ENS 40283: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 10/29/2003 CST
| event date = 10/29/2003 CST
| last update date = 10/29/2003
| last update date = 10/29/2003
| title = 10 Cfr 21 Notification For Ge Magne-Blast Breaker Tube And Piston Assemblies
| title = 10 Cfr 21 Notification for Ge Magne-Blast Breaker Tube and Piston Assemblies
| event text = This notice is being sent within the two day period to inform you of a safety concern related to tube and piston assemblies for GE Magne-Blast breakers (model AM-4.16-350-2h medium voltage circuit breaker).
| event text = This notice is being sent within the two day period to inform you of a safety concern related to tube and piston assemblies for GE Magne-Blast breakers (model AM-4.16-350-2h medium voltage circuit breaker).
The concern is specific to tube and piston assemblies supplied under part number Q0213X0343R094. All five assemblies supplied to AmerenUE contain a dimensional design error which would cause the assembly to interfere and bind with the circuit breaker movable contact assembly, which would render the breaker inoperative.
The concern is specific to tube and piston assemblies supplied under part number Q0213X0343R094. All five assemblies supplied to AmerenUE contain a dimensional design error which would cause the assembly to interfere and bind with the circuit breaker movable contact assembly, which would render the breaker inoperative.

Latest revision as of 21:24, 1 March 2018

ENS 40283 +/-
Where
Callaway Ameren icon.png
Missouri (NRC Region 4)
Reporting
10 CFR 21.21
Time - Person (Reporting Time:+4.08 h0.17 days <br />0.0243 weeks <br />0.00559 months <br />)
Opened: David M. Epperson
10:05 Oct 29, 2003
NRC Officer: Steve Sandin
Last Updated: Oct 29, 2003
40283 - NRC Website
Loading map...