ENS 40689: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 04/20/2004 18:10 PDT
| event date = 04/20/2004 18:10 PDT
| last update date = 04/20/2004
| last update date = 04/20/2004
| title = Degraded Condition -  Greater Than One Percent Of Steam Generator Tubes Defective
| title = Degraded Condition -  Greater than One Percent of Steam Generator Tubes Defective
| event text = On April 08, 2004, during the Unit 1 twelfth refueling outage (1R12), analysis of eddy current data on [Steam Generator] SG 1-4 indicated that greater than one percent of the total tubes inspected in SG 1-4 were defective.  Ninety-two (92) defective tubes in SG 1-4 were detected and are being plugged.  Most of the [pluggable] indications are due to circumferential primary water stress corrosion cracking in the Rows 5 to 8 U-bend region.  Results of the SG tube inspection fall into Category C-3, which requires a four-hour non-emergency report in accordance with Technical Specification (TS) Table 5.5.9-2 and 10 CFR 50.72(b)(3)(ii) (an 8-hour requirement replacing the former (b)(2)(iii)(C), 4-hour requirement).  [This was reported in EN#40659 dated 04/08/04.]
| event text = On April 08, 2004, during the Unit 1 twelfth refueling outage (1R12), analysis of eddy current data on [Steam Generator] SG 1-4 indicated that greater than one percent of the total tubes inspected in SG 1-4 were defective.  Ninety-two (92) defective tubes in SG 1-4 were detected and are being plugged.  Most of the [pluggable] indications are due to circumferential primary water stress corrosion cracking in the Rows 5 to 8 U-bend region.  Results of the SG tube inspection fall into Category C-3, which requires a four-hour non-emergency report in accordance with Technical Specification (TS) Table 5.5.9-2 and 10 CFR 50.72(b)(3)(ii) (an 8-hour requirement replacing the former (b)(2)(iii)(C), 4-hour requirement).  [This was reported in EN#40659 dated 04/08/04.]
An NRC teleconference in accordance with TS 5.6.10.d to report the results of the voltage-based repair criteria implemented for the tube support plate intersections was conducted on Wednesday April 14, 2004, at 1300 EDT.
An NRC teleconference in accordance with TS 5.6.10.d to report the results of the voltage-based repair criteria implemented for the tube support plate intersections was conducted on Wednesday April 14, 2004, at 1300 EDT.

Latest revision as of 22:23, 1 March 2018

ENS 40689 +/-
Where
Diablo Canyon Pacific Gas & Electric icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded
Time - Person (Reporting Time:+-1.73 h-0.0721 days <br />-0.0103 weeks <br />-0.00237 months <br />)
Opened: Jeff Knisley
23:26 Apr 20, 2004
NRC Officer: Jeff Rotton
Last Updated: Apr 20, 2004
40689 - NRC Website
Loading map...