ENS 40689: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 04/20/2004 18:10 PDT | | event date = 04/20/2004 18:10 PDT | ||
| last update date = 04/20/2004 | | last update date = 04/20/2004 | ||
| title = Degraded Condition - Greater | | title = Degraded Condition - Greater than One Percent of Steam Generator Tubes Defective | ||
| event text = On April 08, 2004, during the Unit 1 twelfth refueling outage (1R12), analysis of eddy current data on [Steam Generator] SG 1-4 indicated that greater than one percent of the total tubes inspected in SG 1-4 were defective. Ninety-two (92) defective tubes in SG 1-4 were detected and are being plugged. Most of the [pluggable] indications are due to circumferential primary water stress corrosion cracking in the Rows 5 to 8 U-bend region. Results of the SG tube inspection fall into Category C-3, which requires a four-hour non-emergency report in accordance with Technical Specification (TS) Table 5.5.9-2 and 10 CFR 50.72(b)(3)(ii) (an 8-hour requirement replacing the former (b)(2)(iii)(C), 4-hour requirement). [This was reported in EN#40659 dated 04/08/04.] | | event text = On April 08, 2004, during the Unit 1 twelfth refueling outage (1R12), analysis of eddy current data on [Steam Generator] SG 1-4 indicated that greater than one percent of the total tubes inspected in SG 1-4 were defective. Ninety-two (92) defective tubes in SG 1-4 were detected and are being plugged. Most of the [pluggable] indications are due to circumferential primary water stress corrosion cracking in the Rows 5 to 8 U-bend region. Results of the SG tube inspection fall into Category C-3, which requires a four-hour non-emergency report in accordance with Technical Specification (TS) Table 5.5.9-2 and 10 CFR 50.72(b)(3)(ii) (an 8-hour requirement replacing the former (b)(2)(iii)(C), 4-hour requirement). [This was reported in EN#40659 dated 04/08/04.] | ||
An NRC teleconference in accordance with TS 5.6.10.d to report the results of the voltage-based repair criteria implemented for the tube support plate intersections was conducted on Wednesday April 14, 2004, at 1300 EDT. | An NRC teleconference in accordance with TS 5.6.10.d to report the results of the voltage-based repair criteria implemented for the tube support plate intersections was conducted on Wednesday April 14, 2004, at 1300 EDT. |
Latest revision as of 22:23, 1 March 2018
Where | |
---|---|
Diablo Canyon ![]() California (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded | |
Time - Person (Reporting Time:+-1.73 h-0.0721 days <br />-0.0103 weeks <br />-0.00237 months <br />) | |
Opened: | Jeff Knisley 23:26 Apr 20, 2004 |
NRC Officer: | Jeff Rotton |
Last Updated: | Apr 20, 2004 |
40689 - NRC Website
| |