. NORTHEAST UTILIT1ES o.n r.i Oum. seio a so++t e.'on cona*cocu 4 ce u +.w..... w...
l
i
        . NORTHEAST                                     UTILIT1ES 4 ce u + .w .. ... w ...
.is im.u : = i s.u m-**.
o.n r.i Oum . seio a so++t e.'on cona*cocu i
P O BOX 270
                                    .is im .u : = i s.u                           m-**.                                                                               P O BOX 270
+x.*'s. ':w (Ma*'
                                    +x .*'s. ':w (Ma*'                                                                                                                 HARTFORD. CONNECTICUT 061410270                             i ea. .c .w e m .<e           w*'***',
HARTFORD. CONNECTICUT 061410270 i
ww.e .,x.n a i,,w w=*                                                                                                             (203) 66H000                                                I I
ea..c.w e m.<e w*'***',
December 10, 1991 MI'-91-1028 Re:     10CPR50.71(a) l U S. Nuclear Regulatory Commission Doctunent Control Desk Washington. D. C. 20555
(203) 66H000 ww.e.,x.n a i,,w w=*
December 10, 1991 MI'-91-1028 Re:
10CPR50.71(a) l U S. Nuclear Regulatory Commission Doctunent Control Desk Washington. D. C. 20555


==Reference:==
==Reference:==
Facility Operating License No. DPR 65 Docket No. 50 336 l
Facility Operating License No. DPR 65 Docket No. 50 336


==Dear Sir:==
==Dear Sir:==
 
This letter is forwarded to provide the report of operating and shutdown experience relating to M111stono Unit 2 for the month of November, 1991, in accordance with Appendix A Technical Specifications, Section 6.9.1.6.
This letter is forwarded to provide the report of operating and shutdown experience relating to M111stono Unit 2 for the month of November, 1991, in accordance with Appendix A Technical Specifications, Section 6.9.1.6.                                                                                                           One                               j additional copy of the report is enclosed.
One j
Very truly yours, NORTilEAST NUCLEAR ENERGY COMPANY
additional copy of the report is enclosed.
                                                                                                                                                                /        f t.             (rcu
Very truly yours, NORTilEAST NUCLEAR ENERGY COMPANY f t.
                                                                                                                                                            . Stephen E. Scaco Station Director Millstone Nuclear Power Station SES/CN c: T. T. Martin, Region I Administrator                                                                                                                                                                           l C. S. Vissing, URC Project Manager, Millstone Unit No. 2 V. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2 6 3 l
(rcu
                                                                                                                                                                                                                                  .I i
/
l 9112170008 ppR                ADOCK 9111?O_6     050023g
'. Stephen E. Scaco Station Director Millstone Nuclear Power Station SES/CN c: T. T. Martin, Region I Administrator C. S. Vissing, URC Project Manager, Millstone Unit No. 2 V. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2 6 3
          .R                                             PDn hSY rp
.I l
9112170008 9111?O_6 ppR ADOCK 050023g PDn
.R hSY rp


(
(
                              .                                                        +
+
                                                        .                                                OPEPATING DATA ItEPORT DOCP.ET NO.             ,,,1Qd 6 . _       m DATE _lliQfdL COMPLETED BY J J ]ri gn._ _ ,
OPEPATING DATA ItEPORT DOCP.ET NO.
,,,1Qd 6. _
m DATE _lliQfdL COMPLETED BY J J ]ri gn._ _,
TELEPHONE _ R !)1 L y d l l21 EXT. Js)).
TELEPHONE _ R !)1 L y d l l21 EXT. Js)).
QPERATING STATUS Notes: Iums 21 and 22
QPERATING STATUS Notes: Iums 21 and 22 1.
: 1.                           Unit Name:                                                 Millstone Unit 2                                     cumulative are volghte.i
Unit Name:
: 2.                           Reporting Period:             ,.                            N,22e:tber 1991                                   averages. Unit operated
Millstone Unit 2 cumulative are volghte.i 2.
: 3.                             Licensed Thermal Power (MWt):                                         2700                                     or 2560 MUTil prior to ita Nameplate Rating (Cross MVe)-
Reporting Period:
: 4.                                                                                                    009                                     uprating to the current
N,22e:tber 1991 averages. Unit operated 3.
: 5.                           Design Electrical Rating (Net MWe):                                   870                                     2700 MVTil power level;
Licensed Thermal Power (MWt):
: 6.                           Maximum Depet.dable Capacity (Cros: MUe):                               893.83                                                           =-           --=
2700 or 2560 MUTil prior to ita 4.
: 7.                           Maximum Dependable Capacity (Net MVe):                                 862.88
Nameplate Rating (Cross MVe)-
: 8.                             If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
009 uprating to the current 5.
Design Electrical Rating (Net MWe):
870 2700 MVTil power level; 6.
Maximum Depet.dable Capacity (Cros: MUe):
893.83
=-
--=
7.
Maximum Dependable Capacity (Net MVe):
862.88 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Vhich Restricted. If any (Net MVe):
N/A
N/A
: 9.                            Power Level To Vhich Restricted. If any (Net MVe):                                                  __  N/A                -_
: 10. Reacc,ns For Restrictions, If Any:
: 10. Reacc,ns For Restrictions, If Any:                                                           N/A This Month                       Yr. To Date                 Cumulative
N/A This Month Yr. To Date Cumulative
: 11. !!ours In Reporting Period                                                                           ._._.720.0                           8016.0                   .
: 11. !!ours In Reporting Period
139656.0
._._.720.0 8016.0 139656.0
: 12. Number Of Hours Reactor Vas Crit!. cal                                                                                     126.8           5032.3                         101944.9
: 12. Number Of Hours Reactor Vas Crit!. cal 126.8 5032.3 101944.9
: 13. Reactor Reserve Shutdown llours                                                                                               03                     0 . ';                 2@j
: 13. Reactor Reserve Shutdown llours 03 0. ';
: 14. Hours Generator On-Line                                                                                                   126.8           4742.3                           97086.1
2@j
: 15. Unit Reserve Shutdown Hours                                                                                               _f)LQ                     0.0                       468.2 16 Cross Thermal Energy Generated (MVil)                                                                                   342421J       12}DMJ3_A                     267361583.4
: 14. Hours Generator On-Line 126.8 4742.3 97086.1
: 11. Cross Electrical Energy Generated (!NH)                                                                               114663.Q       4085139.0_ _                   8 Dl4838. 5
: 15. Unit Reserve Shutdown Hours
: 18. Net Electrical Energy Generated (!NH)                                                                                 104620J         3901692.0_                     78202741.5
_f)LQ 0.0 468.2 16 Cross Thermal Energy Generated (MVil) 342421J 12}DMJ3_A 267361583.4
: 19. Unit Service Factor                                                                                                       17.6                   59.2                         69.5
: 11. Cross Electrical Energy Generated (!NH) 114663.Q 4085139.0_ _
: 20. Unit Availability Factor                                                                                                   17 1                   59.2                         69.9
8 Dl4838. 5
: 21. Unit Capacity Factor (Using MDC Net)                                                                                       16.B                   $ 6 ._4 ;                   65.7
: 18. Net Electrical Energy Generated (!NH) 104620J 3901692.0_
: 22. Unit Capacity Factor (Using DER Net)                                                                                       16.7                   55.9                         64.5
78202741.5
: 23. Unit Forced Outage Rate                                                                                                   82.4                   40.6                         15.1 24 Shutdowns Scheduled Over Next 6 Months (Ty'pe, Date, and Duration of Each):                                                                                           EOC 11 Refuel and Steam Generator Replacement Outage. Anr11 - 1992. 160 days.
: 19. Unit Service Factor 17.6 59.2 69.5
: 25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:                                                                                         12/11/91
: 20. Unit Availability Factor 17 1 59.2 69.9
: 21. Unit Capacity Factor (Using MDC Net) 16.B
$ 6._4 ;
65.7
: 22. Unit Capacity Factor (Using DER Net) 16.7 55.9 64.5
: 23. Unit Forced Outage Rate 82.4 40.6 15.1 24 Shutdowns Scheduled Over Next 6 Months (Ty'pe, Date, and Duration of Each):
EOC 11 Refuel and Steam Generator Replacement Outage. Anr11 - 1992. 160 days.
: 25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:
12/11/91
: 26. Units In Test Status (Prior to Commercial Operation):
: 26. Units In Test Status (Prior to Commercial Operation):
Forecast                 Achieved INITIAL CRITICALITY                                                                             N/A                 N/A INITIAL ELECTRICITY                                                                             N/A                 N/A COMMERCIAL OPERATION                                                                             N/A             _,,J / A
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A
_,,J / A


AVEPAGE DAILY UNIT POWER LEVEL DOCKET NO.       _1Q-13 6 UNIT:       _1R Unt_one Unit 2 DATEt       12/06/91 COMPLETED BY:       _ U leron TELEFHONE:         (203) 447-1791 EXT:       4417 MONTH:     NOVDiBER 1991 DAY     AVG. DAILY F0Vr.R II. VEL                                                                                           DAY     AVG. DAILY POVER LEVEL (MVe-Net)                                                                                                                   (MVe-Net) 1                 874                                                                                                       17                 0 2                 873                                                                                                       18                 0 3                 873                                                                                                       19                 f, 4                 873                                                                                                       20                 0 5                 874                                                                                                       21                 0 6                 226               .                                                                                        22                 0 7                     0                                                                                                       23                 0 8                   0                                                                                                       2t                 0 9                   0                                                                                                       25                 0 10                   0                                                                                                       26                 0 11                   0                                                                                                       27                 0 12                   0                                                                                                       28                 0 13                 0                                                                                                       29                 0 14                 0                                                                                                       30                   0 15                   0                                                                                                       31                   -
AVEPAGE DAILY UNIT POWER LEVEL DOCKET NO.
16                   0 INSTRUCTIONS On this format, list the average daily unit power level in MVe Net for each day in the reporting month,                                 Compute to the nearest whole megawatt.
_1Q-13 6 UNIT:
_1R Unt_one Unit 2 DATEt 12/06/91 COMPLETED BY:
_ U leron TELEFHONE:
(203) 447-1791 EXT:
4417 MONTH:
NOVDiBER 1991 DAY AVG. DAILY F0Vr.R II. VEL DAY AVG. DAILY POVER LEVEL (MVe-Net)
(MVe-Net) 1 874 17 0
2 873 18 0
3 873 19 f,
4 873 20 0
5 874 21 0
6 226 22 0
7 0
23 0
8 0
2t 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 16 0
INSTRUCTIONS On this format, list the average daily unit power level in MVe Net for each day in the reporting month, Compute to the nearest whole megawatt.
l
l


+
+
DOCKET $50.                                   50-336                                   '
DOCKET $50.
4 UNIT SHITTDOWS AND POWiiR REDUCTIONS .                                   UNIT NAME                                   Millstone 2                                 '
50-336 UNIT SHITTDOWS AND POWiiR REDUCTIONS.
DATE                                   12/06/91                                       .
UNIT NAME Millstone 2 4
COMPLCTED BY.                                   G. Neron
DATE 12/06/91 COMPLCTED BY.
* l'                                                                                                                                                                                 TELEPHONE                                     (203) 447-1791 REPORT HONTH   NOVEMBER 1901                                           EXT.-                               4417                                     .
G. Neron l'
No.      Date           Type l-      Duration                   Reason2      Method of       License             Systgn           Compgnent       Cause & Corrective (flours)                                 Shutting         Event               Code             Code                                   Action to
TELEPHONE (203) 447-1791 REPORT HONTH NOVEMBER 1901 EXT.-
,                                                                                                                    Down Reactor3    Report #                                                 Prevent Recurrence T
4417 l-2 No.
                                    . 10       911106             F             593.2                     A                 2         91-012                     SN           PSF         on November 6. 1991, with the unit opera-
Date Type Duration Reason Method of License Systgn Compgnent Cause & Corrective (flours)
!                                                                                                                                                                                            ting at 100t power, a drain line (eight inch pipe) from the first stage re-4 heater drain tank no. 1B .t_2 the IB high pressure feed-water heater ruptured. Control cperators obsereed control room instrumentation to determine the affects on plant systems. In addition, the steam discharging into l                                                                                                                                     the turbine building caused activation of numerous alarms
Shutting Event Code Code Action to 3
,                                                                                                                                      in the control room. A manual reactor trip was then i
Down Reactor Report #
Prevent Recurrence T
. 10 911106 F
593.2 A
2 91-012 SN PSF on November 6. 1991, with the unit opera-ting at 100t power, a drain line (eight inch pipe) from the first stage re-heater drain tank no. 1B.t_2 the IB high pressure feed-4 water heater ruptured. Control cperators obsereed control room instrumentation to determine the affects on plant systems.
In addition, the steam discharging into l
the turbine building caused activation of numerous alarms in the control room.
A manual reactor trip was then i
ordered, based upcn control room alarms and indications.
ordered, based upcn control room alarms and indications.
A NDE inspection progran, of turbine building and
A NDE inspection progran, of turbine building and auxiliary building secondary plant piping was init'.ted and expanded to include the EPRI CHr.CMATE inspection program. The plant remains shutdown and inspections are engoing at this time.
,                                                                                                                                      auxiliary building secondary plant piping was init' .ted and expanded to include the EPRI CHr.CMATE inspection
See LER.
,                                                                                                                                      program. The plant remains shutdown and inspections are engoing at this time. See LER.
1 I-i
1 I-i                                                 .
' Reason:
!                                        F: Forced                  ' Reason:                                                         ' Method                                 ' Exhibit G - Instructions j                                       S: Scheduled                 A-Equipment Failure (Explain)                                     1-Manual                                 for Preparation of Data i                                                                     B-Maintenance or Test                                             2-Manual Scram                           Entry Sheets for License i                                                                     C-Refueling                                                       3-Automatic Scram                         Event Report (LER) File                                                                       '
' Method
i                                                                      D-Regulatcry Restriction                                           4-Continued from                         (NUFEG-0161) l                                                                     E-Operator Training & License Examination                           Previous month 5
' Exhibit G - Instructions F:
l                                                                     F-Administrative                                                   5-Power Reduction                           Exhibit 1 -Same Source
Forced j
;                                                                      G-Cperational Error-(r.xplain)                                       (Duration -0) j                                                                     H- Other (Explain)                                                 6-Other (Explain) l l
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i
B-Maintenance or Test 2-Manual Scram Entry Sheets for License i
C-Refueling 3-Automatic Scram Event Report (LER) File i
D-Regulatcry Restriction 4-Continued from (NUFEG-0161) l E-Operator Training & License Examination Previous month 5
l F-Administrative 5-Power Reduction Exhibit 1 -Same Source G-Cperational Error-(r.xplain)
(Duration -0) j H-Other (Explain) 6-Other (Explain) l l
i t
i t
,                      n._  ...-  ,e       . _
n.
                                                                .e,             ,  - . -                  .. ,    ,  ,.,,,n.               . _ _ . , _  , . . _ .__ _ _        -        _ - _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _
,e
.e,
,.,,,n.


REFUELING IllFORMATIOli REQU.13T
REFUELING IllFORMATIOli REQU.13T 1.
: 1.     Name of facility:                                     lilllaigne 2
Name of facility:
: 2.     Scheduled dato for next refueling shutdown:                                                                   .Aoril, 1292
lilllaigne 2 2.
: 3.     Scheduled date for restart following refueling:                                                                           ..H/ A
Scheduled dato for next refueling shutdown:
: 4.     Will refueling or resumption of oporation thereafter require a technical spe 4.fication change or other licenso amendment?
.Aoril, 1292 3.
Nono at this timo
Scheduled date for restart following refueling:
: 5.     Scheduled date(s) for submitting licensing action and supporting informations yone
..H/ A 4.
: 6.       Important licensing considorations associated with rofueling, e.g.,
Will refueling or resumption of oporation thereafter require a technical spe 4.fication change or other licenso amendment?
Nono at this timo 5.
Scheduled date(s) for submitting licensing action and supporting informations yone 6.
Important licensing considorations associated with rofueling, e.g.,
now or different fuel design or supplier, unroviewed design or performanco analysis methods, significant changos in fuel design, now operating procedures:
now or different fuel design or supplier, unroviewed design or performanco analysis methods, significant changos in fuel design, now operating procedures:
M11Lstone 2 will.be replacina the Steam Generator sub-assemblies dur: na the up.gominc _Qnd of Cyg.le 11 ref.uglina outage.                                                                           It is R qipated this will be accomollahed under 10CFR 50.59.
M11Lstone 2 will.be replacina the Steam Generator sub-assemblies dur: na the up.gominc _Qnd of Cyg.le 11 ref.uglina outage.
: 7.     The number of fuel assemblics (a) in the coro and (b) in the spent                                                                                                             '
It is R qipated this will be accomollahed under 10CFR 50.59.
fuel storago pool In Cores                 (a)                 all                                   In Spent Fuel Pools         (b)     112
7.
                                                                                                                                                                                              ~
The number of fuel assemblics (a) in the coro and (b) in the spent fuel storago pool In Cores (a) all In Spent Fuel Pools (b) 112
~
liq?E: "hfED_ numbers recrop3nt the total f ug l a s semblign. 3ni_g.g. ag.gl-
liq?E: "hfED_ numbers recrop3nt the total f ug l a s semblign. 3ni_g.g. ag.gl-
_ _ .-      ~dat t fdtgl Eigrage boxes in the.ge two (a) Item Centrol Ar_ tag
~dat t fdtgl Eigrage boxes in the.ge two (a) Item Centrol Ar_ tag 0.
: 0.     The present licensed spent fuel pool storago capacity and the sizo
The present licensed spent fuel pool storago capacity and the sizo
              -of any increase in licensed storage capacity that has been requested or is planned, in number of fuel ascomblios:
-of any increase in licensed storage capacity that has been requested or is planned, in number of fuel ascomblios:
Currentiv 12.77 9 .. The projected date of the last refueling that can bo discharged to the spent fuel pool assuming the present licensed capacity:
Currentiv 12.77 9..
The projected date of the last refueling that can bo discharged to the spent fuel pool assuming the present licensed capacity:
129.1,_. Spent.J.us) Pool Full, core off load capacity is reached 'With-
129.1,_. Spent.J.us) Pool Full, core off load capacity is reached 'With-
              -out consolidation 1.                                                                                                                                   __
-out consolidation 1.
1998. _ Coro Fulb. Jngat_fgel Poollull .                                                                   _
1998. _ Coro Fulb. Jngat_fgel Poollull.
2009, Snont Fuel Pool Full, core off load capacity is reached-contingent upon_ full scale storage of consolldated_Lu21 in tho'                                                                                                             ,,
2009, Snont Fuel Pool Full, core off load capacity is reached-contingent upon_ full scale storage of consolldated_Lu21 in tho' Spent Fuel Pool.
Spent Fuel Pool.                                 . - _ _ _
i l.
i l.
l
l
  -__            __          . . - - , . . _ . . _ _ _ . _ _ - , _ , - , _ . , _ - . . - , _ - _ . . . .                    _ _ , _ .        - - . . _ - - _ . . . _ _ , , , . _ - _ .-}}
- -.. _ - - _... _ _,,,. _ - _.-}}

Latest revision as of 01:52, 14 December 2024

Monthly Operating Rept for Nov 1991 for Millstone Unit 2.W/
ML20086L582
Person / Time
Site: Millstone 
Issue date: 11/30/1991
From: Neron G, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-91-1028, NUDOCS 9112170008
Download: ML20086L582 (5)


Text

_

i o

. NORTHEAST UTILIT1ES o.n r.i Oum. seio a so++t e.'on cona*cocu 4 ce u +.w..... w...

i

.is im.u : = i s.u m-**.

P O BOX 270

+x.*'s. ':w (Ma*'

HARTFORD. CONNECTICUT 061410270 i

ea..c.w e m.<e w*'***',

(203) 66H000 ww.e.,x.n a i,,w w=*

December 10, 1991 MI'-91-1028 Re:

10CPR50.71(a) l U S. Nuclear Regulatory Commission Doctunent Control Desk Washington. D. C. 20555

Reference:

Facility Operating License No. DPR 65 Docket No. 50 336

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relating to M111stono Unit 2 for the month of November, 1991, in accordance with Appendix A Technical Specifications, Section 6.9.1.6.

One j

additional copy of the report is enclosed.

Very truly yours, NORTilEAST NUCLEAR ENERGY COMPANY f t.

(rcu

/

'. Stephen E. Scaco Station Director Millstone Nuclear Power Station SES/CN c: T. T. Martin, Region I Administrator C. S. Vissing, URC Project Manager, Millstone Unit No. 2 V. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2 6 3

.I l

9112170008 9111?O_6 ppR ADOCK 050023g PDn

.R hSY rp

(

+

OPEPATING DATA ItEPORT DOCP.ET NO.

,,,1Qd 6. _

m DATE _lliQfdL COMPLETED BY J J ]ri gn._ _,

TELEPHONE _ R !)1 L y d l l21 EXT. Js)).

QPERATING STATUS Notes: Iums 21 and 22 1.

Unit Name:

Millstone Unit 2 cumulative are volghte.i 2.

Reporting Period:

N,22e:tber 1991 averages. Unit operated 3.

Licensed Thermal Power (MWt):

2700 or 2560 MUTil prior to ita 4.

Nameplate Rating (Cross MVe)-

009 uprating to the current 5.

Design Electrical Rating (Net MWe):

870 2700 MVTil power level; 6.

Maximum Depet.dable Capacity (Cros: MUe):

893.83

=-

--=

7.

Maximum Dependable Capacity (Net MVe):

862.88 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level To Vhich Restricted. If any (Net MVe):

N/A

10. Reacc,ns For Restrictions, If Any:

N/A This Month Yr. To Date Cumulative

11. !!ours In Reporting Period

._._.720.0 8016.0 139656.0

12. Number Of Hours Reactor Vas Crit!. cal 126.8 5032.3 101944.9
13. Reactor Reserve Shutdown llours 03 0. ';

2@j

14. Hours Generator On-Line 126.8 4742.3 97086.1
15. Unit Reserve Shutdown Hours

_f)LQ 0.0 468.2 16 Cross Thermal Energy Generated (MVil) 342421J 12}DMJ3_A 267361583.4

11. Cross Electrical Energy Generated (!NH) 114663.Q 4085139.0_ _

8 Dl4838. 5

18. Net Electrical Energy Generated (!NH) 104620J 3901692.0_

78202741.5

19. Unit Service Factor 17.6 59.2 69.5
20. Unit Availability Factor 17 1 59.2 69.9
21. Unit Capacity Factor (Using MDC Net) 16.B

$ 6._4 ;

65.7

22. Unit Capacity Factor (Using DER Net) 16.7 55.9 64.5
23. Unit Forced Outage Rate 82.4 40.6 15.1 24 Shutdowns Scheduled Over Next 6 Months (Ty'pe, Date, and Duration of Each):

EOC 11 Refuel and Steam Generator Replacement Outage. Anr11 - 1992. 160 days.

25. If Unit Shutdown At End Of Report Period, Estimated Date of Startup:

12/11/91

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A

_,,J / A

AVEPAGE DAILY UNIT POWER LEVEL DOCKET NO.

_1Q-13 6 UNIT:

_1R Unt_one Unit 2 DATEt 12/06/91 COMPLETED BY:

_ U leron TELEFHONE:

(203) 447-1791 EXT:

4417 MONTH:

NOVDiBER 1991 DAY AVG. DAILY F0Vr.R II. VEL DAY AVG. DAILY POVER LEVEL (MVe-Net)

(MVe-Net) 1 874 17 0

2 873 18 0

3 873 19 f,

4 873 20 0

5 874 21 0

6 226 22 0

7 0

23 0

8 0

2t 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 16 0

INSTRUCTIONS On this format, list the average daily unit power level in MVe Net for each day in the reporting month, Compute to the nearest whole megawatt.

l

+

DOCKET $50.

50-336 UNIT SHITTDOWS AND POWiiR REDUCTIONS.

UNIT NAME Millstone 2 4

DATE 12/06/91 COMPLCTED BY.

G. Neron l'

TELEPHONE (203) 447-1791 REPORT HONTH NOVEMBER 1901 EXT.-

4417 l-2 No.

Date Type Duration Reason Method of License Systgn Compgnent Cause & Corrective (flours)

Shutting Event Code Code Action to 3

Down Reactor Report #

Prevent Recurrence T

. 10 911106 F

593.2 A

2 91-012 SN PSF on November 6. 1991, with the unit opera-ting at 100t power, a drain line (eight inch pipe) from the first stage re-heater drain tank no. 1B.t_2 the IB high pressure feed-4 water heater ruptured. Control cperators obsereed control room instrumentation to determine the affects on plant systems.

In addition, the steam discharging into l

the turbine building caused activation of numerous alarms in the control room.

A manual reactor trip was then i

ordered, based upcn control room alarms and indications.

A NDE inspection progran, of turbine building and auxiliary building secondary plant piping was init'.ted and expanded to include the EPRI CHr.CMATE inspection program. The plant remains shutdown and inspections are engoing at this time.

See LER.

1 I-i

' Reason:

' Method

' Exhibit G - Instructions F:

Forced j

S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i

B-Maintenance or Test 2-Manual Scram Entry Sheets for License i

C-Refueling 3-Automatic Scram Event Report (LER) File i

D-Regulatcry Restriction 4-Continued from (NUFEG-0161) l E-Operator Training & License Examination Previous month 5

l F-Administrative 5-Power Reduction Exhibit 1 -Same Source G-Cperational Error-(r.xplain)

(Duration -0) j H-Other (Explain) 6-Other (Explain) l l

i t

n.

,e

.e,

,.,,,n.

REFUELING IllFORMATIOli REQU.13T 1.

Name of facility:

lilllaigne 2 2.

Scheduled dato for next refueling shutdown:

.Aoril, 1292 3.

Scheduled date for restart following refueling:

..H/ A 4.

Will refueling or resumption of oporation thereafter require a technical spe 4.fication change or other licenso amendment?

Nono at this timo 5.

Scheduled date(s) for submitting licensing action and supporting informations yone 6.

Important licensing considorations associated with rofueling, e.g.,

now or different fuel design or supplier, unroviewed design or performanco analysis methods, significant changos in fuel design, now operating procedures:

M11Lstone 2 will.be replacina the Steam Generator sub-assemblies dur: na the up.gominc _Qnd of Cyg.le 11 ref.uglina outage.

It is R qipated this will be accomollahed under 10CFR 50.59.

7.

The number of fuel assemblics (a) in the coro and (b) in the spent fuel storago pool In Cores (a) all In Spent Fuel Pools (b) 112

~

liq?E: "hfED_ numbers recrop3nt the total f ug l a s semblign. 3ni_g.g. ag.gl-

~dat t fdtgl Eigrage boxes in the.ge two (a) Item Centrol Ar_ tag 0.

The present licensed spent fuel pool storago capacity and the sizo

-of any increase in licensed storage capacity that has been requested or is planned, in number of fuel ascomblios:

Currentiv 12.77 9..

The projected date of the last refueling that can bo discharged to the spent fuel pool assuming the present licensed capacity:

129.1,_. Spent.J.us) Pool Full, core off load capacity is reached 'With-

-out consolidation 1.

1998. _ Coro Fulb. Jngat_fgel Poollull.

2009, Snont Fuel Pool Full, core off load capacity is reached-contingent upon_ full scale storage of consolldated_Lu21 in tho' Spent Fuel Pool.

i l.

l