D Commonwrith Edison
* D Commonwrith Edison ) One First Nabonal Plaza. Chicago. Ilknois C'     Address Reply to. Post Office Box 767 Chicago, Illinois 60690 April 11, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC                         20555
) One First Nabonal Plaza. Chicago. Ilknois R
C' Address Reply to. Post Office Box 767 Chicago, Illinois 60690 April 11, 1984 Mr. Harold R.
Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555


==Subject:==
==Subject:==
Line 28: Line 30:


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
References (a) and (b) requested Licensees and Applicants to review controls for handling of heavy loads.
References (a) and (b) requested Licensees and Applicants to review controls for handling of heavy loads. References (c) thru (g) documented our review and response. References (h) and (1) are draft Phase I and Phase II Technical Evaluation Reports (TERs) by EG&G Idaho, Inc. with References (i) and (n) documenting our review and response to the TERs.
References (c) thru (g) documented our review and response.
On April 6,         1984 a telecon was held between NRC, EG&G, Idaho and Commonwealth Edison to discuss our Reference (1) and (n) submittals.                                             As a result of this discussion, it was determined that one item of information relative to Section 2.3.4C of our Phase I response should be provided.                     Following is our response to that information request.
References (h) and (1) are draft Phase I and Phase II Technical Evaluation Reports (TERs) by EG&G Idaho, Inc. with References (i) and (n) documenting our review and response to the TERs.
On April 6, 1984 a telecon was held between NRC, EG&G, Idaho and Commonwealth Edison to discuss our Reference (1) and (n) submittals.
As a result of this discussion, it was determined that one item of information relative to Section 2.3.4C of our Phase I response should be provided.
Following is our response to that information request.
Westinghouse is a recognized Company within the nuclear industry.
Westinghouse is a recognized Company within the nuclear industry.
Westinghouse used standard quality control proceoures in the fabrication of the reactor vessel head lift rig and reactor internals lift rig.
Westinghouse used standard quality control proceoures in the fabrication of the reactor vessel head lift rig and reactor internals lift rig.
Should you or your staff have any further questions, please contact this office.
Should you or your staff have any further questions, please contact this office.
Respectfully, k b, h w ':'         -
Respectfully, k b, h w ':'
P. L. Barnes Nuclear Licensing Administrator 1m cc:                     J. G. Keppler - RIII RIII Inspector - BY/8W L. Olshan - LB1 J. Stevens - LB1 T. Stickley - EG&G 8404170343 840411 3D 00l PDR ADOCK 05                 54 8457N                                                                                                        iO
P. L. Barnes Nuclear Licensing Administrator 1m cc:
J. G. Keppler - RIII RIII Inspector - BY/8W L. Olshan - LB1 J. Stevens - LB1 T. Stickley - EG&G D3 00l 8404170343 840411 8457N PDR ADOCK 05 54 iO


5                                 '
5 s
s e     ,
e ATTACHMENT A References - Byron and Braidwood Dockets (a):
ATTACHMENT A References - Byron and Braidwood Dockets (a):   D. G. Eisenhut letter to All Licensees dated December 22, 1980 (TJR 81-9)
D. G. Eisenhut letter to All Licensees dated December 22, 1980 (TJR 81-9)
(b):   D. G. Eisenhut letter to All Licensees dated February 3,.1981 - Generic Letter 81-07 (TJR 81-40)
(b):
(c):   J. S. Abel letter to D. G. Eisenhut dated May 15, 1981 (TJR 81-93)
D. G. Eisenhut letter to All Licensees dated February 3,.1981 - Generic Letter 81-07 (TJR 81-40)
(d):   E. D. Swartz letter to D. G. Eisenhut dated June 22, 1981 (EDS 81-10)
(c):
(e):   T. R. Tramm letter to H. R. Denton dated December 24, 1981 (TRT 81-334)
J. S. Abel letter to D.
(f):   T. R. Tramm letter to H. R. Denton dated February 5, 1982 (TRT 82-36)
G. Eisenhut dated May 15, 1981 (TJR 81-93)
(g):   T. R. Tramm letter to H. R. Denton dated April 7, 1982 (TRT 82-83)
(d):
(h):   B. J. Youngblood letter to H. R. Denton dated August 2, 1982 (TRT 82-160)
E. D. Swartz letter to D. G. Eisenhut dated June 22, 1981 (EDS 81-10)
(1):   T. R. Tramm letter to H. R. Denton dated October 25, 1982 (TRT 82-223)
(e):
(j):   E. D. Swartz letter to H. R. Denton dated April 26, 1983 (EDS 83-159)
T. R.
(k):   T. R. Tramm letter to H.'R. Denton dated June'17, 1983 (TRT 83-173)
Tramm letter to H.
(1):   Draft Phase II Technical Evaluation Report published July 1983 (m):   T. R. Tramm letter to H. R. Denton dated November 7, 1983 (NL-83-0565)-
R. Denton dated December 24, 1981 (TRT 81-334)
(n):   P. L. Barnes letter to H. R. Denton dated December 2, 1983 (NL-83-0609)
(f):
L (m):   P. L. Barnes letter to H. R. Denton dated February 10, 1984 (NL-84-0166)
T. R. Tramm letter to H.
I 8457N
R. Denton dated February 5, 1982 (TRT 82-36)
____________m}}
(g):
T. R.
Tramm letter to H. R. Denton dated April 7, 1982 (TRT 82-83)
(h):
B. J. Youngblood letter to H.
R. Denton dated August 2, 1982 (TRT 82-160)
(1):
T. R. Tramm letter to H.
R. Denton dated October 25, 1982 (TRT 82-223)
(j):
E. D. Swartz letter to H. R. Denton dated April 26, 1983 (EDS 83-159)
(k):
T. R. Tramm letter to H.'R.
Denton dated June'17, 1983 (TRT 83-173)
(1):
Draft Phase II Technical Evaluation Report published July 1983 (m):
T. R. Tramm letter to H. R. Denton dated November 7, 1983 (NL-83-0565)-
(n):
P.
L. Barnes letter to H. R. Denton dated December 2, 1983 (NL-83-0609)
L (m):
P. L. Barnes letter to H. R. Denton dated February 10, 1984 (NL-84-0166)
I 8457N m}}

Latest revision as of 05:29, 14 December 2024

Responds to 840406 Telcon Request to Provide Info Re Section 2.3.4C of Phase I Response Concerning Resolution of Control of Heavy Loads,Per DG Eisenhut & Generic Ltr 81-07.Westinghouse Std QC Procedures Used
ML20083L723
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 04/11/1984
From: Barnes P
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR 8457N, GL-81-07, GL-81-7, NUDOCS 8404170343
Download: ML20083L723 (2)


Text

s e

D Commonwrith Edison

) One First Nabonal Plaza. Chicago. Ilknois R

C' Address Reply to. Post Office Box 767 Chicago, Illinois 60690 April 11, 1984 Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Supplemental Information to the Resolution of " Control of Heavy Loads at Nuclear Power Plants" NRC Docket Nos. 50-454/455, 50-456/457

References:

See Attachment A

Dear Mr. Denton:

References (a) and (b) requested Licensees and Applicants to review controls for handling of heavy loads.

References (c) thru (g) documented our review and response.

References (h) and (1) are draft Phase I and Phase II Technical Evaluation Reports (TERs) by EG&G Idaho, Inc. with References (i) and (n) documenting our review and response to the TERs.

On April 6, 1984 a telecon was held between NRC, EG&G, Idaho and Commonwealth Edison to discuss our Reference (1) and (n) submittals.

As a result of this discussion, it was determined that one item of information relative to Section 2.3.4C of our Phase I response should be provided.

Following is our response to that information request.

Westinghouse is a recognized Company within the nuclear industry.

Westinghouse used standard quality control proceoures in the fabrication of the reactor vessel head lift rig and reactor internals lift rig.

Should you or your staff have any further questions, please contact this office.

Respectfully, k b, h w ':'

P. L. Barnes Nuclear Licensing Administrator 1m cc:

J. G. Keppler - RIII RIII Inspector - BY/8W L. Olshan - LB1 J. Stevens - LB1 T. Stickley - EG&G D3 00l 8404170343 840411 8457N PDR ADOCK 05 54 iO

5 s

e ATTACHMENT A References - Byron and Braidwood Dockets (a):

D. G. Eisenhut letter to All Licensees dated December 22, 1980 (TJR 81-9)

(b):

D. G. Eisenhut letter to All Licensees dated February 3,.1981 - Generic Letter 81-07 (TJR 81-40)

(c):

J. S. Abel letter to D.

G. Eisenhut dated May 15, 1981 (TJR 81-93)

(d):

E. D. Swartz letter to D. G. Eisenhut dated June 22, 1981 (EDS 81-10)

(e):

T. R.

Tramm letter to H.

R. Denton dated December 24, 1981 (TRT 81-334)

(f):

T. R. Tramm letter to H.

R. Denton dated February 5, 1982 (TRT 82-36)

(g):

T. R.

Tramm letter to H. R. Denton dated April 7, 1982 (TRT 82-83)

(h):

B. J. Youngblood letter to H.

R. Denton dated August 2, 1982 (TRT 82-160)

(1):

T. R. Tramm letter to H.

R. Denton dated October 25, 1982 (TRT 82-223)

(j):

E. D. Swartz letter to H. R. Denton dated April 26, 1983 (EDS83-159)

(k):

T. R. Tramm letter to H.'R.

Denton dated June'17, 1983 (TRT 83-173)

(1):

Draft Phase II Technical Evaluation Report published July 1983 (m):

T. R. Tramm letter to H. R. Denton dated November 7, 1983 (NL-83-0565)-

(n):

P.

L. Barnes letter to H. R. Denton dated December 2, 1983 (NL-83-0609)

L (m):

P. L. Barnes letter to H. R. Denton dated February 10, 1984 (NL-84-0166)

I 8457N m