ML20093E295: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Q | {{#Wiki_filter:Q | ||
~ | |||
GENuclearEnergy | (g GENuclearEnergy | ||
.hunns L Guinn AdvancedReactor Programs | |||
ilujects Manager. LMR and S8WR Programs | \\ | ||
ilujects Manager. LMR and S8WR Programs GeneralDectnc Company 1 | |||
175 Curtner Ave., MIC 165 SanJose CA 95125-1088 408925-1005. DialCcmm: 8*425-1005 ft 408 925 3991, Email: 0wnnJ@sjepo2.ne.ge com October 10,1995 MFN 214-95 Docket 52-004 Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555 Attention: | |||
Theodore E. Quay, Director Standardization Project Directorate | |||
==Subject:== | ==Subject:== | ||
| Line 26: | Line 29: | ||
==Reference:== | ==Reference:== | ||
: 1. Letter dated July 28,1995 from Dino C. Scaletti to Mr. James E.Qpinn (GE), Request for Withholding Information From Public Disclosure, General Electric Quality Assurance (QA) Regarding the Simplified Boiling Water Reactor (SBWR) GIST Testing . | : 1. Letter dated July 28,1995 from Dino C. Scaletti to Mr. James E.Qpinn (GE), Request for Withholding Information From Public Disclosure, General Electric Quality Assurance (QA) Regarding the Simplified Boiling Water Reactor (SBWR) GIST Testing. | ||
: 2. Letter MFN 121-93 from R.C. Mitchell (GE) to Jerry N. Wilson (NRC), | : 2. Letter MFN 121-93 from R.C. Mitchell (GE) to Jerry N. Wilson (NRC), | ||
SBWR GIST Test QA Program Documentation, dated July 28,1993. | SBWR GIST Test QA Program Documentation, dated July 28,1993. | ||
In response to the NRC's Reference I letter, GE formally requests the withdrawal of the subject documentation and the associated affidavit. This information was transmitted to the NRC in Reference 2. Please retum this documentation to GE. | In response to the NRC's Reference I letter, GE formally requests the withdrawal of the subject documentation and the associated affidavit. This information was transmitted to the NRC in Reference 2. Please retum this documentation to GE. | ||
Sincerel | Sincerel | ||
// | |||
4 | 4 1-unn ec: | ||
I. Catton | P. A. Boehnert (NRC/ACRS) (2 paper copies plus E-Mail) | ||
A. Drozd | I. Catton (ACRS) | ||
D. C. Scaletti | (1 paper copy plus E-Mail) | ||
J. H. Wilson | A. Drozd (NRC) | ||
T | (1 paper copy plus E-Mail) i S. Q. Ninh (NRC) | ||
1600 % | (2 paper copies plus E-Mail) | ||
D. C. Scaletti (NRC) | |||
(1 paper copy plus E-Mail) | |||
J. H. Wilson (NRC) | |||
(1 paper copy plus E-Mail) | |||
T 1600 % | |||
\\t 0' | |||
9510160162 951010 h | |||
k PDR ADOCK 05200004 A. | |||
PDR km | |||
.r. | |||
MFN 214-95 bec: | MFN 214-95 bec: | ||
J. A.- Beard P. F. Billig R. II. Buchholz T. Cook (doe) (2 paper copies, E-Mail) | |||
R. T. Fernandez | R. T. Fernandez (EPRI) | ||
J. R. Fitch | J. R. Fitch J. N. Fox 4 | ||
J. N. Fox l | l P. C. IIccht M. IIerzog J. E. Leatherman 4 | ||
J. E. Leatherman l | l T. Mulford (EPRI)(2 paper copies, E-Mail) | ||
J. E. Quinn F. A. Ross (doe) 4 B. S. Shiralkar l | |||
F. A. Ross | R. Srinivasan (EPRI) | ||
J. E. Torbeck GE Master File M/C 747 (1 paper copy, E-Mail) i SBWR Project File (1 paper copy, E-Mail) a I | |||
J. E. Torbeck GE Master File M/C 747 (1 paper copy, E-Mail) i | |||
1 1 | 1 1 | ||
t 4 | t 4 | ||
1}} | 1}} | ||
Latest revision as of 10:32, 13 December 2024
| ML20093E295 | |
| Person / Time | |
|---|---|
| Site: | 05200004 |
| Issue date: | 10/10/1995 |
| From: | Quinn J GENERAL ELECTRIC CO. |
| To: | Quay T NRC (Affiliation Not Assigned) |
| References | |
| MFN-214-95, NUDOCS 9510160162 | |
| Download: ML20093E295 (2) | |
Text
Q
~
(g GENuclearEnergy
.hunns L Guinn AdvancedReactor Programs
\\
ilujects Manager. LMR and S8WR Programs GeneralDectnc Company 1
175 Curtner Ave., MIC 165 SanJose CA 95125-1088 408925-1005. DialCcmm: 8*425-1005 ft 408 925 3991, Email: 0wnnJ@sjepo2.ne.ge com October 10,1995 MFN 214-95 Docket 52-004 Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555 Attention:
Theodore E. Quay, Director Standardization Project Directorate
Subject:
SBWR - Withdrawal of GIST Test QA Program Documentation Transmitted to the Nuclear Regulatory Commission on July 28,1993
Reference:
- 1. Letter dated July 28,1995 from Dino C. Scaletti to Mr. James E.Qpinn (GE), Request for Withholding Information From Public Disclosure, General Electric Quality Assurance (QA) Regarding the Simplified Boiling Water Reactor (SBWR) GIST Testing.
- 2. Letter MFN 121-93 from R.C. Mitchell (GE) to Jerry N. Wilson (NRC),
SBWR GIST Test QA Program Documentation, dated July 28,1993.
In response to the NRC's Reference I letter, GE formally requests the withdrawal of the subject documentation and the associated affidavit. This information was transmitted to the NRC in Reference 2. Please retum this documentation to GE.
Sincerel
//
4 1-unn ec:
P. A. Boehnert (NRC/ACRS) (2 paper copies plus E-Mail)
I. Catton (ACRS)
(1 paper copy plus E-Mail)
A. Drozd (NRC)
(1 paper copy plus E-Mail) i S. Q. Ninh (NRC)
(2 paper copies plus E-Mail)
D. C. Scaletti (NRC)
(1 paper copy plus E-Mail)
J. H. Wilson (NRC)
(1 paper copy plus E-Mail)
T 1600 %
\\t 0'
9510160162 951010 h
k PDR ADOCK 05200004 A.
PDR km
.r.
MFN 214-95 bec:
J. A.- Beard P. F. Billig R. II. Buchholz T. Cook (doe) (2 paper copies, E-Mail)
R. T. Fernandez (EPRI)
J. R. Fitch J. N. Fox 4
l P. C. IIccht M. IIerzog J. E. Leatherman 4
l T. Mulford (EPRI)(2 paper copies, E-Mail)
J. E. Quinn F. A. Ross (doe) 4 B. S. Shiralkar l
R. Srinivasan (EPRI)
J. E. Torbeck GE Master File M/C 747 (1 paper copy, E-Mail) i SBWR Project File (1 paper copy, E-Mail) a I
1 1
t 4
1