ML20080M978: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.=.           ._
{{#Wiki_filter:.=.
l l
January 25, 1984 Mr. David M. Rohrer Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission.
January 25, 1984 Mr. David M. Rohrer Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission.
  --        Washington, D. C. 20555 ULNRC-732
Washington, D. C.
20555 ULNRC-732


==Dear Mr. Rohrer:==
==Dear Mr. Rohrer:==
 
During our meeting with you on January 20, 1984, you requested that we provide you with a detailed description of the changes made in our Radiological Emergency Response Plan (RERP) in arriving at Revision 6.
During our meeting with you on January 20, 1984, you requested that we provide you with a detailed description of the changes made in our Radiological Emergency Response Plan (RERP) in arriving at Revision 6. This effort has now been completed and is attached.
This effort has now been completed and is attached.
If you have any questions on this revision or the enclosure, we are available to discuss it at your convenience.
If you have any questions on this revision or the enclosure, we are available to discuss it at your convenience.
Very truly yours, M. A. Stiller Manager, Nuclear Safety and Emergency Preparedness MAS /dch Enclosure cc:   Tom Ploski,-Region III F
Very truly yours, M. A. Stiller Manager, Nuclear Safety and Emergency Preparedness MAS /dch Enclosure cc:
Tom Ploski,-Region III F


l'
l'
: 1-CHAPTER 1 If SECTION'l.1 a.
: 1-If CHAPTER 1 SECTION'l.1 a.
:[.                 ' Deleted definition of " Clean Area / Equipment" and modified ii                    definition of " Contaminated Area" to reflect Health Physics
:[.
  -                  definitions.
' Deleted definition of " Clean Area / Equipment" and modified i i definition of " Contaminated Area" to reflect Health Physics definitions.
Definition of " Emergency Planning Zone" corrected typo and added "EPZ" for clarification after plume exposure and
Definition of " Emergency Planning Zone" corrected typo and added "EPZ" for clarification after plume exposure and ingestion exposure pathways.
,                    ingestion exposure pathways.
Definition " Emergency Plan Implementing Procedures" corrected.
  --                Definition " Emergency Plan Implementing Procedures" corrected.
wording.
wording.
Corrected the location of the center point of the " Exclusion Area" and " Exclusion Area Boundary".
Corrected the location of the center point of the " Exclusion Area" and " Exclusion Area Boundary".
i k'                 Added the definition of owner Controlled Area.
i k' Added the definition of owner Controlled Area.
l
l Changed " Personnel Monitoring Equipment" to " Personnel Monitoring Devices" and corrected wording to reflect-Health Physics definition.
-                    Changed " Personnel Monitoring Equipment" to " Personnel Monitoring Devices" and corrected wording to reflect-Health Physics definition.
J Deleted the definition of " Publics" per NRC request.
J Deleted the definition of " Publics" per NRC request.                                                           Not defined in-Webster's Dictionary.                                                                                             i Corrected definition of " Radiation Area" to be consistent with Health Physics and 10CFR definitions.
Not defined in-Webster's Dictionary.
Corrected definition of " Radiological Controlled Area" to be
i Corrected definition of " Radiation Area" to be consistent with Health Physics and 10CFR definitions.
;-                    consistent with Health Physics definitions.
Corrected definition of " Radiological Controlled Area" to be consistent with Health Physics definitions.
Added definition of Recovery Manager.
Added definition of Recovery Manager.
Added a clarification statement to definitions of " Site                                                                     l Emergency" and " Unusual Event" to correlate with NUREG-0654,-                                                               >
l Added a clarification statement to definitions of " Site Emergency" and " Unusual Event" to correlate with NUREG-0654,-
3 per.NRC request.
per.NRC request.
4 t
3 4
4 s
t 4
Y 1
s Y
1


                                            ~
~
      .~
.~
                            - CHAPTER 2 SECTION 2.1 Page 2-2                     Added "and-authorities" per NRC request.
- CHAPTER 2 SECTION 2.1 Page 2-2 Added "and-authorities" per NRC request.
SECTION 2.4 Page 2-5                   Typo corrected.
SECTION 2.4 Page 2-5 Typo corrected.
SECTION 2.5 Page 2-6                   Corrected grammatical errors.
SECTION 2.5 Page 2-6 Corrected grammatical errors.
SECTION 2.6 Page 2-7                   Deleted last sentence under Security Plan and Procedures. Access is controlled by normal
SECTION 2.6 Page 2-7 Deleted last sentence under Security Plan and Procedures.
  - )"                                                         Security Procedure, no special provisions had to be written.
Access is controlled by normal
- )"
Security Procedure, no special provisions had to be written.
4 a
4 a
4 2
4 2
                  . _. -- .          . - .  ._. _ - _ _ - _ . .          . . . _ _ . _ _ _ - . _ .  . _ . . - _ . - _ _ _ . . . ~ _ , _ _ - _
. _.. - _. - _ _ _... ~ _, _
: a. . .
 
                  ~
~
  $N
: a..
              . CHAPTER 3 SECTION 3.1
$N
    -          Corrected reference to the Appendix due to the deletion of Appendix G in Rev. SA.
. CHAPTER 3 SECTION 3.1 Corrected reference to the Appendix due to the deletion of Appendix G in Rev. SA.
i-           SECTION 3.1.1.3 Changed " Implementing Document"       to " Emergency Plan Implementing Procedures" to be consistent in terminology.
i-SECTION 3.1.1.3 Changed " Implementing Document" to " Emergency Plan Implementing Procedures" to be consistent in terminology.
SE,CTION 3.1.1.5 Grammatical corrections and added " Authority" per NRC request.
SE,CTION 3.1.1.5 Grammatical corrections and added " Authority" per NRC request.
  .            SECTION 3.1.1.6
SECTION 3.1.1.6 Changed " Implementing Document" to " Emergency Plan Implementing Procedures" to be consistent in terminology.
  $            Changed " Implementing Document" to " Emergency Plan Implementing Procedures" to be consistent in terminology.
SECTION 3.2 Grammatical correction.
SECTION 3.2 Grammatical correction.
SECTICN 3.3 Changed " appropriate" to " Plant and Corporate Management" to be more specific and made a reference to defi.ciency tracking for clarification.
SECTICN 3.3 Changed " appropriate" to " Plant and Corporate Management" to be more specific and made a reference to defi.ciency tracking for clarification.
Added reference to Administrative Procedures for clarification.
Added reference to Administrative Procedures for clarification.
d 4
d 4
3
3 c
                                        -m                                 ,-
-m
                      -. c      . -            --,        --    ..


                            ~
~
CHAPTER 4        %
-[
-[
CHAPTER 4 PAGE 4-1 Added clarification statement for titles of emergency j
PAGE 4-1   Added clarification statement for titles of emergency j                             classifications to correlate with NUREG-0654 per NRC request.
classifications to correlate with NUREG-0654 per NRC request.
PAGE 4-2   Added' wording to change 30 minutes to a goal of 15 minutes'for accident classification per NRC request.
PAGE 4-2 Added' wording to change 30 minutes to a goal of 15 l-minutes'for accident classification per NRC request.
l-SECTION 4.1.3 PAGE 4-3   Wording. change from place on standby, to notify the
SECTION 4.1.3 PAGE 4-3 Wording. change from place on standby, to notify the Corporate Emergency Organization for clarification.
-                            Corporate Emergency Organization for clarification.
f, SECTION 4.2.1.3 I
f,                 SECTION 4.2.1.3 I                 Deleted last two paragraphs because Figures 4-1 to 4-6 were
Deleted last two paragraphs because Figures 4-1 to 4-6 were deleted.
                                  ~
~
deleted.
9 E
9 E                 SECTION 4.2.l'.4 Grammatical error corrected.
SECTION 4.2.l'.4 Grammatical error corrected.
SECTION 4.2'.l.5           '
SECTION 4.2'.l.5 Grammatical error corrected.
Grammatical error corrected.
SECTION 4.2.1.6 Grammatical error ccrrected.
SECTION 4.2.1.6 Grammatical error ccrrected.
SECTION 4.2.1.8 Added the word " drive" to correct the terminology.
SECTION 4.2.1.8 Added the word " drive" to correct the terminology.
SECTION 4.2.lT9.
SECTION 4.2.lT9.
Grammatical error corrected.
Grammatical error corrected.
FIGURES 4-1, 4-2,:4-3, 4-4, 4-5, 4-6 were deleted. The graphs were unreadable-and there were no instructions for their use.
FIGURES 4-1, 4-2,:4-3, 4-4, 4-5, 4-6 were deleted.
The graphs were unreadable-and there were no instructions for their use.
Deleted withsNRC concurrence.
Deleted withsNRC concurrence.
                . TABLE 4-1 EMERGENCY ACTION LEVELS All "TBDs" were added to complete the EALs. The following EALs had TBDs removed:
TABLE 4-1 EMERGENCY ACTION LEVELS All "TBDs" were added to complete the EALs.
Group 1 Conditions B,         E, F Group 2 Conditions A, C, F, G, H Group 6 Conditions C, D 4
The following EALs had TBDs removed:
Group 1 Conditions B, E,
F Group 2 Conditions A, C, F, G, H
Group 6 Conditions C, D 4
s
s
      %J,
%J,
                                  --  $+ r       ,-        ,.,-  -  -            ,
$+
r


t
t
      -        -l           -    ,  -~                               ,
-l
-~
4 t
4 t
  -                Group 8 Conditions A, B, C, F
Group 8 Conditions A, B, C, F
  ^
^
          ~"and" was changed to "or" per NRC request on the following g        EALs:
~"and" was changed to "or" per NRC request on the following EALs:
li-u                Group 2 Conditions D, E, G, H Group 3 Conditions I, J, K Group 5 Conditions H Group 7 Conditions B, K Group B Condition G
g li-Group 2 Conditions D, E, G, H u
Group 3 Conditions I, J, K
Group 5 Conditions H Group 7 Conditions B, K
{
{
~
Group B Condition G
Review and evaluation by SNUPPS and UE corrected the following
~
  ,        EALs for the Callaway Plant:
Review and evaluation by SNUPPS and UE corrected the following EALs for the Callaway Plant:
$                Group 1 Conditions A, B,C, D,   E, F r
Group 1 Conditions A, B,C, D,
:                Group 2 Conditions A, C, D, E, F,G,   H Group 3 Conditions A, B, C, D, E, F,G,   H, I Group 5 Conditions A, B, C, D Group 6 Conditions A, B, C, D Group 7 Conditions B, C, D, E, I Group 8 Conditions D, F e         Specific. indicators, such as meter, panel or instrument numbers, were added to the following EALs:
E, F
-[v Group l Conditions A, B, C, D, E, F, G Group 2 Conditions C, D, E, F, G, H Group 3 Conditions A, E, F, I Group 4 Conditions A, B, C, D, E, F Group 5 Conditions A, B, C, D, E Group 6 Conditions A, B, C, D, E, H, I Group 8 Conditions B, C EALs were printed in such a manner as to eliminate having EALs continue onto the next page. By doing this, most of the continued statements were eliminated and most of the EALs are not split between pages. The EALs are now identical to the EALs contained in the Emergency Plan Implementing Procedure, 5
r Group 2 Conditions A, C, D, E,
F,G, H
Group 3 Conditions A, B, C,
D, E,
F,G, H,
I Group 5 Conditions A, B, C, D Group 6 Conditions A, B, C, D
Group 7 Conditions B, C, D,
E, I
Group 8 Conditions D, F
e Specific. indicators, such as meter, panel or instrument
-[
numbers, were added to the following EALs:
v Group l Conditions A, B, C,
D, E,
F, G Group 2 Conditions C, D,
E, F,
G, H
Group 3 Conditions A, E,
F, I
Group 4 Conditions A, B,
C, D,
E, F
Group 5 Conditions A, B,
C, D,
E Group 6 Conditions A, B,
C, D,
E, H,
I Group 8 Conditions B, C
EALs were printed in such a manner as to eliminate having EALs continue onto the next page.
By doing this, most of the continued statements were eliminated and most of the EALs are not split between pages.
The EALs are now identical to the EALs contained in the Emergency Plan Implementing Procedure, 5


    ?.                                                        .
?.
_ g, i' -
_ g, i' -
f         EIP-ZZ-00101, Classification of Emergencies, Revision 1.     (Date of issue January 5, 1984)
f EIP-ZZ-00101, Classification of Emergencies, Revision 1.
    .'        TABLE 4-2 1
(Date of issue January 5, 1984)
* Added cross references to NUREG-0654, Unusual Event items 14 through 17 to complete the cross references. These were
TABLE 4-2 1
:- i -         overlooked in this table in Revision SA.
Added cross references to NUREG-0654, Unusual Event items 14 through 17 to complete the cross references.
    ?
These were
i         TABLE 4-3 All instrument and range "TBDs" were added to complete the table.
:- i -
overlooked in this table in Revision SA.
?
i TABLE 4-3 All instrument and range "TBDs" were added to complete the table.
17 1
17 1
9
9
'; d 6
'; d 6


.)             '
.)
~d e
~d e
CHAPTER 5 SECTION 5.1.1 lv
CHAPTER 5 SECTION 5.1.1 lv(
(
7.<
Corrected a reference to another section'.
Corrected a reference to another section'.
  $       Deleted the word " divisions" in reference to the plant i'       organization to be consistent in terminology.
7.<$
  $        Added " Material Management" to update the RERP in plant
Deleted the word " divisions" in reference to the plant i'
'F         organizational change.
organization to be consistent in terminology.
b       Deleted " Division" in Sections 5.1.1.2 and 5.1.1.3.
Added " Material Management" to update the RERP in plant
-U El       Added entire Section 5.1.1.4 Material Management to update the
'F organizational change.
  -        RERP in plant organizational change.
b Deleted " Division" in Sections 5.1.1.2 and 5.1.1.3.
  'r -     SECTION 5.1.1.5 6-
-U El Added entire Section 5.1.1.4 Material Management to update the RERP in plant organizational change.
,w lC       Changed section number as a result of adding Material
'r -
- e.       Management.
SECTION 5.1.1.5 6-
h       Corrected two typos.
,w lC Changed section number as a result of adding Material
  ',      SECTION 5.1.2
- e.
[       Added " authority and" to indicate that the Vice President does have the necessary authority for all activities relating to the
Management.
  .        Callaway Plant, SECTION 5.1.2.2 Added the departments of Nuclear Fuels and Nuclear Services i       which were inadvertently left out of Rev. SA.
h Corrected two typos.
c
SECTION 5.1.2
* Grammatical correction.
[
Added " authority and" to indicate that the Vice President does have the necessary authority for all activities relating to the Callaway Plant, SECTION 5.1.2.2 Added the departments of Nuclear Fuels and Nuclear Services i
which were inadvertently left out of Rev. SA.
c Grammatical correction.
SECTION 5.2 Added "and authority" to clarify that the On-Shift Emergency Organization has the authority to take any necessary actions to mitigate the consequences of an emergency.
SECTION 5.2 Added "and authority" to clarify that the On-Shift Emergency Organization has the authority to take any necessary actions to mitigate the consequences of an emergency.
          . Changed Emergency Management individuals to Emergency Coordinator or Recovery Manager for a specific reference on who activates the Emergency Organizations.
Changed Emergency Management individuals to Emergency Coordinator or Recovery Manager for a specific reference on who activates the Emergency Organizations.
Added a sentence to indicate that members of the Emergency Organizations have the necessary authority to perform their duties. Added per request from the NRC.
Added a sentence to indicate that members of the Emergency Organizations have the necessary authority to perform their duties.
Added per request from the NRC.
7
7


    ?
?
A f         SECTION 5.2.1 Changed the EDO assuming Emergency Coordinator responsibilities in the Control Room to the TSC. This was done at the request y           of the Plant Manager. The Shift Supervisor should remain in control of the Control Room.
A f
SECTION 5.2.1 Changed the EDO assuming Emergency Coordinator responsibilities in the Control Room to the TSC.
This was done at the request y
of the Plant Manager.
The Shift Supervisor should remain in control of the Control Room.
A sentence was added to ensure oncoming personnel were briefed prior to-assuming responsibilities, per NRC request.
A sentence was added to ensure oncoming personnel were briefed prior to-assuming responsibilities, per NRC request.
SECTION 5.2.2.1
SECTION 5.2.2.1 Clarification of the actions the Shift Supervisor takes after declaration of an emergency.
  '          Clarification of the actions the Shift Supervisor takes after
Added the Shift Supervisor has L
* declaration of an emergency. Added the Shift Supervisor has L         full authority of the Emergency Corodinator during emergencies per NRC request.
full authority of the Emergency Corodinator during emergencies per NRC request.
SECTION 5.2.2.3
SECTION 5.2.2.3
  -.D   eg-   -,    . . . ,
-.D eg-Deleted an inappropriate reference.
'"            Deleted an inappropriate reference.
SECTION 5.2.2.4 Deleted generic references to procedures.
SECTION 5.2.2.4 Deleted generic references to procedures.
SECTION 5.2.2.6 Corrected the title of Rad / Chem Foreman.
SECTION 5.2.2.6 Corrected the title of Rad / Chem Foreman.
x SECTION 5.2.2.7
x SECTION 5.2.2.7 Corrected reference to another section.
  $          Corrected reference to another section.
SECTION 5.2.2.8 Added statement to indicate Security will provide support to emergency teams.
SECTION 5.2.2.8 Added statement to indicate Security will provide support to emergency teams.
SECTION 5.2.2.9                       ,
SECTION 5.2.2.9 Clarified the duties of the Rad / Chem Technicians.
Clarified the duties of the Rad / Chem Technicians. Corrected reference to another section.
Corrected reference to another section.
l SECTION 5.2.2.10 Corrected reference to another section.
l SECTION 5.2.2.10 Corrected reference to another section.
SECTION 5.2.2.11-Grammatical clarification.
SECTION 5.2.2.11-Grammatical clarification.
Line 176: Line 221:
8
8


                                                                              ~-
~-
k Corrected reference to another section.
k Corrected reference to another section.
SECTION 5.2.3 Deleted generic reference to procedures.
SECTION 5.2.3 Deleted generic reference to procedures.
Added a clarifying statement to indicate capability exists for
Added a clarifying statement to indicate capability exists for
    ~
~
continuous operation of the On-Site Emergency Organization.
continuous operation of the On-Site Emergency Organization.
Spelling correction.
Spelling correction.
        'SECTION 5.2.3.1 Added a statement to indicate the authority of the E.7.ergency
'SECTION 5.2.3.1 Added a statement to indicate the authority of the E.7.ergency Coordinator per NRC recommendation.
  -      Coordinator per NRC recommendation.
Word change for clarification.
Word change for clarification.
Indicated that the Manager Callaway Plant is the primary Emergency Coordinator per NRC request.
Indicated that the Manager Callaway Plant is the primary Emergency Coordinator per NRC request.
Line 193: Line 237:
Added " selected" to Supervising Engineers per ORC review.
Added " selected" to Supervising Engineers per ORC review.
SECTION 5.2.3.5
SECTION 5.2.3.5
        .Added entire section of Operations and Maintenance Coordinator to reflect Emergency Organization change, per Plant Staff recommendation.
.Added entire section of Operations and Maintenance Coordinator to reflect Emergency Organization change, per Plant Staff recommendation.
The Revision SA section 5.2.3.5 was changed to 5.2.3.8.
The Revision SA section 5.2.3.5 was changed to 5.2.3.8.
SECTION 5.2.3.6 Typo corrections.
SECTION 5.2.3.6 Typo corrections.
Line 200: Line 244:
9
9


                .          ~ . .            .
~..
                                        --m ,,
--m SECTION 5.2.3.7 Corrected reference to another section.
SECTION 5.2.3.7                                                         .
-              Corrected reference to another section.
Typo corrected.
Typo corrected.
Added " selected" to Records Management System Supervisors per ORC review.
Added " selected" to Records Management System Supervisors per ORC review.
SECTION 5.2.3.8 Renumbered section, Revision SA*'section number 5.2.3.5, due to
SECTION 5.2.3.8 Renumbered section, Revision SA*'section number 5.2.3.5, due to addition of Operations and Maintenance Coordinator.
  -            addition of Operations and Maintenance Coordinator.
t Deleted Assistant Manager, Operations and Maintenance due to the addition of the position of Operations and Maintenance Coordinator.
t Deleted Assistant Manager, Operations and Maintenance due to the addition of the position of Operations and Maintenance Coordinator.
i           Changed "Off-Duty Shift Supervisors" to " Selected Shift / Operating Supervisors".per ORC review.
i Changed "Off-Duty Shift Supervisors" to " Selected Shift / Operating Supervisors".per ORC review.
All subsequent sections in the 5.2.3 series have been renumbered due to the addition of Section 5.2.3.5 and moving ~
All subsequent sections in the 5.2.3 series have been renumbered due to the addition of Section 5.2.3.5 and moving ~
the SA section of 5.2.3.5 to Revision 6, Section 5.2.3.8.
the SA section of 5.2.3.5 to Revision 6, Section 5.2.3.8.
SECTION 5.2.3.9 Renumbered section.
SECTION 5.2.3.9 Renumbered section.
  ~-
SECTION 5.2.3.10
SECTION 5.2.3.10 Renumbered section.
~-
Renumbered section.
SECTION 5.2.3.11 Renumbered section.
SECTION 5.2.3.11 Renumbered section.
Deleted the word " calculating" before off-site dose projections. Calculations may not have to be manually performed if RRIS is functional.
Deleted the word " calculating" before off-site dose projections.
Calculations may not have to be manually performed if RRIS is functional.
Corrected reference to another section.
Corrected reference to another section.
            - Added " selected" to Rad / Chem Foremen per ORC review.
Added " selected" to Rad / Chem Foremen per ORC review.
SECTION 5.2.3.12 Renumbered section.
SECTION 5.2.3.12 Renumbered section.
Corrected reference to another section.
Corrected reference to another section.
Typo corrected.
Typo corrected.
Added     "
Added Selected" to Rad / Chem Foremen per ORC review.
Selected" to Rad / Chem Foremen per ORC review.
10 Fp 4
10 Fp           4 -
3 4
3 4       ~
~
9     >y- t -
9
vr
>y-t vr


SECTION 5.2.3.13
SECTION 5.2.3.13 Renumbered section.
.                        Renumbered section.
Section 5.2.3.13, Rev. 5A position of Maintenance Coordinator was deleted with the addition of Operations and Maintenance Coordinator.
Section 5.2.3.13, Rev. 5A position of Maintenance Coordinator
                  .      was deleted with the addition of Operations and Maintenance Coordinator.
Corrected reference to another section.
Corrected reference to another section.
                                ~
Added Assistant Superintendent, Security to personnel list,
Added Assistant Superintendent, Security to personnel list, Due to a UE organizational change.
~
Due to a UE organizational change.
Deleted Security Training Supervisors, Security Administrative Supervisor, Security Training Instructor, and Off-Duty Shift
Deleted Security Training Supervisors, Security Administrative Supervisor, Security Training Instructor, and Off-Duty Shift
;                        - Security Supervisors and added " Selected Security Supervisory and Training Personnel", per ORC review.
- Security Supervisors and added " Selected Security Supervisory and Training Personnel", per ORC review.
                  - . . - SECTION S.2.3.14m.,
: 3. -
: 3. -                -                                  . x                           ..
-.. - SECTION S.2.3.14m.,
Complete section added due to the addition of this position, Chemistry Coordinator, per plant recommendations.
. x Complete section added due to the addition of this position, Chemistry Coordinator, per plant recommendations.
SECTION 5.2.3.15 Renumbered section.
SECTION 5.2.3.15 Renumbered section.
Deleted Chemistry and Radwaste from responcibilities of the
Deleted Chemistry and Radwaste from responcibilities of the engineers due to the addition of Chemistry. Coordinator and reassignment of responsibilities.
    .                  engineers due to the addition of Chemistry. Coordinator and reassignment of responsibilities.
Changed the list of personnel trained for TSC Engineers to
Changed the list of personnel trained for TSC Engineers to
                          " Selected Supervising Engineers" and " Selected Engineers", per ORC review. These two positions can include all individuals in the previous list.
" Selected Supervising Engineers" and " Selected Engineers", per ORC review.
SECTION 5.2.3.16 Renumbered section.                                                                                           ,
These two positions can include all individuals in the previous list.
                                        ~
SECTION 5.2.3.16 Renumbered section.
Added the list of personnel who can be trained for the position which was inadvertently left out of Revision SA.
Added the list of personnel who can be trained for the position
~
which was inadvertently left out of Revision SA.
SECTION 5.2.3.17 Renumbered section.
SECTION 5.2.3.17 Renumbered section.
Corrected reporting scheme due to the organizational change.
Corrected reporting scheme due to the organizational change.
Change the personnel list of individuals who can be trained for.                                              .
Change the personnel list of individuals who can be trained for.
this position due to the organizational changes and ORC review.
this position due to the organizational changes and ORC review.
11 1                     7     w     = y- me'- -
11 1
                                                                -"dev-   e-     me WP --r*. T'9M- ?- -'e d t' -Tf -~'* *PP-- -'-* -
7 w
=
y-me'-
-"dev-e-
me WP
--r*.
T'9M-
?-
-'e d
t'
-Tf
-~'*
*PP--
t
t
: p.          - _ . _ _ . . . . . _ ._  _ _ _ . . . _ . . . _ . _ _                .
 
p.
SECTION 5.2.3.18 Renumbered section.
SECTION 5.2.3.18 Renumbered section.
Added specific reference to-type of status boards to be maintained in the TSC.
Added specific reference to-type of status boards to be maintained in the TSC.
Changed the personnel list of individuals who can be trained to
Changed the personnel list of individuals who can be trained to
            " Selected Plant Personnel", per ORC review.
" Selected Plant Personnel", per ORC review.
SECTION 5.2.3.19
SECTION 5.2.3.19 Renumbered.section.
  ;        Renumbered.section.                                                   ,
Corrected reference to another section.
Corrected reference to another section.
Changed the personnel list of individuals who can be trained to
Changed the personnel list of individuals who can be trained to
  ,        " Selected Rad / Chem Technicians" and " Selected Rad / Chem
" Selected Rad / Chem Technicians" and " Selected Rad / Chem Foremen".
:        Foremen".             Deleted engineers from the liic, per ORC review.     ,
Deleted engineers from the liic, per ORC review.
  ;        SECTION 5.2.3.20 Renumbered section.
SECTION 5.2.3.20 Renumbered section.
Added the responsibility of providing clerical support.
Added the responsibility of providing clerical support.
4 SECTION 5.2.3.21                                           .
SECTION 5.2.3.21 4
x        Renumbered seccion.
Renumbered seccion.
Delineated responsibility of Chemistry activities because of the addition of the Chemistry Coordinator.
x Delineated responsibility of Chemistry activities because of the addition of the Chemistry Coordinator.
SECTION 5.2.3.22 Renumbered section.
SECTION 5.2.3.22 Renumbered section.
Corrected reference to another section.
Corrected reference to another section.
SECTION'5.2.3.23 i           Renumbered section.
SECTION'5.2.3.23 i
Renumbered section.
r-Added "with at least one" which was inadvertently left out of Revision SA.
r-Added "with at least one" which was inadvertently left out of Revision SA.
i SECTION 5.2.3.24 1
i SECTION 5.2.3.24 1
l           Renumb? red section.
l Renumb? red section.
l SECTION 5.2.3.25 Renumbered section.
l SECTION 5.2.3.25 Renumbered section.
      ~
~
12 l
12 l


i; 7-I SECTION 5.2.3.26                                                     .
i; 7-I SECTION 5.2.3.26 Renumbered section.
Renumbered section.
Indicated Security personnel will provide support to emergency teams.
Indicated Security personnel will provide support to emergency teams.
SECTION 5.2.3.27 This section was added to cover the responsibility of obtaining parts and supplies from the warehouse during emergencies.
SECTION 5.2.3.27 This section was added to cover the responsibility of obtaining parts and supplies from the warehouse during emergencies.
2                            SECTION 5.2.4 6
SECTION 5.2.4 2
Reworded for clarification.
6 Reworded for clarification.
Changed " Higher Classification" to specific Emergency Classifications of " Site or General Emergency".
Changed " Higher Classification" to specific Emergency Classifications of " Site or General Emergency".
d I                           Grammatical changes for clarification.
d I
Changed arrival time for individual arriving at the EOF from 3 to 4 hours to 90 minutes to reflect actual arrival time of the
Grammatical changes for clarification.
.                          Off-Site Liaison Coordinator.
Changed arrival time for individual arriving at the EOF from 3 to 4 hours to 90 minutes to reflect actual arrival time of the Off-Site Liaison Coordinator.
Deleted the word " additional" from one of the primary responsibilities.
Deleted the word " additional" from one of the primary responsibilities.
Grammatical change.
Grammatical change.
Line 302: Line 357:
SECTION 5.2.4.2 Typo correction.
SECTION 5.2.4.2 Typo correction.
Changed " Staff Health Physicists / Nuclear Scientists" to
Changed " Staff Health Physicists / Nuclear Scientists" to
                            " Selected Engineers and Health Physicists" to include Nuclear Engineers from the Corporate Office per ORC review.
" Selected Engineers and Health Physicists" to include Nuclear Engineers from the Corporate Office per ORC review.
13
13


j y-     - .        . . . _ . - _ . . -        ..
j y-SECTION 5.2.4.3 Deleted special items which the Administrative / Logistics Coordinator is not responsible for providing.
SECTION 5.2.4.3 Deleted special items which the Administrative / Logistics Coordinator is not responsible for providing.
Added provisions for providing clerical support.
Added provisions for providing clerical support.
Deleted references to field kitchen and trash disposal. If food is required, it will be catered and normal trash disposal is adequate.
Deleted references to field kitchen and trash disposal.
Removed responsibility of administrating payroll and expense
If food is required, it will be catered and normal trash disposal is adequate.
  ;            accounts from the Administrative / Logistics Coordinator's
Removed responsibility of administrating payroll and expense accounts from the Administrative / Logistics Coordinator's responsibility since he is not responsible for these.
  .            responsibility since he is not responsible for these.
Deleted references to responsibility Lor special transportation requirements.
Deleted references to responsibility Lor special transportation requirements.
,i             Typo corrections.
,i Typo corrections.
SECTION 5.2.4.4 Indicated that the QA Coordinator may not be part of the initial emergency response, but will be called when needed.
SECTION 5.2.4.4 Indicated that the QA Coordinator may not be part of the initial emergency response, but will be called when needed.
Changed the personnel who can be trained for this position to reflect changes in UE organization.
Changed the personnel who can be trained for this position to reflect changes in UE organization.
SECTION 5.2.4.5 Added UE for clarification.
SECTION 5.2.4.5 Added UE for clarification.
Deleted responsibilities which were redundant and not in the
Deleted responsibilities which were redundant and not in the
              -responsibility of the Technical Support Coordinator.
-responsibility of the Technical Support Coordinator.
g.
g.
I           Added the responsibility for coordinating the response of Federal Agencies per NRC request.
I Added the responsibility for coordinating the response of Federal Agencies per NRC request.
SECTION 5.2.4.6 I               Indicated that the Construction Coordinator may not be part of the initial emergency response but will be called when needed.
SECTION 5.2.4.6 I
Indicated that the Construction Coordinator may not be part of the initial emergency response but will be called when needed.
Deleted the responsibilities which were summarized in the previous paragraph to eliminate redundancy.
Deleted the responsibilities which were summarized in the previous paragraph to eliminate redundancy.
Eliminated Supervising Engineer, Nuclear Construction from personnel list due to organization change.
Eliminated Supervising Engineer, Nuclear Construction from personnel list due to organization change.
Line 328: Line 382:
14
14


u                                   -
u Deleted a responsibility which is a summary of other responsibilities.
Deleted a responsibility which is a summary of other responsibilities.
Added Selected Emergency Preparedness Personnel to increase the depth of this position per ORC review.
Added Selected Emergency Preparedness Personnel to increase the depth of this position per ORC review.
SECTION 5.2.4.9 Corrected reference to another section.
SECTION 5.2.4.9 Corrected reference to another section.
Changed.the list of-personnel to be trained for the position to
Changed.the list of-personnel to be trained for the position to
                " Selected Engineers and Health Physicists" to reflect the UE Corporate Organization.- Deleted Rad / Chem Foremen since they will not be responding as the Corporate Emergency Organization, per ORC review.
" Selected Engineers and Health Physicists" to reflect the UE Corporate Organization.- Deleted Rad / Chem Foremen since they will not be responding as the Corporate Emergency Organization, per ORC review.
SECTION 5.2.4.10 3               Added " Selected"-to " Rad / Chem Technicians" and " Rad / Chem. .
SECTION 5.2.4.10 3
Added " Selected"-to " Rad / Chem Technicians" and " Rad / Chem.
Foremen" per ORC review and deleted the word " Plant" since'it is unnecessary in this phrase.
Foremen" per ORC review and deleted the word " Plant" since'it is unnecessary in this phrase.
SECTION 5.2.4.11 Added " Selected" to " Staff Engineers".
SECTION 5.2.4.11 Added " Selected" to " Staff Engineers".
Line 341: Line 395:
Moved reference to Appendix C to Section 5.3.1.
Moved reference to Appendix C to Section 5.3.1.
SECTION 5.3.1
SECTION 5.3.1
                .Added reference to Appendix C.
.Added reference to Appendix C.
SECTION 5.3.2 Added text to eliminate TBD.
SECTION 5.3.2 Added text to eliminate TBD.
SECTION 5.3.3 and 5.3.4 Sections were rewritten to indicate current methodology.
SECTION 5.3.3 and 5.3.4 Sections were rewritten to indicate current methodology.
Line 349: Line 403:
SECTION 5.4.1 Increased the discussion of Federal response direction and coordination, per NRC request.
SECTION 5.4.1 Increased the discussion of Federal response direction and coordination, per NRC request.
SECTION 5.4.1.2 Added reference to Oak Ridge National Laboratory, to reflect the recent agreement with them.
SECTION 5.4.1.2 Added reference to Oak Ridge National Laboratory, to reflect the recent agreement with them.
SECTION 5.4.1.4                                                   1
SECTION 5.4.1.4 1
    $        Changed the notification of the Coast Guard to the current methodology.
Changed the notification of the Coast Guard to the current methodology.
SECTION 5.4.1.5 and 5.4.1.6 New sections added to indicate FAA and NWS support, per NRC 7-       request.
SECTION 5.4.1.5 and 5.4.1.6 New sections added to indicate FAA and NWS support, per NRC 7-request.
y i
y i
SECTION 5.4.2.1 Eliminate generic reference to procedures and the Missouri Nuclear Accident Plan.
SECTION 5.4.2.1 Eliminate generic reference to procedures and the Missouri Nuclear Accident Plan.
."            Deleted " facilities" as it was misused in sentence.
Deleted " facilities" as it was misused in sentence.
.y SECTION 5.4.3 4         Clarifi~ cation of responsibility of off-site emergency planning.
. ".y SECTION 5.4.3 4
Clarifi~ cation of responsibility of off-site emergency planning.
Added a statement to clarify the coordination of off-site activities.
Added a statement to clarify the coordination of off-site activities.
Corrected the response time of the local authorities.
Corrected the response time of the local authorities.
Line 363: Line 418:
Title of Callaway Memorial Hospital was corrected.
Title of Callaway Memorial Hospital was corrected.
TABLE 5-1
TABLE 5-1
              " Required Response Time" was changed to " Response Goal" per NRC recommendation.
" Required Response Time" was changed to " Response Goal" per NRC recommendation.
16
16


Line 371: Line 426:
Added Response Goal of 2 hours for the Corporate Emergency Organization.
Added Response Goal of 2 hours for the Corporate Emergency Organization.
Added "As Needed" for the response level for the Construction and QA Coordinators, since they may not be needed for the initial response of the Corporate Emergency Organization.
Added "As Needed" for the response level for the Construction and QA Coordinators, since they may not be needed for the initial response of the Corporate Emergency Organization.
.;        Added Response Goal of 60-75 minutes at the Alert.for the Public Information Coordinator.
Added Response Goal of 60-75 minutes at the Alert.for the Public Information Coordinator.
FIGURE 5-1 This Figure was modified to reflect the changes in the Plant Organization. The addition of Assista'nt Manager Material Management and the addition of another Superintendent Administration, to split Administration into two section of Records and Services, is reflected in this change.
FIGURE 5-1 This Figure was modified to reflect the changes in the Plant Organization.
'"~
The addition of Assista'nt Manager Material Management and the addition of another Superintendent Administration, to split Administration into two section of Records and Services, is reflected in this change.
'"~
FIGURE 5-2 The position of Principle Health Physicist was deleted.
FIGURE 5-2 The position of Principle Health Physicist was deleted.
FIGURE 5-5 This Figure was modified to indicate the changes in the On-Site Emergency Organization. 'This includes the addition of the Operations and Maintenance Coordinator, Chemistrv Coordinator and the deletion of the Maintenance coordinator FIGURE S-6 "As Needed" was added to the Construction and QA Coordinators.         +
FIGURE 5-5 This Figure was modified to indicate the changes in the On-Site Emergency Organization. 'This includes the addition of the Operations and Maintenance Coordinator, Chemistrv Coordinator and the deletion of the Maintenance coordinator FIGURE S-6 "As Needed" was added to the Construction and QA Coordinators.
+
FIGURE 5-7 This Figure was modified to reflect the changes in the On-Site Emergency. Organization.
FIGURE 5-7 This Figure was modified to reflect the changes in the On-Site Emergency. Organization.
I         FIGURE 5-9 r          A verification call was added between Callaway County /Fulton to i         the Control Room to reflect current methodology.
I FIGURE 5-9 A verification call was added between Callaway County /Fulton to r
i the Control Room to reflect current methodology.
17
17


  -v N
-v N
Q!..
Q!.
CHAPTER 6                                                           .
CHAPTER 6 PAGE 6-1 Grammatical corrections.
PAGE 6-1     Grammatical corrections.
SECTION 6.1 n.
  ;      SECTION 6.1 n.
Spelling and grammatical corrections.
Spelling and grammatical corrections.
Deleted generic reference to assessment time which is discussed in Chapter 4.
Deleted generic reference to assessment time which is discussed in Chapter 4.
SECTION 6.2 7       Grammatical corrections.
SECTION 6.2 7
Grammatical corrections.
5 Added "to escalate or" to the items to take into account for making a judgemental decision.
5 Added "to escalate or" to the items to take into account for making a judgemental decision.
SECTION 6.3 Changed "will" to "shall" per NRC recommendation.
SECTION 6.3 Changed "will" to "shall" per NRC recommendation.
Line 401: Line 459:
Deleted the reference to the thirty minute verification call from the State to have consistent wording for all 18
Deleted the reference to the thirty minute verification call from the State to have consistent wording for all 18


                                                                                                                                                                          ^ ~-
^
~-
4 w.
4 w.
notifications.             The specific details are in the implementing
notifications.
* procedures.
The specific details are in the implementing procedures.
Added a reference to'a Figure and additional information about notification and verification with the State for clarification.
Added a reference to'a Figure and additional information about notification and verification with the State for clarification.
SECTION 6.3.3 Renumbered section was Section 6.3.2 in Rev. SA.
SECTION 6.3.3 Renumbered section was Section 6.3.2 in Rev. SA.
Corrected.the reference on who would be notified. Changed Public Information Coordinator to UE Public Relations.
Corrected.the reference on who would be notified.
Changed Public Information Coordinator to UE Public Relations.
SECTION 6.3.4 Section 6.3.4 in Rev. 5A was changed to Section 6.3.5 in Rev.
SECTION 6.3.4 Section 6.3.4 in Rev. 5A was changed to Section 6.3.5 in Rev.
                            ~ 6.
~ 6.
S                       Added the' entire section to include notifications to the Union
S Added the' entire section to include notifications to the Union Electric Corporate Office since they will be notified of
    +                        Electric Corporate Office since they will be notified of emergencies at the Callaway Plant.
+
emergencies at the Callaway Plant.
SECTION 6.3.5
SECTION 6.3.5
                            ' Renumbered section.
' Renumbered section.
Corrected the title of the Communicator making notifications.
Corrected the title of the Communicator making notifications.
SECTION~6.4 n
SECTION~6.4 n
Added the factor, for the situation to escalate, to consider when mobilizing emergency organizations.
Added the factor, for the situation to escalate, to consider when mobilizing emergency organizations.
Changed response-times to response goals per NRC recommendations and corrected the time in the first group                                                               .
Changed response-times to response goals per NRC recommendations and corrected the time in the first group Deleted " designated" in front of Emergency Coordinator since the Emergency. Coordinator is a specific position.
Deleted " designated" in front of Emergency Coordinator since the Emergency. Coordinator is a specific position.
Changed the' response goal of the Corporate Emergency Organization to approximately-2 hours and corrected a typo.
Changed the' response goal of the Corporate Emergency Organization to approximately-2 hours and corrected a typo.
                            ~SECTION 6.4.2 Grammatical correction.
~SECTION 6.4.2 Grammatical correction.
Deleted generic reference to procedures.
Deleted generic reference to procedures.
f SECTION 6.4.3
f SECTION 6.4.3
      ?"                     Typo corrected.
?"
Typo corrected.
Deleted generic reference to procedures.
Deleted generic reference to procedures.
                                                                                  . 19
. 19
          ~
~
  $              $' 4' y-       iv=y v c+ vp - vcwgr --  *- g--a   ya y- y .e w. r -we +P4y*--*qu =-v+my-'we ms wee a-W- c-WeWy--*+q q +w+-+e"W-   + m-4 Nwn ,. w+ v,
4' y-iv=y v
c+
vp -
vcwgr g--a ya y-y
.e w.
r -we
+P4y*--*qu
=-v+my-'we ms wee a-W-c-WeWy--*+q q
+w+-+e"W-
+
m-4 Nwn w+ v,


Corrected the methodology in initiating the call-out of the
Corrected the methodology in initiating the call-out of the Corporate Emergency Organization.
* Corporate Emergency Organization.
SECTION 6.5 Specified " Emergency Action Levels" in place of " levels".
SECTION 6.5 Specified " Emergency Action Levels" in place of " levels".
Typo corrected.
Typo corrected.
Line 437: Line 507:
Terminology correction.
Terminology correction.
Typo correction.
Typo correction.
I   SECTION 6.5.2
I SECTION 6.5.2 Added the initial assessment would be based on Plant and meteorological parameters and would be verified by Field Monitoring Teams.
  ;    Added the initial assessment would be based on Plant and meteorological parameters and would be verified by Field Monitoring Teams. Also included a reference to the number of teams which can be formed. Per NRC recommendations.
Also included a reference to the number of teams which can be formed.
SECTION 6.5.2.1 This section was rewritten to elaborate on the methodology and capabilities of the Dose Assessment activities. This was done to satisfy Section I of NUREG-0654 per NRC recommendations.
Per NRC recommendations.
SECTION 6.5.2.1 This section was rewritten to elaborate on the methodology and capabilities of the Dose Assessment activities.
This was done to satisfy Section I of NUREG-0654 per NRC recommendations.
SECTION 6.5.2.3 Corrected the references to Emergency Teams.
SECTION 6.5.2.3 Corrected the references to Emergency Teams.
l Clarified the priority activities in regard to posting of areas l'
l Clarified the priority activities in regard to posting of areas l'
based upon radiological conditions.
based upon radiological conditions.
f Deleted a reference as to when the TSC is activated since it is
Deleted a reference as to when the TSC is activated since it is f
!      inappropriate in this sentence. It is previously discussed.
inappropriate in this sentence.
l i
It is previously discussed.
SECTION 6.5.4 L     Grammatical correction.
l SECTION 6.5.4 i
i     SECTION 6.6 l
L Grammatical correction.
i SECTION 6.6 l
Typos corrected.
Typos corrected.
20
20


                              -              .      --      ,~
,~
SECTION 6.7 Indicated protective actions can be initiated based upon projected radiation levels per NRC recommendations.
SECTION 6.7 Indicated protective actions can be initiated based upon projected radiation levels per NRC recommendations.
Clarified the reference to another section and deleted a             ,
Clarified the reference to another section and deleted a generic reference to the Missouri Nuclear Accident Plan.
generic reference to the Missouri Nuclear Accident Plan.
Clarified the decision to make protective action recommendation process per NRC recommendations.
Clarified the decision to make protective action recommendation process per NRC recommendations.                                     ;
SECTION 6.7.1.1 Corrected the alerting sequence for on-site personnel and the related terminology.
SECTION 6.7.1.1 Corrected the alerting sequence for on-site personnel and the related terminology.
                    .The Construction personnel will be knowledgeable of the required actions to be taken when alerted was restated for 9                 correction and clarification.
.The Construction personnel will be knowledgeable of the required actions to be taken when alerted was restated for
,,.9 correction and clarification.
SECTION 6.7.1.2 Changed the required area for accountability from the Protected Area to the Owner Controlled Area per NRC recommendation.
SECTION 6.7.1.2 Changed the required area for accountability from the Protected Area to the Owner Controlled Area per NRC recommendation.
Added additional information on the methodology for-accountability.
Added additional information on the methodology for-accountability.
Portions of the second paragraphs was dele.ted and was combined in the third paragraph in Rev. 5A to make one paragraph in Rev.
Portions of the second paragraphs was dele.ted and was combined in the third paragraph in Rev. 5A to make one paragraph in Rev.
: 6. This was done to better describe the methodology for accountability and to delete references to the Training Center as an assembly point. The time requirements were better described and changed to a goal per NRC recommendations.
6.
  ~
This was done to better describe the methodology for accountability and to delete references to the Training Center as an assembly point.
The time requirements were better described and changed to a goal per NRC recommendations.
~
Additional information was added to clarify construction activities for accountability.
Additional information was added to clarify construction activities for accountability.
                    .Information concerning visitors was corrected to reflect UE policy.
.Information concerning visitors was corrected to reflect UE policy.
SECTION 6.7.1.3 The Security Coordinator was added as he is responsible for accountability and access control.
SECTION 6.7.1.3 The Security Coordinator was added as he is responsible for accountability and access control.
                    .A paragraph was added to clarify who is authorized to pass Accass Control _ Points established by the Sheriff's Department, per NRC request.
.A paragraph was added to clarify who is authorized to pass Accass Control _ Points established by the Sheriff's Department, per NRC request.
SECTION 6.7.1_4 A reference was added to the decontamination facility in the
SECTION 6.7.1_4 A reference was added to the decontamination facility in the EOF, per NRC recommendation.
  .                  EOF, per NRC recommendation.
21
21


Line 474: Line 548:
E References to visitors and contract personnel were deleted from the second paragraph as they are discussed in the first.
E References to visitors and contract personnel were deleted from the second paragraph as they are discussed in the first.
A reference was added to the Health Physics Access Control Area for clarification.
A reference was added to the Health Physics Access Control Area for clarification.
SECTION 6.7.1.5
SECTION 6.7.1.5 The third and fourth paragraphs from Rev. SA were combined and rewritten to explain the methodology for evacuation.
:-      The third and fourth paragraphs from Rev. SA were combined and rewritten to explain the methodology for evacuation. This was done due to the deletion of the Training Center as an assembly area and to be consistent with Section 6.7.1.2.
This was done due to the deletion of the Training Center as an assembly area and to be consistent with Section 6.7.1.2.
SECTION 6.7.2
SECTION 6.7.2
.h Deleted generic references to procedures.
.h Deleted generic references to procedures.
SECTION 6.7.2.1 Grammatical correction.
SECTION 6.7.2.1 Grammatical correction.
Clarifications were made on who is responsible for implementing Protective Actions in each of the Counties.
Clarifications were made on who is responsible for implementing Protective Actions in each of the Counties.
Line 484: Line 558:
(See Appendix I)
(See Appendix I)
SECTION 6.7.2.2 There were typographical and grammatical corrections.
SECTION 6.7.2.2 There were typographical and grammatical corrections.
l           The State point for the reporting of Protective Action l
l The State point for the reporting of Protective Action l
Reccmmendations was changed from BRH to SEMA to reflect the j
Reccmmendations was changed from BRH to SEMA to reflect the j
correct reporting methodology.
correct reporting methodology.
The use of the RRIS and PASS was revised to reflect correct terminology and to show the correct methodology for using input from the systems to form protective action recommendations.
The use of the RRIS and PASS was revised to reflect correct terminology and to show the correct methodology for using input from the systems to form protective action recommendations.
;          A sentence was added to reference that recommendation can be made within 15 minutes for a General Emergency, per NRC request.
A sentence was added to reference that recommendation can be made within 15 minutes for a General Emergency, per NRC request.
'          An inappropriate reference to the Public Information Plan was deleted.
An inappropriate reference to the Public Information Plan was deleted.
.                                          22
22


The description of the methodology for public notification and evacuation was expanded and corrected.
The description of the methodology for public notification and evacuation was expanded and corrected.
Line 496: Line 570:
SECTION 6.7.3.2 Wording was added that protective clothing will be available as replacement clothing, per NRC request.
SECTION 6.7.3.2 Wording was added that protective clothing will be available as replacement clothing, per NRC request.
SECTION 6.7.3.3
SECTION 6.7.3.3
      " Emergency centers" was changed to "on-site emergency centers".
" Emergency centers" was changed to "on-site emergency centers".
SECTION 6.7.3.4                                                   l t     This section was revised to reflect that Potassiun lodide will be stocked and made available to emergency workers.
SECTION 6.7.3.4 t
This section was revised to reflect that Potassiun lodide will be stocked and made available to emergency workers.
SECTION 6.7.4.1
SECTION 6.7.4.1
      " Health Physics procedures" was changed to " Health Physics Operating Manual".
" Health Physics procedures" was changed to " Health Physics Operating Manual".
The section was revised to reflect the current contamination control methodology.
The section was revised to reflect the current contamination control methodology.
1 SECTION 6.7.4.2
SECTION 6.7.4.2
      " Exclusion Area Boundary" was corrected to " owner controlled   l area".
" Exclusion Area Boundary" was corrected to " owner controlled area".
      " State monitoring teams" was changed to " Field Monitoring Teams".
" State monitoring teams" was changed to " Field Monitoring Teams".
The reference to the State of Missouri Nuclear Accident Plan was changed to Table 6-5.
The reference to the State of Missouri Nuclear Accident Plan was changed to Table 6-5.
SECTION 6.8.1 A reference was added to the Health Physics Department for clarification.
SECTION 6.8.1 A reference was added to the Health Physics Department for clarification.
Line 511: Line 586:
23
23


scription of the methodology for public notification and         '
scription of the methodology for public notification and tion was expanded and corrected.
tion was expanded and corrected.
orgency Coordinator was added as having the
orgency Coordinator was added as having the
  .cibility to ensure off-site authorities are updated upon ncy reclassification.
.cibility to ensure off-site authorities are updated upon ncy reclassification.
N 6.7.3.2 g wa's added that protective clothing will be available as cment clothing, per NRC request.
N 6.7.3.2 g wa's added that protective clothing will be available as cment clothing, per NRC request.
N 6.7.3.3 oncy centers" was changed to "on-site emergency centers".
N 6.7.3.3 oncy centers" was changed to "on-site emergency centers".
Line 520: Line 594:
N 6.7.4.1 h Physics procedures" was changed to " Health Physics ing Manual".
N 6.7.4.1 h Physics procedures" was changed to " Health Physics ing Manual".
ction was revised to reflect the current contamination jl methodology.
ction was revised to reflect the current contamination jl methodology.
N 6.7.4.2 lsion Area Boundary" was corrected to " owner controlled L           .
N 6.7.4.2 lsion Area Boundary" was corrected to " owner controlled L
monitoring teams" was changed to " Field Monitoring lforence to the State of Missouri Nuclear Accident Plan anged to Table 6-5.
monitoring teams" was changed to " Field Monitoring lforence to the State of Missouri Nuclear Accident Plan anged to Table 6-5.
l'N 6.8.1 rence was added to the Health Physics Department for
l'N 6.8.1 rence was added to the Health Physics Department for
  'ication.
'ication.
    =le sn* *acA4nn nnnvoe inn chambore wa .c cl a ri fi ed ner NRC
=le sn* *acA4nn nnnvoe inn chambore wa.c cl a ri fi ed ner NRC


I2                         ,
I2 2.,:....
2 .,:......
.g
.g                                                                         .                  .
'Y
'Y Reference to exposure limits for State add 51'ocal' agencies was
,y.
,y.                                                                                                              .;
Reference to exposure limits for State add 51'ocal' agencies was added for clarification, per NRC recommendatijn.
added for clarification, per NRC recommendatijn.
?.,y
  ?.,y                                                                                 ..
' f2 SECTION.6.8.2
' f2                   SECTION.6.8.2                                                         _q h
_q h
  ~
...., =,..
                                          ~.
.. w.
                                                                          ....,=,..
~.
                                                                                            . . w.
~


==Reference:==
==Reference:==
was added to " multi media"; trained / personnel being
was added to " multi media"; trained / personnel being
                                                                                        ~~~
:r]i j 'j available - on-shif t, per NRC request.:
:r]i j 'j
~ ~ ~
'g available - on-shif t, per NRC request.:
'g 4
4                   Th'ere were grammatical corrections.
Th'ere were grammatical corrections.
ft                   Per NRC. request, a-reference to radiciodine skin contamination f                   was e.Jded.
ft Per NRC. request, a-reference to radiciodine skin contamination f
a
was e.Jded.
  @                    Search and-Rescue Teams was-specified4 or,. emergency teams.                          . .  .
a Search and-Rescue Teams was-specified4 or,. emergency teams.
S                                                                             -
S
SECTION 6.8.3
{
{
A                   The Callaway Plant vehicle description was clarified to show g" . . .#
SECTION 6.8.3 A
                  -- .a.t.ha. t .ite. wa,'s,<.,no t an ambulance .                                  . , .
The Callaway Plant vehicle description was clarified to show g"...#
--.a.t.ha. t.ite. wa,'s,<.,no t an ambulance.
_7.
_7.
There'was a reference change.
There'was a reference change.
j                   SECTION 6.9 There were grammatical corrections.
j SECTION 6.9 There were grammatical corrections.
SECTION 6.9.1 The section was reworded to elaborate~ on   -
SECTION 6.9.1 The section was reworded to elaborate on the information
the information
" booklet".
                        " booklet".
~ --
. r.                                                                              .
. r.
Generic references to the Public Information Plan and the Missouri Nuclear Accident Plan were. deleted.
Generic references to the Public Information Plan and the Missouri Nuclear Accident Plan were. deleted.
}
SECTION 6.9.2.
SECTION 6.9.2.
    }
There was a grammatical correction.
There was a grammatical correction.
A generic reference to procedures was deleted.
A generic reference to procedures was deleted.
Line 570: Line 644:
24
24


5                                                                                       - ~ r. 3.
5
[x 6-
- ~ r.
                                                                                                  .~ : -
3.
u TABLE 6-2 et                                                                                         . ..
[x 6-u.~ : -
The references to the source document were added to the table,
TABLE 6-2 et The references to the source document were added to the table,
} );       per NRC recommendation,     -
} );
ty   -
per NRC recommendation, ty Fl TABLE 6-3
Fl     TABLE 6-3
:f if A reference to the source document was added to the table, per NRC recommendation.
:f if       A reference to the source document was added to the table, per
?
-@        NRC recommendation.
k, TABLE 6-4.
    ?
;0 A reference to the source _ document was added to.the; table,.per T
k,     TABLE 6-4.
NRC recommendation.
;0       A reference to the source _ document was added to.the; table,.per T       NRC recommendation.                                                           >
TABLE 6-5 s y References were corrected.
TABLE 6-5 s y                                                                             *
I$
    ;    References were corrected.                                               ..
:42;.M.'"T'17 %Q'V;T%?Vi'!afll'w!?N@tm;WLW.7L*:$32','T:~!!i?.=
:42;.M.'"T'17 %Q'V;T%?Vi'!afll'w!?N@tm;WLW.7L*:$32','T:~!!i? .=
TABLE 6-7 e
I$e        TABLE 6-7 e     Table 6-7 of Rev. 5A was deleted.
Table 6-7 of Rev. 5A was deleted.
s
e s
  -      FIGURE 6-1 The Figure was revised to reflect the new Notification Form as agreed upon by SEMA.
FIGURE 6-1 The Figure was revised to reflect the new Notification Form as agreed upon by SEMA.
t L       FIGURE 6-2                                                     .
L FIGURE 6-2
.i4
.i4 t
  ?      The Figure was revised to reflect the new Follow-up
The Figure was revised to reflect the new Follow-up
* Notification Form as agreed upon by SEMA.
?
Notification Form as agreed upon by SEMA.
1 s
1 s
e 25
e 25


  , yw.
, yw.
n
n
.<M
.<M i
* k+                           ,      u                                                 _        , . , . .          .      i CHAPTER 7
k+
:xM                                                                                                                            -
u M
;(v-
CHAPTER 7
!                    SECTION 7.1.1 j{                         . y.e .
:x
. *c                 The numbercof-SPDS terminals in the Control. Room was changed                                           .
;(v-SECTION 7.1.1 j{
:L                   from two<to'one to reflect the correct number of terminals to                                         ;  j ik                     be installed.                                                                                           i L,_.                 c                                                                             j if i
. y.e.
i$                     The' PASS " terminal" was changed to " disp' lay" to reflect the
. *c The numbercof-SPDS terminals in the Control. Room was changed j
;g'                   correct PASS configuration.
:L from two<to'one to reflect the correct number of terminals to ik be installed.
,g                     The reference to dedicated telephone links and the radio
ij if L,_.
;g                                                                                                                            1 lg            -    -console was changed to reflect the correct. Rev. _6 refer.ence?.-                        _.
i c
e                                                                        ,; . -
i$
it -
The' PASS " terminal" was changed to " disp' lay" to reflect the
f(X.                  SECTION.7.1.2-                                                                                           3
;g' correct PASS configuration.
!'+-                  Made grammatical corrections and reworded to reflect on-site _
,g
. .g                   orientation of TSC activities.                                             ,                             _
;g The reference to dedicated telephone links and the radio lg
\ pghmiW@M.cM '                                                       - M mw - ~. . a..  -mk:L Re erence' iwas    %:2   s'* W to 32f::r.m :~=~ copies o~f'documen%'ts controlled"                          to show:.tsd,%6:y:ge&
-console was changed to reflect the correct. Rev. _6 refer.ence?.-
=3                                         added                                                                                 ,
1 it -
:      .            'that the documents are maintained on a current basis, per NRCz                                           ,
e f(
recommendation.
SECTION.7.1.2-3 X.
fg-                   SECTION 7.1.3                                                         ,
Made grammatical corrections and reworded to reflect on-site _
,E
!'+-
;                      The word " portable" was added to the radiological monitoring equipment.
..g orientation of TSC activities.
The reference to OSC communications capabilities was changed 41f-                  from 7'2.2.4 to the correct Rev. 6 reference of 7.2.3.4.
controlled" copies o~f'documen%'ts to show:.tsd,%6:y:ge&
Il r& '                   A paragraph was added to discuss OSC habitability and monitoring equipment.
\\ pghmiW@M.cM '
g f                 SECTION 7.1.4 The specific location of the backup EOF was deleted due to the l}                     fact that the facility is under' negotiation.
' i % : 2 s'* W 32f::r.m :~=~
l4 Wording was added to radiological and environmental assessment
- M mw - ~.. a.. -mk:L
!                      to reflect the "off-site" orientation.
=3 Re erence was added to
SECTION 7.1.5 l                     The " EOF Organization" was corrected to the " Corporate Emergency. Organization in the EOF".
'that the documents are maintained on a current basis, per NRCz recommendation.
fg-SECTION 7.1.3
,E The word " portable" was added to the radiological monitoring equipment.
l f-The reference to OSC communications capabilities was changed 41 from 7'2.2.4 to the correct Rev. 6 reference of 7.2.3.4.
Il r& '
A paragraph was added to discuss OSC habitability and g
monitoring equipment.
f SECTION 7.1.4 The specific location of the backup EOF was deleted due to the
..l}
fact that the facility is under' negotiation.
Wording was added to radiological and environmental assessment l4 to reflect the "off-site" orientation.
SECTION 7.1.5 l
The " EOF Organization" was corrected to the " Corporate Emergency. Organization in the EOF".
L SECTION 7.1.6
L SECTION 7.1.6
                      ~The specific location of the JPIC was deleted due to the fact that the location is under negotiation.
~The specific location of the JPIC was deleted due to the fact that the location is under negotiation.
1 i
1 i
26
26


  'u       .
'u pm
pm                                                 >
:4 SECTION 7.1.8
:4 9                -    SECTION 7.1.8                                                                                               ,
'9 s
sr The location of the State EOC was clarified.
The location of the State EOC was clarified.
3;                       .
r 3;
I                     SECTION 7.2.1-                                                                               -
I SECTION 7.2.1-c.
: c.                              ..
p
p                       " Plant Workers" was deleted as it is redundant to " emergency
" Plant Workers" was deleted as it is redundant to " emergency
    ;i                   -teams".
;i
SECTION 7.2. .' l i
-teams".
b                       " Multi-tune" was corrected to " Multi-tone".
SECTION 7.2.
h-                     SECTION:-7.2'.2 S
.' l i
E                                     -
b
T                       To eliminate redundancy, reference to the " Kingdom Telephone i                       Company" was deleted as it is the " local public telephone
" Multi-tune" was corrected to " Multi-tone".
: t.        . . _ .
h-S SECTION:-7.2'.2 E
company".                                                                                      .
T To eliminate redundancy, reference to the " Kingdom Telephone i
  . f 33 "                               * .a rt_~ r #; gp ;g;&+x.
Company" was deleted as it is the " local public telephone t.
                                ^
company".
                                                                    - --~c- ' ~ -     ---      -              -
. f 33 "
                                                                                                                      . sq:: .4 SECTION - 7. 2 '.13 This section was added to clarify the dedicated communications systems.
SECTION - 7. 2 '.1 rt_~ r #; gp ;g;&+x.
SECTION 7.2.3.1 e                      This section was renumbered to reflect the new numbering
^
  .-                    sequence (Rev. 6).
*.a
5                       The reference to " Channel 2" was corrected to " plant channel 1".
- --~c- ' ~ -
3
. sq::.4 This section was added to clarify the dedicated communications systems.
SECTION 7.2.3.1 This section was renumbered to reflect the new numbering e
sequence (Rev. 6).
5 The reference to " Channel 2" was corrected to " plant channel 1".
SECTION 7.2.3.2
SECTION 7.2.3.2
[                     The~section was renumbered to reflect the new numbering 1                       sequence (Rev. 6). The reference to " Telephone" was corrected to "line". The reference to " channel 5" was corrected to
[
                          " plant channel 2".
The~section was renumbered to reflect the new numbering 1
SECTION 7.2.3.3 The section was renumbered to reflect the new numbering
                        ~
sequence (Rev. 6).
sequence (Rev. 6).
r The reference to " channel 5" was corrected to " plant channel 2".                                          .
The reference to " Telephone" was corrected to "line".
The reference to " channel 5" was corrected to
" plant channel 2".
SECTION 7.2.3.3 The section was renumbered to reflect the new numbering sequence (Rev. 6).
~
r The reference to " channel 5" was corrected to " plant channel 2".
SECTION 7.2.3.4 i
SECTION 7.2.3.4 i
The section was renumbered to reflect the new numbering sequence (Rev. 6).
The section was renumbered to reflect the new numbering sequence (Rev. 6).
There was a grammatical correction.
There was a grammatical correction.
,                                                                  27
27


?
?
:4 References were corrected t'o reflect the correct titles.of
:4 References were corrected t'o reflect the correct titles.of
                " Operations and Maintenance Coordinator" and " Operational
" Operations and Maintenance Coordinator" and " Operational Support Center Coordinator".
* Support Center Coordinator".
SELTION 7.2.3.5 6
SELTION 7.2.3.5         ,
The section was renumbered to reflect the new numbering sequence -(Rev. 6).
6 The section was renumbered to reflect the new numbering
.,            sequence -(Rev. 6) .
There was a grammatical correction.
There was a grammatical correction.
1             The reference to " channel 2" was corrected to " plant channel E       _    .1 "
1 The reference to " channel 2" was corrected to " plant channel E
s                           -
.1 "
SECTION 7.2.4
s SECTION 7.2.4 The section was renumbered to reflect the new numbering sequence.(Rev. 6).
-              The section was renumbered to reflect the new numbering sequence.(Rev. 6).
h.'"Trf W!rxnw #?.?;cM5fmacerW' gr,*ammati' cal corrections.
                                                              . s.v.mep- ~~ -.m   m , _ -r. n..m h.'"Trf W!rxnwT'here
q97-rmyp.ex&
                #?.?;cM5fmacerW' q97-rmyp.ex&
. s.v.mep- ~~
were~some gr,*ammati' cal corrections.
-.m m, _ -r. n..m T'here were~some
                                                                                          ''~<
' ' ~ <
* i             Additional listing of locations for unlisted numbers was added to indicate current locations, per NRC request.
i Additional listing of locations for unlisted numbers was added to indicate current locations, per NRC request.
SECTION 7.2.5 The section was renumbered to reflect the new numbering
SECTION 7.2.5 The section was renumbered to reflect the new numbering
                    ~
~
sequence (Rev. 6).
sequence (Rev. 6).
9             The reference to "Six telephones" was changed to " Telephones"
9 The reference to "Six telephones" was changed to " Telephones" to allow for flexibility in telephone allocation.
'              to allow for flexibility in telephone allocation.
SECTION 7.2.6-The section was renumbered to reflect the new numbering sequence (Rev. 6).
SECTION 7.2.6-The section was renumbered to reflect the new numbering sequence (Rev. 6).
The reference to "Six telephones" was changed to " Telephones" to allow for flexibility in telephone allocation.
The reference to "Six telephones" was changed to " Telephones" to allow for flexibility in telephone allocation.
Line 694: Line 786:
SECTION 7.2.6.1 The section was renumbered to reflect the new numbering sequence (Rev. 6).
SECTION 7.2.6.1 The section was renumbered to reflect the new numbering sequence (Rev. 6).
SECTION 7.2.7 This section was renumbered to reflect the new numbering sequence (Rev. 6).
SECTION 7.2.7 This section was renumbered to reflect the new numbering sequence (Rev. 6).
28
28 G


  ~                                                                               .,      ,
~
                  'SECTION 7.2.7.1                                                           .
'SECTION 7.2.7.1 This section was renumbered to reflect the new numbering sequence (Rev.-6).
This section was renumbered to reflect the new numbering sequence (Rev.-6).
There was a grammatical correction.
There was a grammatical correction.
y-SECTION 7.2.7.2                                                           i This section was renumbered to reflect the new numbering sequence (Rev. 6).
SECTION 7.2.7.2 y-i This section was renumbered to reflect the new numbering sequence (Rev. 6).
2-               There was a grammatical correction..                           ._      _
2 -
There was a grammatical correction..
The channels were revised to reflect the correct designations.
The channels were revised to reflect the correct designations.
SECTION 7.2.7.3 byn % - ;The3section yasxren,umbekednto$ reflect.sthe4new numbering sequence (Rev. 6).
SECTION 7.2.7.3 byn % - ;The3section yasxren,umbekednto$ reflect.sthe4new numbering sequence (Rev. 6).
Line 707: Line 799:
SECTION 7.2.8 The section was. renumbered to reflect the new numbering sequence (Rev. 6).
SECTION 7.2.8 The section was. renumbered to reflect the new numbering sequence (Rev. 6).
SECTION 7.2.9 1
SECTION 7.2.9 1
e                The section was renumbered to reflect the new numbering sequence (Rev. 6).
The section was renumbered to reflect the new numbering e
sequence (Rev. 6).
4
4
  }                 SECTION 7.2.9.1 The section was renumbered to reflect the new numbering sequence (Rev.'6).
}
SECTION 7.2.9.2                                                       ,
SECTION 7.2.9.1 The section was renumbered to reflect the new numbering sequence (Rev.'6).
The section was renumbered to reflect the new numbering
SECTION 7.2.9.2 The section was renumbered to reflect the new numbering
                  . sequence (Rev. 6).
. sequence (Rev. 6).
Reference was added that the HPN is installed on FTS.
Reference was added that the HPN is installed on FTS.
SECTION 7.3.1.1 This section was revised to reflect the correct Meteorological System locations, parameters, and inspection methodology.
SECTION 7.3.1.1 This section was revised to reflect the correct Meteorological System locations, parameters, and inspection methodology.
Line 718: Line 811:
29
29


                                                                .-      -._ -..        _~.~.-
_~.~.-
                                                                                                      'l 9-          .
'l
                                                                                                      'l k
'l 9-ke i
e i
SECTION 7.3.1.2.1 mg 7
SECTION 7.3.1.2.1                                                           ''
There were grammatical and typographical corrections.
mg 7                   There were grammatical and typographical corrections.
L SECTION'7.3.1.2.2 r
L
}e The section was revised to reflect the correct Area Radiation i
  .$                  SECTION'7.3.1.2.2 r
Monitoring System functions and capabilities.
    }e                 The section was revised to reflect the correct Area Radiation                 .
i                  Monitoring System functions and capabilities.                             -
j
j
                      'SECTION 7.3.1.3.2                                                                l
((
((
1 M                   The section was revised to reflect the correct air sample G.                 analysis capabilities.                                      .
'SECTION 7.3.1.3.2 M
Il-                 SECTION 7.3.1.4                                                                   1 Y                                                                                                     \
The section was revised to reflect the correct air sample G.
2                   This section was revised to reflect the-correct personnel monitoring capabilities and methodology.
analysis capabilities.
                                      --, . . ~ <- .
1 Il-SECTION 7.3.1.4 Y
me; w nm 1 n:         p..~.
\\
                      ~ Word'ihg w'as~a~dded'that PICS'an'd TLDs are available.in emergency
2 This section was revised to reflect the-correct personnel monitoring capabilities and methodology.
                          ~
me; w nm 1 n:
      ^~ '
p..~.
k-                 kits and for emergency use.
--,.. ~ <-.
F
^~ '
  $.                  SECTION 7.3.1.5 g
~ Word'ihg w'as~a~dded'that PICS'an'd TLDs are available.in emergency
9                   The section was revised to reflect the correct Personnel Survey Y                   Instrumentation capabilities and methodology.
~
Y The section was also revised and reworded for grammar and f                  clarity.                                    .
k-kits and for emergency use.
3                 -SECTION 7.3.1.7
F SECTION 7.3.1.5 g
  "                  Reference was added to backup analytical services being                 -
9 The section was revised to reflect the correct Personnel Survey Y
d'                 available at the Oak Ridge' National Laboratory (ORNL).
Instrumentation capabilities and methodology.
  't SECTION 7.3.1.8
Y f
;                      The PASS ranges were identified.to eliminate "Laters".
The section was also revised and reworded for grammar and clarity.
j Reference was added to ORNL as a backup lab.
3
If
-SECTION 7.3.1.7 Reference was added to backup analytical services being d'
!                      Reference to power and backup power sources was added, per NRC recommendation.
available at the Oak Ridge' National Laboratory (ORNL).
't SECTION 7.3.1.8 The PASS ranges were identified.to eliminate "Laters".
Reference was added to ORNL as a backup lab.
j If Reference to power and backup power sources was added, per NRC recommendation.
SECTION 7.3.1.9 The RRIS' system locations were corrected.
SECTION 7.3.1.9 The RRIS' system locations were corrected.
I The reference to " flow rates" was corrected to " flow indicators".
The reference to " flow rates" was corrected to " flow I
indicators".
The reference to " gross radiation" was corrected to radiation.
The reference to " gross radiation" was corrected to radiation.
,                      There was a grammatical correction.
There was a grammatical correction.
30
30
: t.                             '
 
:i T               The reference.to the NDL was deleted per NRC recommendation,                     '
t.
:i T
The reference.to the NDL was deleted per NRC recommendation,
: F.-
: F.-
since the NDL has not be'en completely defined.
since the NDL has not be'en completely defined.
,,-                  SECTION 7.3.1.10
SECTION 7.3.1.10
.c There were grammatical corrections.
.c There were grammatical corrections.
.?                                     .
.?
E                 SECTION 7.3.1.12_
E SECTION 7.3.1.12_
: y.                                          .
y.
!''                Reference to power and backup power sources was added, per NRC request.
Reference to power and backup power sources was added, per NRC
[                                -
[
k - - - - --     SECTION 7.3.2                                                                   _
request.
sl;L               Reference to Field Monitoring Kits was added.
k - - - - --
                    ' Reference to TETA cartridges was added.
SECTION 7.3.2 sl;L Reference to Field Monitoring Kits was added.
section..was revised to. reflect,.the.. current.TLD and., air. -
' Reference to TETA cartridges was added.
:.x3,,% q, Tit"'*PETGy;;y.Then samp1 'ing network,.
section..was revised to. reflect,.the.. current.TLD and., air.
7 5                 The reference to " gross gamma radiation" was changed to
:.x3,,% q, Tit"'*PETGy;;y.Then 'ing network,.
                    " radiation exposure level".
samp1 7
l SECTION 7.5 The,section was revised to give descriptions of each decontamination facility per NRC request.
5 The reference to " gross gamma radiation" was changed to l
" radiation exposure level".
SECTION 7.5 The,section was revised to give descriptions of each decontamination facility per NRC request.
TABLE _7-2 Radiation Monitor ranges were added, per NRC request.
TABLE _7-2 Radiation Monitor ranges were added, per NRC request.
  ;                TABLE 7-3 6'
TABLE 7-3 6
Radiation Monitor ranges were added per NRC request.
Radiation Monitor ranges were added per NRC request.
TABLE 7-4 Radiation Monitor ranges were added per NRC request.
TABLE 7-4 Radiation Monitor ranges were added per NRC request.
Line 783: Line 881:
The wide Range Gas Monitor type.was corrected to " Beta / Gamma".
The wide Range Gas Monitor type.was corrected to " Beta / Gamma".
TABLE 7-6
TABLE 7-6
                    ' Additional monitors were added.
' Additional monitors were added.
Radiation monitor ranges were added per NRC request.
Radiation monitor ranges were added per NRC request.
31 H v-* m       w
31 H
v-*
m w


g.:
g.:
p FIGURE 7-2                                                       .
.p FIGURE 7-2
    ~
~
The RMS Panel location was added.
The RMS Panel location was added.
FIGURE 7-5, The Figure was revised to reflect the current HP Access Control g           Area layout.
FIGURE 7-5, The Figure was revised to reflect the current HP Access Control g
Area layout.
' '[,.
' '[,.
FIGURES 7-7A and 7-7B These figures reflect the current Radiological Air Sampling u           Network.                                                       -
FIGURES 7-7A and 7-7B These figures reflect the current Radiological Air Sampling u
Network.
s i
s i
b f.
b f.
Line 800: Line 902:


e i
e i
                    . CHAPTER 8                                                                                       ,
. CHAPTER 8 The Chapter was revised to reflect the consolidation of the callaway Radiological Emergency Preparedness Program under the Manager, Nuclear Safety and Emergency Preparedness.
The Chapter was revised to reflect the consolidation of the callaway Radiological Emergency Preparedness Program under the Manager, Nuclear Safety and Emergency Preparedness.
+
  +                 SECTION 8.1.                                                                                       l This.section was revised to reflect the current training program organization.
SECTION 8.1.
SECTION 8.1.1 The section was rev'ised to reflect the current training program as defined by.the Callaway Plant Training Manual. The specific training responsibilities of the Superintendent, Training and Supervisor, Emergency Pr,eparedness were also delineated.
l This.section was revised to reflect the current training program organization.
S ECTION,.8 ..l .1.1,           , . -      .m
SECTION 8.1.1 The section was rev'ised to reflect the current training program as defined by.the Callaway Plant Training Manual.
The specific training responsibilities of the Superintendent, Training and Supervisor, Emergency Pr,eparedness were also delineated.
S ECTION,.8..l.1.1,
.m
: m. 3 This section was revised to reflect the current Essential Personnel Training Program including clarification that personnel will receive training specific to emergency positions.
: m. 3 This section was revised to reflect the current Essential Personnel Training Program including clarification that personnel will receive training specific to emergency positions.
SECTION 8.1.1.2 This section was revised to reflect the current GET Trair.ing Program.                                                                  .
SECTION 8.1.1.2 This section was revised to reflect the current GET Trair.ing Program.
SECTION 8.1.1.3 The title was added to this section.                                                               l SECTION 8.1.2 This section'was revised to reflect the current Off-Site Training Program.
SECTION 8.1.1.3 The title was added to this section.
SECTION 8.1.3 l                   The title was changed to be more appropriate to the section content.
l SECTION 8.1.2 This section'was revised to reflect the current Off-Site Training Program.
SECTION 8.1.3 l
The title was changed to be more appropriate to the section content.
SECTIOi! 8.1.4 The title was changed to be consistent with the Public Information' Plan.
SECTIOi! 8.1.4 The title was changed to be consistent with the Public Information' Plan.
:The informational booklet content was revised to reflect
:The informational booklet content was revised to reflect
                  -current information.
-current information.
Specific transient locations were deleted per request of g                    off-site authorities.                                                                               l 33
Specific transient locations were deleted per request of off-site authorities.
_ - _ .      . . _ .  -.      _ _ . _ .      . - ,    _ _ - . .-~,_-.___._ _ .-,   -
l g
33
_ _ -..-~,_-.___._ _.-,


1 l
l SECTION 8.2
  !                                                                                                        l SECTION 8.2
'1 This section was revised to reflect the current Drills and Exercise Program.
                                                                                                        '1 This section was revised to reflect the current Drills and       l Exercise Program. More emphasis was added to the critique process. The responsibility for corrective actions was changed   i to the Supervisor, Emergency Preparedness.                       l l
More emphasis was added to the critique process.
Reference was added to unannounced drills and drills under       l varying weather conditions, per NRC recommendation.               (
The responsibility for corrective actions was changed to the Supervisor, Emergency Preparedness.
Reference was added to unannounced drills and drills under varying weather conditions, per NRC recommendation.
SECTION 8.3 This section was revised to reflect organizational changes.
SECTION 8.3 This section was revised to reflect organizational changes.
The Manager, Nuclear Safety and Emergency Preparedness was given the responsibility for the RERP.
The Manager, Nuclear Safety and Emergency Preparedness was given the responsibility for the RERP.
The Manager, Callaway Plant was given the responsibility for
The Manager, Callaway Plant was given the responsibility for
..5 reviewing and approving the RERP and its implementing procedures.
..5 reviewing and approving the RERP and its implementing procedures.
The NSRB's responsibility for an " independent" audit was clarified.
The NSRB's responsibility for an " independent" audit was clarified.
SECTION 8.4 This section was revised to clarify the revision methodology.
SECTION 8.4 This section was revised to clarify the revision methodology.
The Manager, NSEP was given the responsibility for informing     l
The Manager, NSEP was given the responsibility for informing personnel of the RERP, procedures, and changes.
'                                      personnel of the RERP, procedures, and changes.
SECTION 8.5 Criteria as to when emergency equipment kits are to be j
SECTION 8.5 Criteria as to when emergency equipment kits are to be           j inspected was specified.
inspected was specified.
A paragraph was added clarifying equipment calibration, per NRC request.
A paragraph was added clarifying equipment calibration, per NRC request.
l l
l l
34
34


i m.
i m.
CHAPTER 9                                                                                       ,
CHAPTER 9 SECTION 9.1, Per NRC request, reference was added to notifying the NRC of the intent to declare Recovery.
SECTION 9.1, Per NRC request, reference was added to notifying the NRC of the intent to declare Recovery.                                                                             ,
The section was revised to ref)ect the Recovery Manager's and Emergency Coordinator's responsibilities for establishing and directing the Recovery Organization.
The section was revised to ref)ect the Recovery Manager's and
'      Emergency Coordinator's responsibilities for establishing and directing the Recovery Organization.
SECTION 9.2.1
SECTION 9.2.1
        " Nuclear" was added after the Vice President to specify which Vice President.
" Nuclear" was added after the Vice President to specify which Vice President.
.        SECTION 9.2.4 i
SECTION 9.2.4 i
Grammatical corrections.
...~.g. Grammatical corrections.
...~.g.
SECTION 9.2.8 l
SECTION 9.2.8 l       Recovery Manager approval of news releases was changed to information for news releases.
Recovery Manager approval of news releases was changed to information for news releases.
        .SECTION 9.5 Deleted generic references to procedures. .                                                              .
.SECTION 9.5 Deleted generic references to procedures..
Corrected a typo and a grammatical error.
Corrected a typo and a grammatical error.
i SECTION 9.6 Reference was added to-the manual dose assessment procedures.
i SECTION 9.6 Reference was added to-the manual dose assessment procedures.
i                                                                                             .
i i
i 35
35
    .7         --  -- ,. ~   ,.          .      ._. . , _ _ _ . . - _ ,             _              _}}
.7
--,. ~
,}}

Latest revision as of 08:58, 14 December 2024

Forwards Detailed Description of Changes in Rev 6 to Radiological Emergency Response Plan,Per 840120 Request
ML20080M978
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/25/1984
From: Stiller M
UNION ELECTRIC CO.
To: Rohrer D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20080M955 List:
References
ULNRC-732, NUDOCS 8402220041
Download: ML20080M978 (37)


Text

.=.

January 25, 1984 Mr. David M. Rohrer Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission.

Washington, D. C.

20555 ULNRC-732

Dear Mr. Rohrer:

During our meeting with you on January 20, 1984, you requested that we provide you with a detailed description of the changes made in our Radiological Emergency Response Plan (RERP) in arriving at Revision 6.

This effort has now been completed and is attached.

If you have any questions on this revision or the enclosure, we are available to discuss it at your convenience.

Very truly yours, M. A. Stiller Manager, Nuclear Safety and Emergency Preparedness MAS /dch Enclosure cc:

Tom Ploski,-Region III F

l'

1-If CHAPTER 1 SECTION'l.1 a.
[.

' Deleted definition of " Clean Area / Equipment" and modified i i definition of " Contaminated Area" to reflect Health Physics definitions.

Definition of " Emergency Planning Zone" corrected typo and added "EPZ" for clarification after plume exposure and ingestion exposure pathways.

Definition " Emergency Plan Implementing Procedures" corrected.

wording.

Corrected the location of the center point of the " Exclusion Area" and " Exclusion Area Boundary".

i k' Added the definition of owner Controlled Area.

l Changed " Personnel Monitoring Equipment" to " Personnel Monitoring Devices" and corrected wording to reflect-Health Physics definition.

J Deleted the definition of " Publics" per NRC request.

Not defined in-Webster's Dictionary.

i Corrected definition of " Radiation Area" to be consistent with Health Physics and 10CFR definitions.

Corrected definition of " Radiological Controlled Area" to be consistent with Health Physics definitions.

Added definition of Recovery Manager.

l Added a clarification statement to definitions of " Site Emergency" and " Unusual Event" to correlate with NUREG-0654,-

per.NRC request.

3 4

t 4

s Y

1

~

.~

- CHAPTER 2 SECTION 2.1 Page 2-2 Added "and-authorities" per NRC request.

SECTION 2.4 Page 2-5 Typo corrected.

SECTION 2.5 Page 2-6 Corrected grammatical errors.

SECTION 2.6 Page 2-7 Deleted last sentence under Security Plan and Procedures.

Access is controlled by normal

- )"

Security Procedure, no special provisions had to be written.

4 a

4 2

. _.. - _. - _ _ _... ~ _, _

~

a..

$N

. CHAPTER 3 SECTION 3.1 Corrected reference to the Appendix due to the deletion of Appendix G in Rev. SA.

i-SECTION 3.1.1.3 Changed " Implementing Document" to " Emergency Plan Implementing Procedures" to be consistent in terminology.

SE,CTION 3.1.1.5 Grammatical corrections and added " Authority" per NRC request.

SECTION 3.1.1.6 Changed " Implementing Document" to " Emergency Plan Implementing Procedures" to be consistent in terminology.

SECTION 3.2 Grammatical correction.

SECTICN 3.3 Changed " appropriate" to " Plant and Corporate Management" to be more specific and made a reference to defi.ciency tracking for clarification.

Added reference to Administrative Procedures for clarification.

d 4

3 c

-m

~

-[

CHAPTER 4 PAGE 4-1 Added clarification statement for titles of emergency j

classifications to correlate with NUREG-0654 per NRC request.

PAGE 4-2 Added' wording to change 30 minutes to a goal of 15 l-minutes'for accident classification per NRC request.

SECTION 4.1.3 PAGE 4-3 Wording. change from place on standby, to notify the Corporate Emergency Organization for clarification.

f, SECTION 4.2.1.3 I

Deleted last two paragraphs because Figures 4-1 to 4-6 were deleted.

~

9 E

SECTION 4.2.l'.4 Grammatical error corrected.

SECTION 4.2'.l.5 Grammatical error corrected.

SECTION 4.2.1.6 Grammatical error ccrrected.

SECTION 4.2.1.8 Added the word " drive" to correct the terminology.

SECTION 4.2.lT9.

Grammatical error corrected.

FIGURES 4-1, 4-2,:4-3, 4-4, 4-5, 4-6 were deleted.

The graphs were unreadable-and there were no instructions for their use.

Deleted withsNRC concurrence.

TABLE 4-1 EMERGENCY ACTION LEVELS All "TBDs" were added to complete the EALs.

The following EALs had TBDs removed:

Group 1 Conditions B, E,

F Group 2 Conditions A, C, F, G, H

Group 6 Conditions C, D 4

s

%J,

$+

r

t

-l

-~

4 t

Group 8 Conditions A, B, C, F

^

~"and" was changed to "or" per NRC request on the following EALs:

g li-Group 2 Conditions D, E, G, H u

Group 3 Conditions I, J, K

Group 5 Conditions H Group 7 Conditions B, K

{

Group B Condition G

~

Review and evaluation by SNUPPS and UE corrected the following EALs for the Callaway Plant:

Group 1 Conditions A, B,C, D,

E, F

r Group 2 Conditions A, C, D, E,

F,G, H

Group 3 Conditions A, B, C,

D, E,

F,G, H,

I Group 5 Conditions A, B, C, D Group 6 Conditions A, B, C, D

Group 7 Conditions B, C, D,

E, I

Group 8 Conditions D, F

e Specific. indicators, such as meter, panel or instrument

-[

numbers, were added to the following EALs:

v Group l Conditions A, B, C,

D, E,

F, G Group 2 Conditions C, D,

E, F,

G, H

Group 3 Conditions A, E,

F, I

Group 4 Conditions A, B,

C, D,

E, F

Group 5 Conditions A, B,

C, D,

E Group 6 Conditions A, B,

C, D,

E, H,

I Group 8 Conditions B, C

EALs were printed in such a manner as to eliminate having EALs continue onto the next page.

By doing this, most of the continued statements were eliminated and most of the EALs are not split between pages.

The EALs are now identical to the EALs contained in the Emergency Plan Implementing Procedure, 5

?.

_ g, i' -

f EIP-ZZ-00101, Classification of Emergencies, Revision 1.

(Date of issue January 5, 1984)

TABLE 4-2 1

Added cross references to NUREG-0654, Unusual Event items 14 through 17 to complete the cross references.

These were

- i -

overlooked in this table in Revision SA.

?

i TABLE 4-3 All instrument and range "TBDs" were added to complete the table.

17 1

9

'; d 6

.)

~d e

CHAPTER 5 SECTION 5.1.1 lv(

Corrected a reference to another section'.

7.<$

Deleted the word " divisions" in reference to the plant i'

organization to be consistent in terminology.

Added " Material Management" to update the RERP in plant

'F organizational change.

b Deleted " Division" in Sections 5.1.1.2 and 5.1.1.3.

-U El Added entire Section 5.1.1.4 Material Management to update the RERP in plant organizational change.

'r -

SECTION 5.1.1.5 6-

,w lC Changed section number as a result of adding Material

- e.

Management.

h Corrected two typos.

SECTION 5.1.2

[

Added " authority and" to indicate that the Vice President does have the necessary authority for all activities relating to the Callaway Plant, SECTION 5.1.2.2 Added the departments of Nuclear Fuels and Nuclear Services i

which were inadvertently left out of Rev. SA.

c Grammatical correction.

SECTION 5.2 Added "and authority" to clarify that the On-Shift Emergency Organization has the authority to take any necessary actions to mitigate the consequences of an emergency.

Changed Emergency Management individuals to Emergency Coordinator or Recovery Manager for a specific reference on who activates the Emergency Organizations.

Added a sentence to indicate that members of the Emergency Organizations have the necessary authority to perform their duties.

Added per request from the NRC.

7

?

A f

SECTION 5.2.1 Changed the EDO assuming Emergency Coordinator responsibilities in the Control Room to the TSC.

This was done at the request y

of the Plant Manager.

The Shift Supervisor should remain in control of the Control Room.

A sentence was added to ensure oncoming personnel were briefed prior to-assuming responsibilities, per NRC request.

SECTION 5.2.2.1 Clarification of the actions the Shift Supervisor takes after declaration of an emergency.

Added the Shift Supervisor has L

full authority of the Emergency Corodinator during emergencies per NRC request.

SECTION 5.2.2.3

-.D eg-Deleted an inappropriate reference.

SECTION 5.2.2.4 Deleted generic references to procedures.

SECTION 5.2.2.6 Corrected the title of Rad / Chem Foreman.

x SECTION 5.2.2.7 Corrected reference to another section.

SECTION 5.2.2.8 Added statement to indicate Security will provide support to emergency teams.

SECTION 5.2.2.9 Clarified the duties of the Rad / Chem Technicians.

Corrected reference to another section.

l SECTION 5.2.2.10 Corrected reference to another section.

SECTION 5.2.2.11-Grammatical clarification.

SECTION 5.2.2.12 Added a statement "with at least one" which was inadvertently left out of Revision SA.

8

~-

k Corrected reference to another section.

SECTION 5.2.3 Deleted generic reference to procedures.

Added a clarifying statement to indicate capability exists for

~

continuous operation of the On-Site Emergency Organization.

Spelling correction.

'SECTION 5.2.3.1 Added a statement to indicate the authority of the E.7.ergency Coordinator per NRC recommendation.

Word change for clarification.

Indicated that the Manager Callaway Plant is the primary Emergency Coordinator per NRC request.

SECTION 5.2.3.2, Added " Selected Emergency Planning Personnel" to increase depth of this position, per ORC review.

SECTION 5.2.3.4 Deleted generic reference to procedures.

Corrected references to other sections including the addition of Chemistry Coordinator.

Corrected communications chain for the Technical Assessment Coordinator.

Added " selected" to Supervising Engineers per ORC review.

SECTION 5.2.3.5

.Added entire section of Operations and Maintenance Coordinator to reflect Emergency Organization change, per Plant Staff recommendation.

The Revision SA section 5.2.3.5 was changed to 5.2.3.8.

SECTION 5.2.3.6 Typo corrections.

Corrected reference to another section.

Added " selected" to Training Supervisors per ORC review.

9

~..

--m SECTION 5.2.3.7 Corrected reference to another section.

Typo corrected.

Added " selected" to Records Management System Supervisors per ORC review.

SECTION 5.2.3.8 Renumbered section, Revision SA*'section number 5.2.3.5, due to addition of Operations and Maintenance Coordinator.

t Deleted Assistant Manager, Operations and Maintenance due to the addition of the position of Operations and Maintenance Coordinator.

i Changed "Off-Duty Shift Supervisors" to " Selected Shift / Operating Supervisors".per ORC review.

All subsequent sections in the 5.2.3 series have been renumbered due to the addition of Section 5.2.3.5 and moving ~

the SA section of 5.2.3.5 to Revision 6, Section 5.2.3.8.

SECTION 5.2.3.9 Renumbered section.

SECTION 5.2.3.10

~-

Renumbered section.

SECTION 5.2.3.11 Renumbered section.

Deleted the word " calculating" before off-site dose projections.

Calculations may not have to be manually performed if RRIS is functional.

Corrected reference to another section.

Added " selected" to Rad / Chem Foremen per ORC review.

SECTION 5.2.3.12 Renumbered section.

Corrected reference to another section.

Typo corrected.

Added Selected" to Rad / Chem Foremen per ORC review.

10 Fp 4

3 4

~

9

>y-t vr

SECTION 5.2.3.13 Renumbered section.

Section 5.2.3.13, Rev. 5A position of Maintenance Coordinator was deleted with the addition of Operations and Maintenance Coordinator.

Corrected reference to another section.

Added Assistant Superintendent, Security to personnel list,

~

Due to a UE organizational change.

Deleted Security Training Supervisors, Security Administrative Supervisor, Security Training Instructor, and Off-Duty Shift

- Security Supervisors and added " Selected Security Supervisory and Training Personnel", per ORC review.

3. -

-.. - SECTION S.2.3.14m.,

. x Complete section added due to the addition of this position, Chemistry Coordinator, per plant recommendations.

SECTION 5.2.3.15 Renumbered section.

Deleted Chemistry and Radwaste from responcibilities of the engineers due to the addition of Chemistry. Coordinator and reassignment of responsibilities.

Changed the list of personnel trained for TSC Engineers to

" Selected Supervising Engineers" and " Selected Engineers", per ORC review.

These two positions can include all individuals in the previous list.

SECTION 5.2.3.16 Renumbered section.

Added the list of personnel who can be trained for the position

~

which was inadvertently left out of Revision SA.

SECTION 5.2.3.17 Renumbered section.

Corrected reporting scheme due to the organizational change.

Change the personnel list of individuals who can be trained for.

this position due to the organizational changes and ORC review.

11 1

7 w

=

y-me'-

-"dev-e-

me WP

--r*.

T'9M-

?-

-'e d

t'

-Tf

-~'*

  • PP--

t

p.

SECTION 5.2.3.18 Renumbered section.

Added specific reference to-type of status boards to be maintained in the TSC.

Changed the personnel list of individuals who can be trained to

" Selected Plant Personnel", per ORC review.

SECTION 5.2.3.19 Renumbered.section.

Corrected reference to another section.

Changed the personnel list of individuals who can be trained to

" Selected Rad / Chem Technicians" and " Selected Rad / Chem Foremen".

Deleted engineers from the liic, per ORC review.

SECTION 5.2.3.20 Renumbered section.

Added the responsibility of providing clerical support.

SECTION 5.2.3.21 4

Renumbered seccion.

x Delineated responsibility of Chemistry activities because of the addition of the Chemistry Coordinator.

SECTION 5.2.3.22 Renumbered section.

Corrected reference to another section.

SECTION'5.2.3.23 i

Renumbered section.

r-Added "with at least one" which was inadvertently left out of Revision SA.

i SECTION 5.2.3.24 1

l Renumb? red section.

l SECTION 5.2.3.25 Renumbered section.

~

12 l

i; 7-I SECTION 5.2.3.26 Renumbered section.

Indicated Security personnel will provide support to emergency teams.

SECTION 5.2.3.27 This section was added to cover the responsibility of obtaining parts and supplies from the warehouse during emergencies.

SECTION 5.2.4 2

6 Reworded for clarification.

Changed " Higher Classification" to specific Emergency Classifications of " Site or General Emergency".

d I

Grammatical changes for clarification.

Changed arrival time for individual arriving at the EOF from 3 to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to 90 minutes to reflect actual arrival time of the Off-Site Liaison Coordinator.

Deleted the word " additional" from one of the primary responsibilities.

Grammatical change.

3 Deleted "and public" since this is a responsibility of Public Relations. -

Deleted " including dose assessment" to eliminate redundancy.

'i Deleted reference to the Corporate Office since the Corporate Emergency Organization operates out of the EOF not the Corporate Office.

SECTION 5.2.4.1 Grammatical corrections.

Spelling correction.

Indicated that the Vice President, Nuclear is primary Recovery Manager per NRC request.

SECTION 5.2.4.2 Typo correction.

Changed " Staff Health Physicists / Nuclear Scientists" to

" Selected Engineers and Health Physicists" to include Nuclear Engineers from the Corporate Office per ORC review.

13

j y-SECTION 5.2.4.3 Deleted special items which the Administrative / Logistics Coordinator is not responsible for providing.

Added provisions for providing clerical support.

Deleted references to field kitchen and trash disposal.

If food is required, it will be catered and normal trash disposal is adequate.

Removed responsibility of administrating payroll and expense accounts from the Administrative / Logistics Coordinator's responsibility since he is not responsible for these.

Deleted references to responsibility Lor special transportation requirements.

,i Typo corrections.

SECTION 5.2.4.4 Indicated that the QA Coordinator may not be part of the initial emergency response, but will be called when needed.

Changed the personnel who can be trained for this position to reflect changes in UE organization.

SECTION 5.2.4.5 Added UE for clarification.

Deleted responsibilities which were redundant and not in the

-responsibility of the Technical Support Coordinator.

g.

I Added the responsibility for coordinating the response of Federal Agencies per NRC request.

SECTION 5.2.4.6 I

Indicated that the Construction Coordinator may not be part of the initial emergency response but will be called when needed.

Deleted the responsibilities which were summarized in the previous paragraph to eliminate redundancy.

Eliminated Supervising Engineer, Nuclear Construction from personnel list due to organization change.

SECTION 5.2.4.7 Eliminated redundant wording and grammatical correction.

Typo correction.

14

u Deleted a responsibility which is a summary of other responsibilities.

Added Selected Emergency Preparedness Personnel to increase the depth of this position per ORC review.

SECTION 5.2.4.9 Corrected reference to another section.

Changed.the list of-personnel to be trained for the position to

" Selected Engineers and Health Physicists" to reflect the UE Corporate Organization.- Deleted Rad / Chem Foremen since they will not be responding as the Corporate Emergency Organization, per ORC review.

SECTION 5.2.4.10 3

Added " Selected"-to " Rad / Chem Technicians" and " Rad / Chem.

Foremen" per ORC review and deleted the word " Plant" since'it is unnecessary in this phrase.

SECTION 5.2.4.11 Added " Selected" to " Staff Engineers".

SECTION 5.2.4.12 Added entire section which was overlooked in the previous revision.

SECTION 5.3 Typo corrected.

Moved reference to Appendix C to Section 5.3.1.

SECTION 5.3.1

.Added reference to Appendix C.

SECTION 5.3.2 Added text to eliminate TBD.

SECTION 5.3.3 and 5.3.4 Sections were rewritten to indicate current methodology.

SECTION 5.3.6 Grammatical correction and eliminated generic reference to procedures.

15

SECTION 5.4.1 Increased the discussion of Federal response direction and coordination, per NRC request.

SECTION 5.4.1.2 Added reference to Oak Ridge National Laboratory, to reflect the recent agreement with them.

SECTION 5.4.1.4 1

Changed the notification of the Coast Guard to the current methodology.

SECTION 5.4.1.5 and 5.4.1.6 New sections added to indicate FAA and NWS support, per NRC 7-request.

y i

SECTION 5.4.2.1 Eliminate generic reference to procedures and the Missouri Nuclear Accident Plan.

Deleted " facilities" as it was misused in sentence.

. ".y SECTION 5.4.3 4

Clarifi~ cation of responsibility of off-site emergency planning.

Added a statement to clarify the coordination of off-site activities.

Corrected the response time of the local authorities.

SECTION 5.4.3.1 Renumbered from 5.4.3.2.

Previous provision to dispatch technically qualified individuals to State and local EOC's, if requested, was removed.

Changes were made to clarify the communications with the ambulance per NRC request.

Title of Callaway Memorial Hospital was corrected.

TABLE 5-1

" Required Response Time" was changed to " Response Goal" per NRC recommendation.

16

Emergency Positions of " Operations and Maintenance Coordinator" and Chemistry Coordinator" were added, and " Maintenance Coordinator" was deleted to reflect the change in the-Emergency Organization.

A response time-for the Emergency Coordinator was added per NRC recommendations.

Inf~ sation was added to Operational Support Personnel for the add.cion of Stores Personnel to the OSC.

Added Response Goal of 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the Corporate Emergency Organization.

Added "As Needed" for the response level for the Construction and QA Coordinators, since they may not be needed for the initial response of the Corporate Emergency Organization.

Added Response Goal of 60-75 minutes at the Alert.for the Public Information Coordinator.

FIGURE 5-1 This Figure was modified to reflect the changes in the Plant Organization.

The addition of Assista'nt Manager Material Management and the addition of another Superintendent Administration, to split Administration into two section of Records and Services, is reflected in this change.

'"~

FIGURE 5-2 The position of Principle Health Physicist was deleted.

FIGURE 5-5 This Figure was modified to indicate the changes in the On-Site Emergency Organization. 'This includes the addition of the Operations and Maintenance Coordinator, Chemistrv Coordinator and the deletion of the Maintenance coordinator FIGURE S-6 "As Needed" was added to the Construction and QA Coordinators.

+

FIGURE 5-7 This Figure was modified to reflect the changes in the On-Site Emergency. Organization.

I FIGURE 5-9 A verification call was added between Callaway County /Fulton to r

i the Control Room to reflect current methodology.

17

-v N

Q!.

CHAPTER 6 PAGE 6-1 Grammatical corrections.

SECTION 6.1 n.

Spelling and grammatical corrections.

Deleted generic reference to assessment time which is discussed in Chapter 4.

SECTION 6.2 7

Grammatical corrections.

5 Added "to escalate or" to the items to take into account for making a judgemental decision.

SECTION 6.3 Changed "will" to "shall" per NRC recommendation.

Added UE Corporate Office in the list of notifications.

Changed Public Information Coordinator to Public Relations in the notification list.

Changed the notification requirements to the State and local author,ities and the periodic updates per NRC recommendations.

SECTION 6.3.2 Section 6.3.2 of Revision SA was changed to Section 6.3.3 in Revision 6.

Section 6.3.2 (Section 6.3.3 in Revision SA) was split into two subsections for clarification, 6.3.2.1 and 6.3.2.2.

SECTION 6.3.2.1 New subsection number and title.

Added additional information for the notification and verification of the local authorities for clarification.

SECTION 6.3.2.2 New subsection number and title.

Deleted generic reference to procedures and the Missouri Nuclear Accident Plan.

Deleted the reference to the thirty minute verification call from the State to have consistent wording for all 18

^

~-

4 w.

notifications.

The specific details are in the implementing procedures.

Added a reference to'a Figure and additional information about notification and verification with the State for clarification.

SECTION 6.3.3 Renumbered section was Section 6.3.2 in Rev. SA.

Corrected.the reference on who would be notified.

Changed Public Information Coordinator to UE Public Relations.

SECTION 6.3.4 Section 6.3.4 in Rev. 5A was changed to Section 6.3.5 in Rev.

~ 6.

S Added the' entire section to include notifications to the Union Electric Corporate Office since they will be notified of

+

emergencies at the Callaway Plant.

SECTION 6.3.5

' Renumbered section.

Corrected the title of the Communicator making notifications.

SECTION~6.4 n

Added the factor, for the situation to escalate, to consider when mobilizing emergency organizations.

Changed response-times to response goals per NRC recommendations and corrected the time in the first group Deleted " designated" in front of Emergency Coordinator since the Emergency. Coordinator is a specific position.

Changed the' response goal of the Corporate Emergency Organization to approximately-2 hours and corrected a typo.

~SECTION 6.4.2 Grammatical correction.

Deleted generic reference to procedures.

f SECTION 6.4.3

?"

Typo corrected.

Deleted generic reference to procedures.

. 19

~

4' y-iv=y v

c+

vp -

vcwgr g--a ya y-y

.e w.

r -we

+P4y*--*qu

=-v+my-'we ms wee a-W-c-WeWy--*+q q

+w+-+e"W-

+

m-4 Nwn w+ v,

Corrected the methodology in initiating the call-out of the Corporate Emergency Organization.

SECTION 6.5 Specified " Emergency Action Levels" in place of " levels".

Typo corrected.

Grammatical correction.

SECTION 6.5.1 Grammatical correction, deleted "by the Operating Supervisor or Unit Reactor Operator", since it was previously discussed.

Terminology correction.

Typo correction.

I SECTION 6.5.2 Added the initial assessment would be based on Plant and meteorological parameters and would be verified by Field Monitoring Teams.

Also included a reference to the number of teams which can be formed.

Per NRC recommendations.

SECTION 6.5.2.1 This section was rewritten to elaborate on the methodology and capabilities of the Dose Assessment activities.

This was done to satisfy Section I of NUREG-0654 per NRC recommendations.

SECTION 6.5.2.3 Corrected the references to Emergency Teams.

l Clarified the priority activities in regard to posting of areas l'

based upon radiological conditions.

Deleted a reference as to when the TSC is activated since it is f

inappropriate in this sentence.

It is previously discussed.

l SECTION 6.5.4 i

L Grammatical correction.

i SECTION 6.6 l

Typos corrected.

20

,~

SECTION 6.7 Indicated protective actions can be initiated based upon projected radiation levels per NRC recommendations.

Clarified the reference to another section and deleted a generic reference to the Missouri Nuclear Accident Plan.

Clarified the decision to make protective action recommendation process per NRC recommendations.

SECTION 6.7.1.1 Corrected the alerting sequence for on-site personnel and the related terminology.

.The Construction personnel will be knowledgeable of the required actions to be taken when alerted was restated for

,,.9 correction and clarification.

SECTION 6.7.1.2 Changed the required area for accountability from the Protected Area to the Owner Controlled Area per NRC recommendation.

Added additional information on the methodology for-accountability.

Portions of the second paragraphs was dele.ted and was combined in the third paragraph in Rev. 5A to make one paragraph in Rev.

6.

This was done to better describe the methodology for accountability and to delete references to the Training Center as an assembly point.

The time requirements were better described and changed to a goal per NRC recommendations.

~

Additional information was added to clarify construction activities for accountability.

.Information concerning visitors was corrected to reflect UE policy.

SECTION 6.7.1.3 The Security Coordinator was added as he is responsible for accountability and access control.

.A paragraph was added to clarify who is authorized to pass Accass Control _ Points established by the Sheriff's Department, per NRC request.

SECTION 6.7.1_4 A reference was added to the decontamination facility in the EOF, per NRC recommendation.

21

A sentence was added to state protective clothing will be provided as replacement clothing if personal clothing becomes contaminated, per NRC recommendation.

E References to visitors and contract personnel were deleted from the second paragraph as they are discussed in the first.

A reference was added to the Health Physics Access Control Area for clarification.

SECTION 6.7.1.5 The third and fourth paragraphs from Rev. SA were combined and rewritten to explain the methodology for evacuation.

This was done due to the deletion of the Training Center as an assembly area and to be consistent with Section 6.7.1.2.

SECTION 6.7.2

.h Deleted generic references to procedures.

SECTION 6.7.2.1 Grammatical correction.

Clarifications were made on who is responsible for implementing Protective Actions in each of the Counties.

A paragraph was added to indicate protective actions could be implemented'within 15 minutes from the declaration of a General Emergency, per NRC recommendation.

The paragraph describing the Public Alert System was changed to reflect the current system of sirens and tone alert radios.

(See Appendix I)

SECTION 6.7.2.2 There were typographical and grammatical corrections.

l The State point for the reporting of Protective Action l

Reccmmendations was changed from BRH to SEMA to reflect the j

correct reporting methodology.

The use of the RRIS and PASS was revised to reflect correct terminology and to show the correct methodology for using input from the systems to form protective action recommendations.

A sentence was added to reference that recommendation can be made within 15 minutes for a General Emergency, per NRC request.

An inappropriate reference to the Public Information Plan was deleted.

22

The description of the methodology for public notification and evacuation was expanded and corrected.

The Emergency Coordinator was added as having the responsibility to ensure off-site authorities are updated upon emergency reclassification.

SECTION 6.7.3.2 Wording was added that protective clothing will be available as replacement clothing, per NRC request.

SECTION 6.7.3.3

" Emergency centers" was changed to "on-site emergency centers".

SECTION 6.7.3.4 t

This section was revised to reflect that Potassiun lodide will be stocked and made available to emergency workers.

SECTION 6.7.4.1

" Health Physics procedures" was changed to " Health Physics Operating Manual".

The section was revised to reflect the current contamination control methodology.

SECTION 6.7.4.2

" Exclusion Area Boundary" was corrected to " owner controlled area".

" State monitoring teams" was changed to " Field Monitoring Teams".

The reference to the State of Missouri Nuclear Accident Plan was changed to Table 6-5.

SECTION 6.8.1 A reference was added to the Health Physics Department for clarification.

Intervals for reading pocket ion chambers was clarified per NRC recommendation.

Reference was added to the Rad Con Coordinator.

Per NRC request, a statement was added to inform the NRC of the intent to exceed 10CFR20 '.imits, if possible.

23

scription of the methodology for public notification and tion was expanded and corrected.

orgency Coordinator was added as having the

.cibility to ensure off-site authorities are updated upon ncy reclassification.

N 6.7.3.2 g wa's added that protective clothing will be available as cment clothing, per NRC request.

N 6.7.3.3 oncy centers" was changed to "on-site emergency centers".

N 6.7.3.4 ection was revised to reflect that Potassium Iodide will cked and made available to emergency workers.

N 6.7.4.1 h Physics procedures" was changed to " Health Physics ing Manual".

ction was revised to reflect the current contamination jl methodology.

N 6.7.4.2 lsion Area Boundary" was corrected to " owner controlled L

monitoring teams" was changed to " Field Monitoring lforence to the State of Missouri Nuclear Accident Plan anged to Table 6-5.

l'N 6.8.1 rence was added to the Health Physics Department for

'ication.

=le sn* *acA4nn nnnvoe inn chambore wa.c cl a ri fi ed ner NRC

I2 2.,:....

.g

'Y

,y.

Reference to exposure limits for State add 51'ocal' agencies was added for clarification, per NRC recommendatijn.

?.,y

' f2 SECTION.6.8.2

_q h

...., =,..

.. w.

~.

~

Reference:

was added to " multi media"; trained / personnel being

r]i j 'j available - on-shif t, per NRC request.:

~ ~ ~

'g 4

Th'ere were grammatical corrections.

ft Per NRC. request, a-reference to radiciodine skin contamination f

was e.Jded.

a Search and-Rescue Teams was-specified4 or,. emergency teams.

S

{

SECTION 6.8.3 A

The Callaway Plant vehicle description was clarified to show g"...#

--.a.t.ha. t.ite. wa,'s,<.,no t an ambulance.

_7.

There'was a reference change.

j SECTION 6.9 There were grammatical corrections.

SECTION 6.9.1 The section was reworded to elaborate on the information

" booklet".

~ --

. r.

Generic references to the Public Information Plan and the Missouri Nuclear Accident Plan were. deleted.

}

SECTION 6.9.2.

There was a grammatical correction.

A generic reference to procedures was deleted.

The section was revised to reflect the current Public Relations organization and methodology for emergencies.

SECTION 6.9.3 The section was added to more adequately explain the methodology for Rumor Control, per NRC request.

_ TABLE 6-1 Description of surveys for the EAB was corrected.

24

5

- ~ r.

3.

[x 6-u.~ : -

TABLE 6-2 et The references to the source document were added to the table,

} );

per NRC recommendation, ty Fl TABLE 6-3

f if A reference to the source document was added to the table, per NRC recommendation.

?

k, TABLE 6-4.

0 A reference to the source _ document was added to.the; table,.per T

NRC recommendation.

TABLE 6-5 s y References were corrected.

I$

42;.M.'"T'17 %Q'V;T%?Vi'!afll'w!?N@tm;WLW.7L*:$32','T:~!!i?.=

TABLE 6-7 e

Table 6-7 of Rev. 5A was deleted.

e s

FIGURE 6-1 The Figure was revised to reflect the new Notification Form as agreed upon by SEMA.

L FIGURE 6-2

.i4 t

The Figure was revised to reflect the new Follow-up

?

Notification Form as agreed upon by SEMA.

1 s

e 25

, yw.

n

.<M i

k+

u M

CHAPTER 7

x
(v-SECTION 7.1.1 j{

. y.e.

. *c The numbercof-SPDS terminals in the Control. Room was changed j

L from two<to'one to reflect the correct number of terminals to ik be installed.

ij if L,_.

i c

i$

The' PASS " terminal" was changed to " disp' lay" to reflect the

g' correct PASS configuration.

,g

g The reference to dedicated telephone links and the radio lg

-console was changed to reflect the correct. Rev. _6 refer.ence?.-

1 it -

e f(

SECTION.7.1.2-3 X.

Made grammatical corrections and reworded to reflect on-site _

!'+-

..g orientation of TSC activities.

controlled" copies o~f'documen%'ts to show:.tsd,%6:y:ge&

\\ pghmiW@M.cM '

' i % : 2 s'* W 32f::r.m :~=~

- M mw - ~.. a.. -mk:L

=3 Re erence was added to

'that the documents are maintained on a current basis, per NRCz recommendation.

fg-SECTION 7.1.3

,E The word " portable" was added to the radiological monitoring equipment.

l f-The reference to OSC communications capabilities was changed 41 from 7'2.2.4 to the correct Rev. 6 reference of 7.2.3.4.

Il r& '

A paragraph was added to discuss OSC habitability and g

monitoring equipment.

f SECTION 7.1.4 The specific location of the backup EOF was deleted due to the

..l}

fact that the facility is under' negotiation.

Wording was added to radiological and environmental assessment l4 to reflect the "off-site" orientation.

SECTION 7.1.5 l

The " EOF Organization" was corrected to the " Corporate Emergency. Organization in the EOF".

L SECTION 7.1.6

~The specific location of the JPIC was deleted due to the fact that the location is under negotiation.

1 i

26

'u pm

4 SECTION 7.1.8

'9 s

The location of the State EOC was clarified.

r 3;

I SECTION 7.2.1-c.

p

" Plant Workers" was deleted as it is redundant to " emergency

i

-teams".

SECTION 7.2.

.' l i

b

" Multi-tune" was corrected to " Multi-tone".

h-S SECTION:-7.2'.2 E

T To eliminate redundancy, reference to the " Kingdom Telephone i

Company" was deleted as it is the " local public telephone t.

company".

. f 33 "

SECTION - 7. 2 '.1 rt_~ r #; gp ;g;&+x.

^

  • .a

- --~c- ' ~ -

3

. sq::.4 This section was added to clarify the dedicated communications systems.

SECTION 7.2.3.1 This section was renumbered to reflect the new numbering e

sequence (Rev. 6).

5 The reference to " Channel 2" was corrected to " plant channel 1".

SECTION 7.2.3.2

[

The~section was renumbered to reflect the new numbering 1

sequence (Rev. 6).

The reference to " Telephone" was corrected to "line".

The reference to " channel 5" was corrected to

" plant channel 2".

SECTION 7.2.3.3 The section was renumbered to reflect the new numbering sequence (Rev. 6).

~

r The reference to " channel 5" was corrected to " plant channel 2".

SECTION 7.2.3.4 i

The section was renumbered to reflect the new numbering sequence (Rev. 6).

There was a grammatical correction.

27

?

4 References were corrected t'o reflect the correct titles.of

" Operations and Maintenance Coordinator" and " Operational Support Center Coordinator".

SELTION 7.2.3.5 6

The section was renumbered to reflect the new numbering sequence -(Rev. 6).

There was a grammatical correction.

1 The reference to " channel 2" was corrected to " plant channel E

.1 "

s SECTION 7.2.4 The section was renumbered to reflect the new numbering sequence.(Rev. 6).

h.'"Trf W!rxnw #?.?;cM5fmacerW' gr,*ammati' cal corrections.

q97-rmyp.ex&

. s.v.mep- ~~

-.m m, _ -r. n..m T'here were~some

' ' ~ <

i Additional listing of locations for unlisted numbers was added to indicate current locations, per NRC request.

SECTION 7.2.5 The section was renumbered to reflect the new numbering

~

sequence (Rev. 6).

9 The reference to "Six telephones" was changed to " Telephones" to allow for flexibility in telephone allocation.

SECTION 7.2.6-The section was renumbered to reflect the new numbering sequence (Rev. 6).

The reference to "Six telephones" was changed to " Telephones" to allow for flexibility in telephone allocation.

There was a grammatical correction.

SECTION 7.2.6.1 The section was renumbered to reflect the new numbering sequence (Rev. 6).

SECTION 7.2.7 This section was renumbered to reflect the new numbering sequence (Rev. 6).

28 G

~

'SECTION 7.2.7.1 This section was renumbered to reflect the new numbering sequence (Rev.-6).

There was a grammatical correction.

SECTION 7.2.7.2 y-i This section was renumbered to reflect the new numbering sequence (Rev. 6).

2 -

There was a grammatical correction..

The channels were revised to reflect the correct designations.

SECTION 7.2.7.3 byn % - ;The3section yasxren,umbekednto$ reflect.sthe4new numbering sequence (Rev. 6).

A sentence was revised to reflect the change in radio channel designations.

SECTION 7.2.8 The section was. renumbered to reflect the new numbering sequence (Rev. 6).

SECTION 7.2.9 1

The section was renumbered to reflect the new numbering e

sequence (Rev. 6).

4

}

SECTION 7.2.9.1 The section was renumbered to reflect the new numbering sequence (Rev.'6).

SECTION 7.2.9.2 The section was renumbered to reflect the new numbering

. sequence (Rev. 6).

Reference was added that the HPN is installed on FTS.

SECTION 7.3.1.1 This section was revised to reflect the correct Meteorological System locations, parameters, and inspection methodology.

Reference was added to the National Weather Service as a source of additional data.

29

_~.~.-

'l

'l 9-ke i

SECTION 7.3.1.2.1 mg 7

There were grammatical and typographical corrections.

L SECTION'7.3.1.2.2 r

}e The section was revised to reflect the correct Area Radiation i

Monitoring System functions and capabilities.

j

((

'SECTION 7.3.1.3.2 M

The section was revised to reflect the correct air sample G.

analysis capabilities.

1 Il-SECTION 7.3.1.4 Y

\\

2 This section was revised to reflect the-correct personnel monitoring capabilities and methodology.

me; w nm 1 n:

p..~.

--,.. ~ <-.

^~ '

~ Word'ihg w'as~a~dded'that PICS'an'd TLDs are available.in emergency

~

k-kits and for emergency use.

F SECTION 7.3.1.5 g

9 The section was revised to reflect the correct Personnel Survey Y

Instrumentation capabilities and methodology.

Y f

The section was also revised and reworded for grammar and clarity.

3

-SECTION 7.3.1.7 Reference was added to backup analytical services being d'

available at the Oak Ridge' National Laboratory (ORNL).

't SECTION 7.3.1.8 The PASS ranges were identified.to eliminate "Laters".

Reference was added to ORNL as a backup lab.

j If Reference to power and backup power sources was added, per NRC recommendation.

SECTION 7.3.1.9 The RRIS' system locations were corrected.

The reference to " flow rates" was corrected to " flow I

indicators".

The reference to " gross radiation" was corrected to radiation.

There was a grammatical correction.

30

t.

i T

The reference.to the NDL was deleted per NRC recommendation,

F.-

since the NDL has not be'en completely defined.

SECTION 7.3.1.10

.c There were grammatical corrections.

.?

E SECTION 7.3.1.12_

y.

Reference to power and backup power sources was added, per NRC

[

request.

k - - - - --

SECTION 7.3.2 sl;L Reference to Field Monitoring Kits was added.

' Reference to TETA cartridges was added.

section..was revised to. reflect,.the.. current.TLD and., air.

.x3,,% q, Tit"'*PETGy;;y.Then 'ing network,.

samp1 7

5 The reference to " gross gamma radiation" was changed to l

" radiation exposure level".

SECTION 7.5 The,section was revised to give descriptions of each decontamination facility per NRC request.

TABLE _7-2 Radiation Monitor ranges were added, per NRC request.

TABLE 7-3 6

Radiation Monitor ranges were added per NRC request.

TABLE 7-4 Radiation Monitor ranges were added per NRC request.

TABLE 7-5 Radiation Monitor ranges were added per NRC request.

The wide Range Gas Monitor type.was corrected to " Beta / Gamma".

TABLE 7-6

' Additional monitors were added.

Radiation monitor ranges were added per NRC request.

31 H

v-*

m w

g.:

.p FIGURE 7-2

~

The RMS Panel location was added.

FIGURE 7-5, The Figure was revised to reflect the current HP Access Control g

Area layout.

' '[,.

FIGURES 7-7A and 7-7B These figures reflect the current Radiological Air Sampling u

Network.

s i

b f.

P 9

32

e i

. CHAPTER 8 The Chapter was revised to reflect the consolidation of the callaway Radiological Emergency Preparedness Program under the Manager, Nuclear Safety and Emergency Preparedness.

+

SECTION 8.1.

l This.section was revised to reflect the current training program organization.

SECTION 8.1.1 The section was rev'ised to reflect the current training program as defined by.the Callaway Plant Training Manual.

The specific training responsibilities of the Superintendent, Training and Supervisor, Emergency Pr,eparedness were also delineated.

S ECTION,.8..l.1.1,

.m

m. 3 This section was revised to reflect the current Essential Personnel Training Program including clarification that personnel will receive training specific to emergency positions.

SECTION 8.1.1.2 This section was revised to reflect the current GET Trair.ing Program.

SECTION 8.1.1.3 The title was added to this section.

l SECTION 8.1.2 This section'was revised to reflect the current Off-Site Training Program.

SECTION 8.1.3 l

The title was changed to be more appropriate to the section content.

SECTIOi! 8.1.4 The title was changed to be consistent with the Public Information' Plan.

The informational booklet content was revised to reflect

-current information.

Specific transient locations were deleted per request of off-site authorities.

l g

33

_ _ -..-~,_-.___._ _.-,

l SECTION 8.2

'1 This section was revised to reflect the current Drills and Exercise Program.

More emphasis was added to the critique process.

The responsibility for corrective actions was changed to the Supervisor, Emergency Preparedness.

Reference was added to unannounced drills and drills under varying weather conditions, per NRC recommendation.

SECTION 8.3 This section was revised to reflect organizational changes.

The Manager, Nuclear Safety and Emergency Preparedness was given the responsibility for the RERP.

The Manager, Callaway Plant was given the responsibility for

..5 reviewing and approving the RERP and its implementing procedures.

The NSRB's responsibility for an " independent" audit was clarified.

SECTION 8.4 This section was revised to clarify the revision methodology.

The Manager, NSEP was given the responsibility for informing personnel of the RERP, procedures, and changes.

SECTION 8.5 Criteria as to when emergency equipment kits are to be j

inspected was specified.

A paragraph was added clarifying equipment calibration, per NRC request.

34

i m.

CHAPTER 9 SECTION 9.1, Per NRC request, reference was added to notifying the NRC of the intent to declare Recovery.

The section was revised to ref)ect the Recovery Manager's and Emergency Coordinator's responsibilities for establishing and directing the Recovery Organization.

SECTION 9.2.1

" Nuclear" was added after the Vice President to specify which Vice President.

SECTION 9.2.4 i

...~.g. Grammatical corrections.

SECTION 9.2.8 l

Recovery Manager approval of news releases was changed to information for news releases.

.SECTION 9.5 Deleted generic references to procedures..

Corrected a typo and a grammatical error.

i SECTION 9.6 Reference was added to-the manual dose assessment procedures.

i i

35

.7

--,. ~

,