ML20101P045: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:,
d BALTIMORE
d BALTIMORE GAS AND
              ,                                      GAS AND
(
(                                               ELECTRIC 1650 CALVERT CUFFS PARKWAY . LUSBY, MARY 1.AND 20657 4702 Gr.opot C CRECL Vice PntalDENT y, ,   ggg]
ELECTRIC 1650 CALVERT CUFFS PARKWAY. LUSBY, MARY 1.AND 20657 4702 Gr.opot C CRECL y,,
Nc6cLE Am CNERGV (4 'Q) 200-4 4 65 U. S. Nuclear Regumtory Commission Washington, DC 20555
ggg]
Vice PntalDENT Nc6cLE Am CNERGV (4 'Q) 200-4 4 65 U. S. Nuclear Regumtory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
+
+
ATTENTION:                  Document Control Desk                                                          ,


==SUBJECT:==
==SUBJECT:==
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 i
Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318
                                  .1992 Annual Report on ECCS - Codes and Methods Required by JJ0.ffR 50.46
.1992 Annual Report on ECCS - Codes and Methods Required by i
JJ0.ffR 50.46


==REFERENCE:==
==REFERENCE:==
(a)     Calvert C!iffs Unit 1 Technical Specification 4.4.5.5 Gentlemen:
(a)
As required by Reference (a), this letter reports the number of tubes plugged in the Calvert Cliffs
Calvert C!iffs Unit 1 Technical Specification 4.4.5.5 Gentlemen:
,    Unit 1 Steam Generators during the recently completed Inservice Inspection.
As required by Reference (a), this letter reports the number of tubes plugged in the Calvert Cliffs Unit 1 Steam Generators during the recently completed Inservice Inspection.
Based on recent Eddy Current Examination results of the Unit 1 Steam Generators, we plugged 11 tubes in Steam Generator No.11 and 7 tubes in Steam Generator No.12. In addition, a tube
Based on recent Eddy Current Examination results of the Unit 1 Steam Generators, we plugged 11 tubes in Steam Generator No.11 and 7 tubes in Steam Generator No.12. In addition, a tube
                                      ~
~
(R-93,L-67) in Steam Generator No.12, which had been erroneously plugged on the cold leg side in
(R-93,L-67) in Steam Generator No.12, which had been erroneously plugged on the cold leg side in 1986 (LER 317/88-03), was plugged on the hot leg side. The total number of tubes plugged in Steam Generator Nos.11 and 12 are 118 and 77, respectively.
;;    1986 (LER 317/88-03), was plugged on the hot leg side. The total number of tubes plugged in Steam Generator Nos.11 and 12 are 118 and 77, respectively.
Should yoa have any further questions regarding this matter, we will be pleased to discuss them with you.
Should yoa have any further questions regarding this matter, we will be pleased to discuss them with
Very truly yo f)/r 4
,    you.
/L f
Very truly yo   ,
GCC/DWM/dwm/bjd cc:
f)/r 4
D. A. Brune, Esquire J. E. Silberg, Esquire R.- A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC
                                                                      /L       f GCC/DWM/dwm/bjd                                                           '
/
cc:         D. A. Brune, Esquire J. E. Silberg, Esquire R.- A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC                                                                       () , #7 P R. Wilson, NRC
()
                                                                                                /            (
, #7 89eg &&
89eg &&
(
R. I. McLean, DNR J. H. Walter, PSC '
P R. Wilson, NRC R. I. McLean, DNR J. H. Walter, PSC '
* n-   . .
n-h L3 (D
L3 h
9207100259 920706 PDR ADOCK 05000317
9207100259 920706                                                                     (D PDR       ADOCK 05000317 PDR
''Q R
                                                                                                  ''Q.
PDR 1}}
R 1
                                                                          .}}

Latest revision as of 04:18, 13 December 2024

Submits 1992 Annual Rept on ECCS Codes & Methods,Reporting Number of Tubes Plugged in Unit 1 SGs During Recently Completed Isi,Per 10CFR50.46 & TS 4.4.5.5
ML20101P045
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 07/06/1992
From: Creel G
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9207100258
Download: ML20101P045 (1)


Text

,

d BALTIMORE GAS AND

(

ELECTRIC 1650 CALVERT CUFFS PARKWAY. LUSBY, MARY 1.AND 20657 4702 Gr.opot C CRECL y,,

ggg]

Vice PntalDENT Nc6cLE Am CNERGV (4 'Q) 200-4 4 65 U. S. Nuclear Regumtory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

+

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318

.1992 Annual Report on ECCS - Codes and Methods Required by i

JJ0.ffR 50.46

REFERENCE:

(a)

Calvert C!iffs Unit 1 Technical Specification 4.4.5.5 Gentlemen:

As required by Reference (a), this letter reports the number of tubes plugged in the Calvert Cliffs Unit 1 Steam Generators during the recently completed Inservice Inspection.

Based on recent Eddy Current Examination results of the Unit 1 Steam Generators, we plugged 11 tubes in Steam Generator No.11 and 7 tubes in Steam Generator No.12. In addition, a tube

~

(R-93,L-67) in Steam Generator No.12, which had been erroneously plugged on the cold leg side in 1986 (LER 317/88-03), was plugged on the hot leg side. The total number of tubes plugged in Steam Generator Nos.11 and 12 are 118 and 77, respectively.

Should yoa have any further questions regarding this matter, we will be pleased to discuss them with you.

Very truly yo f)/r 4

/L f

GCC/DWM/dwm/bjd cc:

D. A. Brune, Esquire J. E. Silberg, Esquire R.- A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC

/

()

, #7 89eg &&

(

P R. Wilson, NRC R. I. McLean, DNR J. H. Walter, PSC '

n-h L3 (D

9207100259 920706 PDR ADOCK 05000317

Q R

PDR 1