, there were no pressurizer safety valve failures or challenges. | ||
During the month of January 1995, there were no pressurizer safety valve failures or challenges. | |||
I i' | I i' | ||
F h | F h | ||
'I I | |||
i i | i i | ||
h i | h i | ||
I | I | ||
OPERATING DATA REPORT DOCKET NUMBER: 50-382 | OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: FEBRUARY,1995 t | ||
UNIT NAME: WATERFORD 3 DATE OF REPORT: FEBRUARY,1995 | COMPLETED BY: | ||
COMPLETED BY: T.S. BECKER | T.S. BECKER TELEPHONE: 504-739-6683 j | ||
OPERATING STATUS I | |||
Gross Hours in Reporting Period: 744 | 1. | ||
Reporting Period: January,1995 Gross Hours in Reporting Period: 744 2. | |||
Maximum Dependable Capacity (Net MWe): 1075 | Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 i | ||
Design Electrical Rating (Net MWe): 1104 3. | |||
Power Level to which Restricted (if any) (Net MWe): N/A 4. | |||
Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE 5. | |||
Number of Hours Reactorwas Critical l | |||
744.0 744 69,466.8 6. | |||
neactor Reserve Shutdown Hours ! | |||
7. | |||
Hours Generator was On-line 744.0 744 68,588.3 8. | |||
Generated (MWH) | Unit Reserve Shutdown Hours ! | ||
i | 9. | ||
: 10. Gross Electrical Energy | Gross Thermal Energy Generated (MWH) 2,517,937 2,517,937 226,847,546 i | ||
: 11. Net Electrical Energy Generated (MWH) | : 10. Gross Electrical Energy l | ||
: 12. Reactor Service Factor | Generated (MWH) 838,480 838,480 75,572,940 | ||
: 13. Reactor Availability Factor | : 11. Net Electrical Energy Generated (MWH) 804,313 804,313 72,046,679 | ||
: 14. Unit Service Factor | : 12. Reactor Service Factor 100.0 100.0 84.7' | ||
: 15. Unit Availability Factor | : 13. Reactor Availability Factor 100.0 100.0 84.7 | ||
: 16. Unit Capacity Factor (using MDC) | : 14. Unit Service Factor 100.0 100.0 83.6 i | ||
: 17. Unit Capacity Factor (Using DER) | : 15. Unit Availability Factor 100.0 100.0 83.6 | ||
: 18. Unit Forced Outage Rate | : 16. Unit Capacity Factor (using MDC) 100.6 100.6 81.7 | ||
: 17. Unit Capacity Factor (Using DER) 97.9 97.9 79.6 | |||
: 18. Unit Forced Outage Rate 0.0 0.0 3.1 | |||
.#4 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: FEBRUARY,1995 i-COMPLETED BY: | |||
T.S. BECKER TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Con't) 19. | |||
N/A | Shutdowns Scheduled over next 6 Months (type, date and duration of each): | ||
N/A 20. | |||
If Shutdown at end of report period, estimated date of startup: | |||
: 22. Hours in Reporting Period | 21. | ||
: 23. Unit Forced Outage Hours | Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE | ||
: 22. Hours in Reporting Period 744.0 744.0 82,009.0 | |||
: 23. Unit Forced Outage Hours 0.0 0.0 2,210.2 24. | |||
Nameplate Rating (Gross MWe): 1200 25. | |||
If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons: N/A t | |||
6 k | 6 k | ||
t | t | ||
l AVERAGE DAILY UNIT POWER LEVEL 1 | |||
l AVERAGE DAILY UNIT POWER LEVEL | DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: FEBRUARY,1995 COMPLETED BY: | ||
DOCKET NUMBER: 50-382 | T.S. BECKER TELEPHONE: 504-739-6683 i | ||
UNIT NAME: WATERFORD 3 | MONTH JANUARY.1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) | ||
TELEPHONE: 504-739-6683 | (MWe-NET) 1 1084 17 1082 2 | ||
1082 18 1083 3 | |||
7 | 1082 19 1082 4 | ||
9 | 1082 20 1082 5 | ||
1082 21 1082 6 | |||
10 | 1081 22 1083 7 | ||
12 | 7 1042 23 1082 8 | ||
14 | 1080 24 1083 t | ||
9 1084 25 1083 | |||
INSTRUCTIONS | ^ | ||
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. | 10 1083 26 1082 11 1082 27 1081 12 1081 28 1082 13 1082 29 1083 14 1083 30 1082 15 1083 31 1083 l | ||
16' 1084 1 | |||
) | |||
INSTRUCTIONS l | |||
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
) | |||
b | b | ||
' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 4 | |||
DOCKET NUMBER: 50-382 | DATE OF REPORT: FEBRUARY,1995 COMPLETED BY: | ||
UNIT NAME: WATERFORD 3 | T.S. BECKER TELEPHONE:.504-739-6683 REPORT FOR JANUARY.1995 j | ||
DATE OF REPORT: FEBRUARY,1995 COMPLETED BY: T.S. BECKER | Type Method of Shutting i | ||
TELEPHONE: .504-739-6683 REPORT FOR JANUARY.1995 | F = Forced Duration Down the Reactor or Cause, Comments and Number Date - | ||
S = Scheduled (Hours) | |||
Reason (1) | |||
Reducina Power (2) | |||
Corrective Actions | |||
{ | |||
NONE l | |||
l 1 | l 1 | ||
j | j (1) REASON (2) METHOD 4 | ||
(1) REASON | A= | ||
License Examination | Equipment Failure (explain) 1= | ||
F= | Manual B= | ||
H= | Maintenance or Test 2= | ||
Manual Scram C= | |||
Refueling 3= | |||
- Automatic Scram l | |||
D= | |||
Regulatory Restriction 4= | |||
Continuation from Previous Period i | |||
E= | |||
Operator Training and 5= | |||
Power Reduction License Examination 6= | |||
Other(explain) | |||
F= | |||
Administrative l | |||
G= | |||
Operational Error (explain) | |||
H= | |||
Other(explain) | |||
_ _ _.. _ _ _ _ _ _ _, _. _........ _ -,_,,. _. _,.. _ _ _ _., _. ~... _ - _. _ _ _... _, | |||
.}} | |||
Latest revision as of 22:05, 14 December 2024
| ML20080H036 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 01/31/1995 |
| From: | Becker T, Burski R ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| W3F1-95-0020, W3F1-95-20, NUDOCS 9502140379 | |
| Download: ML20080H036 (7) | |
Text
,
~; ~ ENTERGY E'E"e """ " ""
K61orta. LA 70066 Tet 504 739 6774
- n. F. surski Deior Nilear Savy VACerford 3 W3F1-95-0020 A4.05 PR February 13, 1995 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating l
statistics for the month of January,1995. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours, zt e
R.F. Burski Director Nuclear Safety i
RFB/DFL/ssf i
Attachment cc:
L.J. Callan (NRC Region IV)
C.P. Patel, NRC-NRR i
R.B. McGehee N.S. Reynolds F. Yost (Utility Data Institute, Inc.)
J.T. Wheelock (INP0 Records Center)
NRC Resident Inspectors Office 7 ' n c c-t
"~ d
..,n
. 4 9502140379 950131 M i PDR ADDCK 050003B2 R
PDR l
]
1 I
s 1
i NRC MONTHLY OPERATING REPORT f
SUMMARY
OF OPERATIONS i
WATERFORD 3 JANUARY 1995 P
.)
The unit operated at an average reactor power of 99.8% and experienced no shutdowns or significant power reductions during the period.
i i
i s
I f
i i
i i
i
}
i f
l i
f i
i t
l
i
(
t PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES t
WATERFORD 3 During the month of January 1995, there were no pressurizer safety valve failures or challenges.
I i'
F h
'I I
i i
h i
I
OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: FEBRUARY,1995 t
COMPLETED BY:
T.S. BECKER TELEPHONE: 504-739-6683 j
OPERATING STATUS I
1.
Reporting Period: January,1995 Gross Hours in Reporting Period: 744 2.
Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 i
Design Electrical Rating (Net MWe): 1104 3.
Power Level to which Restricted (if any) (Net MWe): N/A 4.
Reasons for Restriction (if any): N/A THIS MONTH YR TO DATE CUMULATIVE 5.
Number of Hours Reactorwas Critical l
744.0 744 69,466.8 6.
neactor Reserve Shutdown Hours !
7.
Hours Generator was On-line 744.0 744 68,588.3 8.
Unit Reserve Shutdown Hours !
9.
Gross Thermal Energy Generated (MWH) 2,517,937 2,517,937 226,847,546 i
- 10. Gross Electrical Energy l
Generated (MWH) 838,480 838,480 75,572,940
- 11. Net Electrical Energy Generated (MWH) 804,313 804,313 72,046,679
- 12. Reactor Service Factor 100.0 100.0 84.7'
- 13. Reactor Availability Factor 100.0 100.0 84.7
- 14. Unit Service Factor 100.0 100.0 83.6 i
- 15. Unit Availability Factor 100.0 100.0 83.6
- 16. Unit Capacity Factor (using MDC) 100.6 100.6 81.7
- 17. Unit Capacity Factor (Using DER) 97.9 97.9 79.6
- 18. Unit Forced Outage Rate 0.0 0.0 3.1
.#4 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: FEBRUARY,1995 i-COMPLETED BY:
T.S. BECKER TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Con't) 19.
Shutdowns Scheduled over next 6 Months (type, date and duration of each):
N/A 20.
If Shutdown at end of report period, estimated date of startup:
21.
Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
- 22. Hours in Reporting Period 744.0 744.0 82,009.0
- 23. Unit Forced Outage Hours 0.0 0.0 2,210.2 24.
Nameplate Rating (Gross MWe): 1200 25.
If Changes Occur in Capacity Ratings (Items Number 2 and 24) Since Last Report, Give Reasons: N/A t
6 k
t
l AVERAGE DAILY UNIT POWER LEVEL 1
DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: FEBRUARY,1995 COMPLETED BY:
T.S. BECKER TELEPHONE: 504-739-6683 i
MONTH JANUARY.1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET)
(MWe-NET) 1 1084 17 1082 2
1082 18 1083 3
1082 19 1082 4
1082 20 1082 5
1082 21 1082 6
1081 22 1083 7
7 1042 23 1082 8
1080 24 1083 t
9 1084 25 1083
^
10 1083 26 1082 11 1082 27 1081 12 1081 28 1082 13 1082 29 1083 14 1083 30 1082 15 1083 31 1083 l
16' 1084 1
)
INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
)
b
' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 4
DATE OF REPORT: FEBRUARY,1995 COMPLETED BY:
T.S. BECKER TELEPHONE:.504-739-6683 REPORT FOR JANUARY.1995 j
Type Method of Shutting i
F = Forced Duration Down the Reactor or Cause, Comments and Number Date -
S = Scheduled (Hours)
Reason (1)
Reducina Power (2)
Corrective Actions
{
NONE l
l 1
j (1) REASON (2) METHOD 4
A=
Equipment Failure (explain) 1=
Manual B=
Maintenance or Test 2=
Manual Scram C=
Refueling 3=
- Automatic Scram l
D=
Regulatory Restriction 4=
Continuation from Previous Period i
E=
Operator Training and 5=
Power Reduction License Examination 6=
Other(explain)
F=
Administrative l
G=
Operational Error (explain)
H=
Other(explain)
_ _ _.. _ _ _ _ _ _ _, _. _........ _ -,_,,. _. _,.. _ _ _ _., _. ~... _ - _. _ _ _... _,
.