Northem States Power Company Pralrle Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch. Minnesota 55089 February 8, 1996 | Northem States Power Company Pralrle Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch. Minnesota 55089 February 8, 1996 Prairie Island Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report January 1996 i | ||
l 1 | l 1 | ||
Attached is the Monthly Operating Report for January 1996 for the Prairie | Attached is the Monthly Operating Report for January 1996 for the Prairie Island Generating Plant. | ||
] | |||
Michael D Wadley Plant Manager Prairie Island Nuclear 'enerating Plant c: | 9 jg: | ||
Michael D Wadley Plant Manager Prairie Island Nuclear 'enerating Plant c: | |||
Regional Administrator-III, NRC NRR Proj ect Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment. | |||
1 d | 1 d | ||
/ | |||
9602130066 960131 PDR | \\ | ||
9602130066 960131 PDR ADOCK 05000282 g | |||
PDR | |||
PRINTED 02/02/96 | PRINTED 02/02/96 NRC MONTHLY REPORT Page 1 DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-11214376 | ||
) | |||
NARRATIVE | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE MONTH: JANUARY 1996 | OF OPERATING EXPERIENCE MONTH: JANUARY 1996 Unit 1 began the month in coastdown operation. On the 5'h at 2000 the Unit started a power reduction to txing the Unit off-line and start the refueling and maintenance outage. The generator was taken off-line on the 5th at 2153 and the reactor was taken subcritical at 2315. | ||
Unit 1 began the month in coastdown operation. On the 5'h at 2000 the Unit started a power reduction to txing the Unit off-line and start the refueling and maintenance outage. The generator was taken off-line on the 5th at 2153 and the reactor was taken subcritical at 2315. | |||
This ends fuel cycle number 17. | This ends fuel cycle number 17. | ||
This ended a continuous operating run (generator on-line) of 321.2 days. | This ended a continuous operating run (generator on-line) of 321.2 days. | ||
This ended a continuous reactor run (critical) of 512.3 days. | This ended a continuous reactor run (critical) of 512.3 days. | ||
~ As of the 31st the outage is at day number 26. | |||
1 4 | 1 4 | ||
a CURRENT CONTINUOUS OPERATING RUN OF 0 DAYS 4 | a CURRENT CONTINUOUS OPERATING RUN OF 0 DAYS 4 | ||
p | p e | ||
~ | |||
PRINTED 02C2/96 | NRC MONTHLY REPORT PRINTED 02C2/96 Page 2 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-3861121-4376 AVERAGE DAILY POWER LEVEL UNIT 1 MONTH: JANUARY 1996 DAIE1 AVERAGE DAILY POWER LEVEL 01/01/96 420 01/02/96 417 01/03/96 407 01/04/96 406 01/05/96 354 01/06/96 | ||
-14 01/07/96 | |||
1 j | -3 01/08/96 | ||
-1 01/09/96 | |||
-1 01/10/96 | |||
-1 01/11/96 | |||
-1 01/12/96 | |||
-1 01/13/96 | |||
-1 01/14/96 | |||
-1 01/15/96 | |||
-1 01/16/96 | |||
-1 01/17/96 | |||
-1 l | |||
01/18/96 | |||
-1 01/19/96 | |||
-1 01/20/96 | |||
-1 l | |||
01/21/96 | |||
-1 j | |||
01/22/96 | |||
-1 01/23/96 | |||
-1 01/24/96 | |||
-1 01/25/96 | |||
-1 01/26/96 | |||
-1 01/27/96 | |||
-1 01/28/96 | |||
-1 01/29/96 | |||
-1 l | |||
01/30/96 | |||
-1 01/31/96 | |||
-1 1 | |||
1 j | |||
AVERAGE LOADS ABOVE 513 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER I | |||
l | l | ||
PRINTED 02/02/96 | PRINTED 02/02/96 NRC MONTHLY REPORT PaSe 3 DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-386-1121-4376 OPERATING DATA REPORT OPERATING STATUS | ||
: 1. UNIT NAME: | |||
: 1. UNIT NAME: | PRAIRIE ISLAND NO.1 | ||
: 2. REPORTING PERIOD: | : 2. REPORTING PERIOD: | ||
JANUARY 1996 | |||
: 3. LICENSED THERMAL POWER (MWT): 1650 | : 3. LICENSED THERMAL POWER (MWT): 1650 | ||
: 4. NAMEPLATE RATING (GROSS MWE): 593 | : 4. NAMEPLATE RATING (GROSS MWE): 593 | ||
' 5. DESIGN ELECTRICAL RATING (NET MWE): 530 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): | : 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): | ||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): | 545 | ||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): | |||
513 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON: | : 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON: | ||
NONE | NONE | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE | ||
: 10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH | : 10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH YR-TO4 ATE CUMULATIVE | ||
: 11. HOURS IN REPORTING PERIOD | : 11. HOURS IN REPORTING PERIOD 744 744 193968 | ||
: 12. NUMBER OF HOURS REACTOR CRITICAL | : 12. NUMBER OF HOURS REACTOR CRITICAL 119.3 119.3 166478.6 | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS | : 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1 | ||
: 14. HOURS GENERATOR ON-LINE | : 14. HOURS GENERATOR ON-LINE 117.9 117.9 164810.9 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | : 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00 | ||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) | : 16. GROSS THERMAL ENERGY GENERATED (MWH) 151245 151245 261304728 l | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) | : 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 51000 51000 86174710 | ||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) | : 18. NET ELECTRICAL ENERGY GENERATED (MWH) 47126 47126 81021431 | ||
: 19. UNIT SERVICE FACTOR | : 19. UNIT SERVICE FACTOR 15.8 15.8 85 I | ||
: 20. UNIT AVAILABILITY FACTOR | : 20. UNIT AVAILABILITY FACTOR 15.8 15.8 85 | ||
: 21. UNIT CAPACITY FACTOR ( MDC NET) 12.3 12.3 82.9 | |||
: 22. UNIT CAPACITY FACTOR ( DER NET) | : 22. UNIT CAPACITY FACTOR ( DER NET) 12 12 78.8 | ||
: | : 23. UNIT FORCED OUTAGE RATE O | ||
: 24. FORCED OUTAGE HOURS | O 4.7 | ||
: 24. FORCED OUTAGE HOURS 0.0 0.0 8125.9 | |||
: 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH): | : 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH): | ||
Refueling and maintenance outage starting on January 6,1996. | Refueling and maintenance outage starting on January 6,1996. | ||
. 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE: | |||
February 15,1996 i | February 15,1996 i | ||
+- | |||
4 | 4 PRINTED 02/02/9tf NRC MONTHLY REPORT Page 4 DOCKET NO. 50-262 UNIT PRAIRIE ISLAND NO.1 DA1E 02/02/96 j | ||
COMPLETED BY DALE DUGSTAD TELEPHONE 612-386-1121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS i | |||
MONTH: JANUARY 1996 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 01/01/96 1 | |||
DA1E 02/02/96 | S 0 | ||
MONTH: JANUARY 1996 DATE | C 5 | ||
01/01/96 | N/A NOTES: | ||
1 3 IXEE | Coast down operation. | ||
F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER | 01/01/96 1 | ||
S 628.1 C | |||
1 N/A Fuel NOTES: | |||
Refueling & Maintenance Outage d | |||
1 3 | |||
IXEE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 34UTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER lEEE STD 803A-1983 F-ADMINISTRATIVE 4 | |||
G-OPERATIONAL ERROR H-OTHER | |||
- -~ | |||
PRINTED 02G96 NRC MONTHLY REPORT Page5 l | |||
DOCKET No. 50306 | |||
) | |||
UNIT PRAIRIE ISLAND NO. 2 DATE 02ATM6 COMPLETED BY DALE DUGSTAD. | |||
DOCKET No. 50306 | TELEPHONE 6124881121-4376 4 | ||
UNIT PRAIRIE ISLAND NO. 2 DATE 02ATM6 COMPLETED BY DALE DUGSTAD . | |||
NARRATIVE | NARRATIVE | ||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE 1 | OF OPERATING EXPERIENCE 1 | ||
MONTH: JANUARY 1996 Unit 2 was base loaded this month, there were no shutdowns or power reductions. | |||
4 9 | 4 9 | ||
i | i | ||
} | } | ||
i | i | ||
) | |||
l CURRENT CONTINUOUS OPERATING RUN OF 218 DAYS | |||
l | |||
CURRENT CONTINUOUS OPERATING RUN OF 218 DAYS | |||
PRINTED 02M2/96 | PRINTED 02M2/96 NRC MONTHLY REPORT Page 6 DOCKET No. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 AVERAGE DAILY POWER LEVEL UNIT 2 MONTH: JANUARY 1996 DATE: | ||
AVERAGE DAILY POWER LEVEL 01/01/96 528 01/02/96 530 01/03/96 523 01/04/96 530 01/05/96 527 01/06/96 526 01/07/96 533 01/08/96 531 01/09/96 526 01/10/96 529 01/11/96 533 01/12/96 534 01/13/96 529 01/14/96 530 01/15/96 531 01/16/96 530 01/17/96 533 01/18/96 526 01/19/96 534 01/20/96 531 01/21/96 531 01/22/96 527 01/23/96 534 01/24/96 533 01/25/96 526 01/26/96 530 01/27/96 535 01/28/96 526 01/29/96 530 01/30/96 529 01/31/96 530 AVERAGE LOADS ABOVE 512 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER i | |||
\\ | |||
PRINTED 02/02/96 j | PRINTED 02/02/96 j | ||
NRC MONTHLY REPORT Page 7 e | |||
DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 616-388-1121-4376 OPERATING DATA REPORT OPERATING STATUS | DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 616-388-1121-4376 OPERATING DATA REPORT OPERATING STATUS | ||
: 1. UNIT NAME: | : 1. UNIT NAME: | ||
: 2. REPORTING PERIOD: | PRAIRIE ISLAND NO. 2 | ||
: 2. REPORTING PERIOD: | |||
JANUARY 1996 | |||
: 3. LICENSED THERMAL POWER (MWT): 1650 | : 3. LICENSED THERMAL POWER (MWT): 1650 | ||
: 4. NAMEPLATE RATING (GROSS MWE): | : 4. NAMEPLATE RATING (GROSS MWE): | ||
593 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 530 | : 5. DESIGN ELECTRICAL RATING (NET MWE): 530 | ||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): | : 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): | ||
544 | |||
' 7. MAXIMUM DEPENDABLE CAPACITY (NET HWE): | |||
512 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON: | : 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON: | ||
NONE | NONE | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE | ||
: 10. REASONS FOR RESTRICTIONS, IF ANY; NONE THIS MONTH | : 10. REASONS FOR RESTRICTIONS, IF ANY; NONE THIS MONTH YR-TO-DATE CUMULATIVE | ||
: 11. HOURS IN REPORTING PERIOD | : 11. HOURS IN REPORTING PERIOD 744 744 185086 | ||
: 12. NUMBER OF HOURS REACTOR CRITICAL | : 12. NUMBER OF HOURS REACTOR CRITICAL 744.0 744.0 163553.0 | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS | : 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 1516.1 | ||
: 14. HOURS GENERATOR ON-LINE | : 14. HOURS GENERATOR ON-LINE 744.0 744.0 162133.5 | ||
: 15. UNIT RESERVE SHUTDOWN HOURS | : 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00 | ||
: 16. GROSS THERMAL ENERGY OENERATED (MWH) | : 16. GROSS THERMAL ENERGY OENERATED (MWH) 1224000 1224000 258017069 | ||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) | : 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 415170 415170 84316480 | ||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) | : 18. NET ELECTRICAL ENERGY GENERATED (MWH) 394207 394207 79719871 | ||
: 19. UNIT SERVICE FACTOR | : 19. UNIT SERVICE FACTOR 100 100 87.6 | ||
: 20. UNIT AVAILABILITY FACTOR | : 20. UNIT AVAILABILITY FACTOR 100 100 87.6 | ||
: 21. UNIT CAPACITY FACTOR ( MDC NET) | : 21. UNIT CAPACITY FACTOR ( MDC NET) 103.5 103.5 85.9 | ||
: 22. UNIT CAPACITY FACTOR ( DER NET) | : 22. UNIT CAPACITY FACTOR ( DER NET) 100 100 81.3 | ||
: 23. UNIT FORCED OUTAGE RATE | : 23. UNIT FORCED OUTAGE RATE O | ||
: 24. FORCED OUTAGE HOURS | O 2.4 | ||
: 24. FORCED OUTAGE HOURS 0.0 0.0 3084.7 | |||
: 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH): | : 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH): | ||
N/A | N/A | ||
| Line 152: | Line 193: | ||
N/A | N/A | ||
NRC MONTHLY REPORT PRINTED 02C2/96 Page 8 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-3881121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: JANUARY 1996 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 01/01/96 2 | |||
N/A 0 | |||
. NOTES: None for January. | |||
4 6 | 4 6 | ||
IYEE | IYEE REASON METHOD | ||
$1ETEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TP.lP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND S-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER | |||
.}} | |||
Latest revision as of 07:34, 13 December 2024
| ML20097D541 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 01/31/1996 |
| From: | Dugstad D, Wadley M NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9602130066 | |
| Download: ML20097D541 (9) | |
Text
-
Northem States Power Company Pralrle Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch. Minnesota 55089 February 8, 1996 Prairie Island Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Monthly Operating Report January 1996 i
l 1
Attached is the Monthly Operating Report for January 1996 for the Prairie Island Generating Plant.
]
9 jg:
Michael D Wadley Plant Manager Prairie Island Nuclear 'enerating Plant c:
Regional Administrator-III, NRC NRR Proj ect Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment.
1 d
/
\\
9602130066 960131 PDR ADOCK 05000282 g
PRINTED 02/02/96 NRC MONTHLY REPORT Page 1 DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-11214376
)
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE MONTH: JANUARY 1996 Unit 1 began the month in coastdown operation. On the 5'h at 2000 the Unit started a power reduction to txing the Unit off-line and start the refueling and maintenance outage. The generator was taken off-line on the 5th at 2153 and the reactor was taken subcritical at 2315.
This ends fuel cycle number 17.
This ended a continuous operating run (generator on-line) of 321.2 days.
This ended a continuous reactor run (critical) of 512.3 days.
~ As of the 31st the outage is at day number 26.
1 4
a CURRENT CONTINUOUS OPERATING RUN OF 0 DAYS 4
p e
~
NRC MONTHLY REPORT PRINTED 02C2/96 Page 2 DOCKET NO. 50-282 UNIT PRAIRIE ISLAND NO.1 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-3861121-4376 AVERAGE DAILY POWER LEVEL UNIT 1 MONTH: JANUARY 1996 DAIE1 AVERAGE DAILY POWER LEVEL 01/01/96 420 01/02/96 417 01/03/96 407 01/04/96 406 01/05/96 354 01/06/96
-14 01/07/96
-3 01/08/96
-1 01/09/96
-1 01/10/96
-1 01/11/96
-1 01/12/96
-1 01/13/96
-1 01/14/96
-1 01/15/96
-1 01/16/96
-1 01/17/96
-1 l
01/18/96
-1 01/19/96
-1 01/20/96
-1 l
01/21/96
-1 j
01/22/96
-1 01/23/96
-1 01/24/96
-1 01/25/96
-1 01/26/96
-1 01/27/96
-1 01/28/96
-1 01/29/96
-1 l
01/30/96
-1 01/31/96
-1 1
1 j
AVERAGE LOADS ABOVE 513 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER I
l
PRINTED 02/02/96 NRC MONTHLY REPORT PaSe 3 DOCKET NO. 50 282 UNIT PRAIRIE ISLAND NO.1 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-386-1121-4376 OPERATING DATA REPORT OPERATING STATUS
- 1. UNIT NAME:
PRAIRIE ISLAND NO.1
- 2. REPORTING PERIOD:
JANUARY 1996
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE): 593
' 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
545
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
513
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY: NONE THIS MONTH YR-TO4 ATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 744 193968
- 12. NUMBER OF HOURS REACTOR CRITICAL 119.3 119.3 166478.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 5571.1
- 14. HOURS GENERATOR ON-LINE 117.9 117.9 164810.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 151245 151245 261304728 l
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 51000 51000 86174710
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 47126 47126 81021431
- 19. UNIT SERVICE FACTOR 15.8 15.8 85 I
- 20. UNIT AVAILABILITY FACTOR 15.8 15.8 85
- 21. UNIT CAPACITY FACTOR ( MDC NET) 12.3 12.3 82.9
- 22. UNIT CAPACITY FACTOR ( DER NET) 12 12 78.8
- 23. UNIT FORCED OUTAGE RATE O
O 4.7
- 24. FORCED OUTAGE HOURS 0.0 0.0 8125.9
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling and maintenance outage starting on January 6,1996.
. 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
February 15,1996 i
+-
4 PRINTED 02/02/9tf NRC MONTHLY REPORT Page 4 DOCKET NO. 50-262 UNIT PRAIRIE ISLAND NO.1 DA1E 02/02/96 j
COMPLETED BY DALE DUGSTAD TELEPHONE 612-386-1121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS i
MONTH: JANUARY 1996 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 01/01/96 1
S 0
C 5
N/A NOTES:
Coast down operation.
01/01/96 1
S 628.1 C
1 N/A Fuel NOTES:
Refueling & Maintenance Outage d
1 3
IXEE REASON METHOD SYSTEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 34UTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND 5-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER lEEE STD 803A-1983 F-ADMINISTRATIVE 4
G-OPERATIONAL ERROR H-OTHER
- -~
PRINTED 02G96 NRC MONTHLY REPORT Page5 l
DOCKET No. 50306
)
UNIT PRAIRIE ISLAND NO. 2 DATE 02ATM6 COMPLETED BY DALE DUGSTAD.
TELEPHONE 6124881121-4376 4
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE 1
MONTH: JANUARY 1996 Unit 2 was base loaded this month, there were no shutdowns or power reductions.
4 9
i
}
i
)
l CURRENT CONTINUOUS OPERATING RUN OF 218 DAYS
PRINTED 02M2/96 NRC MONTHLY REPORT Page 6 DOCKET No. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121-4376 AVERAGE DAILY POWER LEVEL UNIT 2 MONTH: JANUARY 1996 DATE:
AVERAGE DAILY POWER LEVEL 01/01/96 528 01/02/96 530 01/03/96 523 01/04/96 530 01/05/96 527 01/06/96 526 01/07/96 533 01/08/96 531 01/09/96 526 01/10/96 529 01/11/96 533 01/12/96 534 01/13/96 529 01/14/96 530 01/15/96 531 01/16/96 530 01/17/96 533 01/18/96 526 01/19/96 534 01/20/96 531 01/21/96 531 01/22/96 527 01/23/96 534 01/24/96 533 01/25/96 526 01/26/96 530 01/27/96 535 01/28/96 526 01/29/96 530 01/30/96 529 01/31/96 530 AVERAGE LOADS ABOVE 512 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER i
\\
PRINTED 02/02/96 j
NRC MONTHLY REPORT Page 7 e
DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 616-388-1121-4376 OPERATING DATA REPORT OPERATING STATUS
- 1. UNIT NAME:
PRAIRIE ISLAND NO. 2
- 2. REPORTING PERIOD:
JANUARY 1996
- 3. LICENSED THERMAL POWER (MWT): 1650
- 4. NAMEPLATE RATING (GROSS MWE):
593
- 5. DESIGN ELECTRICAL RATING (NET MWE): 530
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
544
' 7. MAXIMUM DEPENDABLE CAPACITY (NET HWE):
512
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 - 7) SINCE LAST REPORT, GIVE REASON:
NONE
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTIONS, IF ANY; NONE THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 744 185086
- 12. NUMBER OF HOURS REACTOR CRITICAL 744.0 744.0 163553.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.00 1516.1
- 14. HOURS GENERATOR ON-LINE 744.0 744.0 162133.5
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.00 0.00
- 16. GROSS THERMAL ENERGY OENERATED (MWH) 1224000 1224000 258017069
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 415170 415170 84316480
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 394207 394207 79719871
- 19. UNIT SERVICE FACTOR 100 100 87.6
- 20. UNIT AVAILABILITY FACTOR 100 100 87.6
- 21. UNIT CAPACITY FACTOR ( MDC NET) 103.5 103.5 85.9
- 22. UNIT CAPACITY FACTOR ( DER NET) 100 100 81.3
- 23. UNIT FORCED OUTAGE RATE O
O 2.4
- 24. FORCED OUTAGE HOURS 0.0 0.0 3084.7
- 25. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 26. IF CURRENTLY SHUTDOWN, ESTIMATED STARTUP DATE:
N/A
NRC MONTHLY REPORT PRINTED 02C2/96 Page 8 DOCKET NO. 50-306 UNIT PRAIRIE ISLAND NO. 2 DATE 02/02/96 COMPLETED BY DALE DUGSTAD TELEPHONE 612-3881121-4376 UNIT SHUTDOWNS AND POWER REDUCTIONS MONTH: JANUARY 1996 DATE UNIT TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT 01/01/96 2
N/A 0
. NOTES: None for January.
4 6
IYEE REASON METHOD
$1ETEM CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHEDULED B-MAINTENANCE OR TEST 2-MANUAL TRIP C-REFUELING 3-AUTO TP.lP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING AND S-REDUCED LOAD COMPONENT CODE LICENSE EXAMINATION 9-OTHER IEEE STD 803A-1983 F-ADMINISTRATIVE G-OPERATIONAL ERROR H-OTHER
.