ML20106E629: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:r                                                                                                                   -
{{#Wiki_filter:r TH E CLEVEL AN D ELECTRIC ILLU MIN ATIN G CliM P/.U Y P.o. Box 5000 - CLEVELAND. OHlo 44101 - TELEPHONE (216; 622-9800 - ILLUMINATING BLDG.
TH E CLEVEL AN D ELECTRIC ILLU MIN ATIN G CliM P/.U Y P.o. Box 5000 - CLEVELAND. OHlo 44101 - TELEPHONE (216; 622-9800 - ILLUMINATING BLDG. - 55 PUBLICSoVARE Serving The Best Location in the Nation MURRAY R. EDELMAN viCr entsiotNT                                           October 22, 1984 NUCLEAR PY-CEI/NRR-0145 L Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC         20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Technical Specification Changes to Resolve LRG-II Issue 7-CPB
- 55 PUBLICSoVARE Serving The Best Location in the Nation MURRAY R. EDELMAN viCr entsiotNT October 22, 1984 NUCLEAR PY-CEI/NRR-0145 L Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Technical Specification Changes to Resolve LRG-II Issue 7-CPB
                                                          " Rod Withdrawal Transient Analysis"
" Rod Withdrawal Transient Analysis"


==Dear Mr. Youngblood:==
==Dear Mr. Youngblood:==
 
This letter is provided in response to your {{letter dated|date=August 13, 1984|text=letter dated August 13, 1984}} in which you requested an endorsement from each LRG II member of described changes to rod withdrawal technical specfications. The LRG II proposed solution was found to be acceptable by the staff as described in your letter.
This letter is provided in response to your letter dated August 13, 1984 in which you requested an endorsement from each LRG II member of described changes to rod withdrawal technical specfications. The LRG II proposed solution was found to be acceptable by the staff as described in your letter.
The Cleveland Electric Illuminating Company, as a member of LRG II, hereby endorses the LRG 11 position submitted to the LRG II Project Manager, John. J.
The Cleveland Electric Illuminating Company, as a member of LRG II, hereby endorses the LRG 11 position submitted to the LRG II Project Manager, John. J.
Stefano, by Dale L. Holtzscher (Chairman, LRG II) in a letter dated June 29, 1984.
Stefano, by Dale L. Holtzscher (Chairman, LRG II) in a {{letter dated|date=June 29, 1984|text=letter dated June 29, 1984}}.
Our draft technical specifications, submitted to you by letter dated July 31, 1984 (PY-CEI/NRR-0128 L), incorporates these changes.
Our draft technical specifications, submitted to you by {{letter dated|date=July 31, 1984|text=letter dated July 31, 1984}} (PY-CEI/NRR-0128 L), incorporates these changes.
Very truly yours i                     4v Mur cy R. Edelman Vice President Nuclear Group MRE:nj c cc: Jay Silberg, Esq.                                                                         f J. Stefano D. Hof frian, NRC                                                                 '
Very truly yours i
0 J. Grobe 8410300040 841022 PDR ADOCK 05000440 A                     PDR}}
4v Mur cy R. Edelman Vice President Nuclear Group MRE:nj c f
cc: Jay Silberg, Esq.
J. Stefano D. Hof frian, NRC 0
J. Grobe 8410300040 841022 PDR ADOCK 05000440 A
PDR}}

Latest revision as of 02:59, 13 December 2024

Endorses Licensing Review Group II Changes to Rod Withdrawal Tech Specs,Per 840813 Request
ML20106E629
Person / Time
Site: Perry  
Issue date: 10/22/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8410300040
Download: ML20106E629 (1)


Text

r TH E CLEVEL AN D ELECTRIC ILLU MIN ATIN G CliM P/.U Y P.o. Box 5000 - CLEVELAND. OHlo 44101 - TELEPHONE (216; 622-9800 - ILLUMINATING BLDG.

- 55 PUBLICSoVARE Serving The Best Location in the Nation MURRAY R. EDELMAN viCr entsiotNT October 22, 1984 NUCLEAR PY-CEI/NRR-0145 L Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Technical Specification Changes to Resolve LRG-II Issue 7-CPB

" Rod Withdrawal Transient Analysis"

Dear Mr. Youngblood:

This letter is provided in response to your letter dated August 13, 1984 in which you requested an endorsement from each LRG II member of described changes to rod withdrawal technical specfications. The LRG II proposed solution was found to be acceptable by the staff as described in your letter.

The Cleveland Electric Illuminating Company, as a member of LRG II, hereby endorses the LRG 11 position submitted to the LRG II Project Manager, John. J.

Stefano, by Dale L. Holtzscher (Chairman, LRG II) in a letter dated June 29, 1984.

Our draft technical specifications, submitted to you by letter dated July 31, 1984 (PY-CEI/NRR-0128 L), incorporates these changes.

Very truly yours i

4v Mur cy R. Edelman Vice President Nuclear Group MRE:nj c f

cc: Jay Silberg, Esq.

J. Stefano D. Hof frian, NRC 0

J. Grobe 8410300040 841022 PDR ADOCK 05000440 A