ML20081K882: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:> | {{#Wiki_filter:> | ||
a sco t | a sco t | ||
O intt'a. | ,,c.,,o,, | ||
F. p | O intt'a. | ||
,c ic.-. | |||
F. | |||
1 D Woodard | p | ||
m, | .,+,n,,,,. | ||
I' r A a | |||
Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, DC 20555 Joseph A. Farley Nuclear Plant Extension for P.esponse to Technical Specification Guidance Relating to Operating Personnel Vork Schedules Gentlemen: | i m | ||
By a {{letter dated|date=May 24, 1991|text=letter dated May 24, 1991}}, the NRC provided to Alabama Power Company a backfit analysis pursuant to 10 CFR 50.109(a)(4) in support of a requirement to modify the work schedules of operating personnel as limited by Technical Specification 6.2.2.f. The Nnc requested a response to the {{letter dated|date=May 24, 1991|text=May 24, 1991 letter}} within 30 days. | 1 D Woodard | ||
Such a change may have an impact upon plant staffing requirements, outage planning, and labor telations. | / Mill)ilillil POWt'l~ | ||
( | m, m. | ||
June 25. 1991 | |||
+. | |||
,n Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, DC 20555 Joseph A. Farley Nuclear Plant Extension for P.esponse to Technical Specification Guidance Relating to Operating Personnel Vork Schedules Gentlemen: | |||
By a {{letter dated|date=May 24, 1991|text=letter dated May 24, 1991}}, the NRC provided to Alabama Power Company a backfit analysis pursuant to 10 CFR 50.109(a)(4) in support of a requirement to modify the work schedules of operating personnel as limited by Technical Specification 6.2.2.f. | |||
The Nnc requested a response to the {{letter dated|date=May 24, 1991|text=May 24, 1991 letter}} within 30 days. | |||
Dut to the complexity of this issue an extension of an additional 60 days was requested via a telephone conversation held on June 18, 1991 between Mr. J. E. Garlington for Alabama Power Company and Mr. S. T. Hofiman, NRC Project Miinager. The 60-day extension is needed to properly evaluate the effect of the NRC's interpretation of Technical Specification 6.2.2.f upon plant operation. | |||
Such a change may have an impact upon plant staffing requirements, outage planning, and labor telations. | |||
In addition, Alabama Power Cempany is | |||
( | |||
conducting an industry survey to determine how other utilities are implementing their overtime policy and to what job classifications overtime limitations are being applied. | |||
This extension should have no effect on implementation of the NRC's requirement since the next scheduled outage for either unit will not begin until March 1992. | |||
The 60-day extension was granted by Mr. Iloffman during a subsequent telephone conversation held later in the day of June 18, 1991. | The 60-day extension was granted by Mr. Iloffman during a subsequent telephone conversation held later in the day of June 18, 1991. | ||
If there are any questions, please advise. | If there are any questions, please advise. | ||
Respectfully submitted. | Respectfully submitted. | ||
3 e | N 3 e | ||
_ ;ITE i -- e | |||
'J.qjVoodatd D | |||
JDV/BHV: map 0460 cci | JDV/BHV: map 0460 cci Mr. S. D. Ebneter | ||
FDR | ,l Mr. S. T. Hoffman Mr. G. F. Maxvell l | ||
9107020099 910625 FDR ADOC K 0500M4c, j { ''l | |||
,a p | |||
PDR | |||
_ _}} | _ _}} | ||
Latest revision as of 07:44, 14 December 2024
| ML20081K882 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/25/1991 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9107020099 | |
| Download: ML20081K882 (1) | |
Text
>
a sco t
,,c.,,o,,
O intt'a.
,c ic.-.
F.
p
.,+,n,,,,.
I' r A a
i m
1 D Woodard
/ Mill)ilillil POWt'l~
m, m.
June 25. 1991
+.
,n Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, DC 20555 Joseph A. Farley Nuclear Plant Extension for P.esponse to Technical Specification Guidance Relating to Operating Personnel Vork Schedules Gentlemen:
By a letter dated May 24, 1991, the NRC provided to Alabama Power Company a backfit analysis pursuant to 10 CFR 50.109(a)(4) in support of a requirement to modify the work schedules of operating personnel as limited by Technical Specification 6.2.2.f.
The Nnc requested a response to the May 24, 1991 letter within 30 days.
Dut to the complexity of this issue an extension of an additional 60 days was requested via a telephone conversation held on June 18, 1991 between Mr. J. E. Garlington for Alabama Power Company and Mr. S. T. Hofiman, NRC Project Miinager. The 60-day extension is needed to properly evaluate the effect of the NRC's interpretation of Technical Specification 6.2.2.f upon plant operation.
Such a change may have an impact upon plant staffing requirements, outage planning, and labor telations.
In addition, Alabama Power Cempany is
(
conducting an industry survey to determine how other utilities are implementing their overtime policy and to what job classifications overtime limitations are being applied.
This extension should have no effect on implementation of the NRC's requirement since the next scheduled outage for either unit will not begin until March 1992.
The 60-day extension was granted by Mr. Iloffman during a subsequent telephone conversation held later in the day of June 18, 1991.
If there are any questions, please advise.
Respectfully submitted.
N 3 e
_ ;ITE i -- e
'J.qjVoodatd D
JDV/BHV: map 0460 cci Mr. S. D. Ebneter
,l Mr. S. T. Hoffman Mr. G. F. Maxvell l
9107020099 910625 FDR ADOC K 0500M4c, j { l
,a p
_ _