ML20116M093: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Callaway Plant Post Othce Scx 620 Fulton. Missoon 65251 1 | ||
Umon Etscru.sc August 12,1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 Washington, CC 20555-0001 ULNRC-3414 Gentlemen: | |||
Umon Etscru.sc | |||
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 Semi-Annual Fitness For Duty Program Performance Data Report for Union Electric Callaway Plant Enclosed is the Semi-Annual Fitness For Duty Program Performance Data Report for Union Electric's Callaway Nuclear Plant in accordance with 10CFR26.7)(d). This report applies to the period beginning January 1,1996 and ending on June 30,1996. | DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 Semi-Annual Fitness For Duty Program Performance Data Report for Union Electric Callaway Plant Enclosed is the Semi-Annual Fitness For Duty Program Performance Data Report for Union Electric's Callaway Nuclear Plant in accordance with 10CFR26.7)(d). This report applies to the period beginning January 1,1996 and ending on June 30,1996. | ||
7he enclosure includes the following: | 7he enclosure includes the following: | ||
| Line 24: | Line 23: | ||
Attachment B - Fitness For Duty Management Action with regard to (1 page): | Attachment B - Fitness For Duty Management Action with regard to (1 page): | ||
Initiatives Taken Reportable Fitness For Duty Events Under 10CFR26.73. | Initiatives Taken Reportable Fitness For Duty Events Under 10CFR26.73. | ||
If you have any questions in regard to the Performance Data Reported, please contact me at | If you have any questions in regard to the Performance Data Reported, please contact me at (573) 676-8246. | ||
(573) 676-8246. | Sincerely, James R. Peevy I | ||
Sincerely, James R. Peevy | g Manager, Emergency Preparedness JRP/RGR/PJD/paj i | ||
Enclosure | Enclosure f,Oh l | ||
f,Oh l 9608200009 960812 | 9608200009 960812 PDR ADOCK 05000483 R | ||
PDR | PDR | ||
ULNRC-3414 | ULNRC-3414 August 12,1996 Page' 2 U. S. Nuclear Regulatory Commission (Original and I copy) cc: | ||
Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-000i Mr. L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Ms. Kristine M. Thomas (2 copies) | Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-000i Mr. L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Ms. Kristine M. Thomas (2 copies) | ||
Licensing Project Manager, Callaway Plant OfTice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W. | Licensing Project Manager, Callaway Plant OfTice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W. | ||
| Line 38: | Line 36: | ||
i i | i i | ||
l l | l l | ||
ULNRC-3414 August 12,1996 | |||
i | ) | ||
Pagd 3 | i Pagd 3 bec: | ||
bec: D. F. Schnell(400) wo l | D. F. Schnell(400) wo l | ||
J. V. Laux/G. A. Ilughes w/a | G. L. Randolph w/o l | ||
: 11. D. Bono w/a JRP Chrono E210.0001 A160.0761 Manager, Plant Support w/o Wolf Creek Nuclear Operating Corporation | J. V. Laux/G. A. Ilughes w/a j | ||
A. C. Passwater/D. E. Shafer (470) w/o M. P. Barrett (100) w/o P. L. Reynolds (470) NSRB w/a | |||
: 11. D. Bono w/a JRP Chrono E210.0001 A160.0761 Manager, Plant Support w/o Wolf Creek Nuclear Operating Corporation PO Box 411 Burlington, KS 66839 I | |||
i | i i | ||
l l | l l | ||
l l | l l | ||
l l | l l | ||
l | l r | ||
r | |||
l l | l l | ||
l | |||
ULNRC-3414 | ULNRC-3414 | ||
, August 12,1996 Attach, ment A. | |||
Page1 Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (NUMARC Rev. Date 1/92) | Page1 Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (NUMARC Rev. Date 1/92) | ||
Union Electric | Union Electric January - June 1996 Company 6 Months Callaway Plant Location Patricia Davis, R. N. | ||
Callaway Plant Location Patricia Davis, R. N. | (573) 676-4300 Contact Name Phone (include Area Code) | ||
Cuttoffs: Screen / Confirmation (ng/ml) | Cuttoffs: Screen / Confirmation (ng/ml) 0 Appendix A to 10CFR26 Marijuana 20 / 15 Amphetamines 1000/ 250 Barbiturates 300/150 Cocaine 300/150 Phencyclidine 25 / 25 Benzodiazepines 300/150 Opiates 300/150 Alcohol | ||
Long-Term | (.04% BAC) | ||
Unescorted Access | ) | ||
Tested | Long-Term Short-Term Testing Results Licensee Employees Contractor-Personnel Contractor-Personnel j | ||
Average Number with Unescorted Access 892 141 26 Categories Tested Positive Tested Positive Tested Positive Pre-Access 2 | |||
0 0 | |||
0 16 0 | |||
Post Accident 0 | |||
0 0 | |||
0 0 | |||
0 Observed Behavior 0 | |||
0 0 | |||
0 0 | |||
0 Random 255 0 | |||
37 0 | |||
5 0 | |||
Follow-up 7 | |||
0 0 | |||
0 0 | |||
0 Other 0 | |||
0 0 | |||
0 0 | |||
0 Total 264 0 | |||
37 0 | |||
21 0 | |||
ULNRC-3414 August 12,1996 Attachment A Page 2 Breakdown of Confirmed Positive Tests for Specific Substances Refusal | ULNRC-3414 August 12,1996 Attachment A Page 2 Breakdown of Confirmed Positive Tests for Specific Substances Refusal | ||
.(1 c. | |||
2; | |||
'.*Marijuarm Cocaine.: | |||
' Opiates: | |||
. Amphetamines Phencyclidinel : Alcohol: | |||
:: to Test- | |||
' Barbiturates | |||
... _Benzodiazepines flicensee: | |||
L Employees - | L Employees - | ||
jong-Tenn Contractors - | jong-Tenn Contractors - | ||
' Short Term - | |||
Contractors YTOTAIU- | Contractors YTOTAIU-0 0 | ||
0 0 | |||
Record of test results that would have been Positive at the NRC cutofYlevel. | 0 0 | ||
Right Side | 0 0 | ||
Record of MRO confirmed positives based on Union Electric's more stringent cutofflevel. | 0 0 | ||
0 0 | |||
*Left Side Record of test results that would have been Positive at the NRC cutofYlevel. | |||
Right Side Record of MRO confirmed positives based on Union Electric's more stringent cutofflevel. | |||
There were no confirmed positive tests for this reporting period. | There were no confirmed positive tests for this reporting period. | ||
O e | O e | ||
G | G | ||
= | |||
uA-a | |||
-- a | |||
.~_- | |||
ULNRC-3414 August 12,1996 | |||
. Attachment B Initiatives Taken i | |||
An internal quality assurance assessment of the FFD Program was conducted during this reporting period. | |||
An internal quality assurance assessment of the FFD Program was conducted during this reporting period. | The auditor had no findings, but made some program enhancement recommendations. These recommendations are being incorporated into the current program. | ||
Reportable Fitness For Duty Events Under 10CFR26.73 No significant events occurred during this reporting period. | Reportable Fitness For Duty Events Under 10CFR26.73 No significant events occurred during this reporting period. | ||
i 1 | i 1 | ||
l 1 | l 1 | ||
( | ( | ||
1 | 1 l | ||
l | - -}} | ||
Latest revision as of 23:15, 12 December 2024
| ML20116M093 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/12/1996 |
| From: | Peevy J UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-3414, NUDOCS 9608200009 | |
| Download: ML20116M093 (6) | |
Text
Callaway Plant Post Othce Scx 620 Fulton. Missoon 65251 1
Umon Etscru.sc August 12,1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 Washington, CC 20555-0001 ULNRC-3414 Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 Semi-Annual Fitness For Duty Program Performance Data Report for Union Electric Callaway Plant Enclosed is the Semi-Annual Fitness For Duty Program Performance Data Report for Union Electric's Callaway Nuclear Plant in accordance with 10CFR26.7)(d). This report applies to the period beginning January 1,1996 and ending on June 30,1996.
7he enclosure includes the following:
Attachment A - Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (2 pages):
Attachment B - Fitness For Duty Management Action with regard to (1 page):
Initiatives Taken Reportable Fitness For Duty Events Under 10CFR26.73.
If you have any questions in regard to the Performance Data Reported, please contact me at (573) 676-8246.
Sincerely, James R. Peevy I
g Manager, Emergency Preparedness JRP/RGR/PJD/paj i
Enclosure f,Oh l
9608200009 960812 PDR ADOCK 05000483 R
ULNRC-3414 August 12,1996 Page' 2 U. S. Nuclear Regulatory Commission (Original and I copy) cc:
Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-000i Mr. L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Ms. Kristine M. Thomas (2 copies)
Licensing Project Manager, Callaway Plant OfTice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.
Washington, DC 20037
i i
l l
ULNRC-3414 August 12,1996
)
i Pagd 3 bec:
D. F. Schnell(400) wo l
G. L. Randolph w/o l
J. V. Laux/G. A. Ilughes w/a j
A. C. Passwater/D. E. Shafer (470) w/o M. P. Barrett (100) w/o P. L. Reynolds (470) NSRB w/a
- 11. D. Bono w/a JRP Chrono E210.0001 A160.0761 Manager, Plant Support w/o Wolf Creek Nuclear Operating Corporation PO Box 411 Burlington, KS 66839 I
i i
l l
l l
l l
l r
l l
l
ULNRC-3414
, August 12,1996 Attach, ment A.
Page1 Fitness For Duty Program Performance Data Personnel Subject to 10CFR26 (NUMARC Rev. Date 1/92)
Union Electric January - June 1996 Company 6 Months Callaway Plant Location Patricia Davis, R. N.
(573) 676-4300 Contact Name Phone (include Area Code)
Cuttoffs: Screen / Confirmation (ng/ml) 0 Appendix A to 10CFR26 Marijuana 20 / 15 Amphetamines 1000/ 250 Barbiturates 300/150 Cocaine 300/150 Phencyclidine 25 / 25 Benzodiazepines 300/150 Opiates 300/150 Alcohol
(.04% BAC)
)
Long-Term Short-Term Testing Results Licensee Employees Contractor-Personnel Contractor-Personnel j
Average Number with Unescorted Access 892 141 26 Categories Tested Positive Tested Positive Tested Positive Pre-Access 2
0 0
0 16 0
Post Accident 0
0 0
0 0
0 Observed Behavior 0
0 0
0 0
0 Random 255 0
37 0
5 0
Follow-up 7
0 0
0 0
0 Other 0
0 0
0 0
0 Total 264 0
37 0
21 0
ULNRC-3414 August 12,1996 Attachment A Page 2 Breakdown of Confirmed Positive Tests for Specific Substances Refusal
.(1 c.
2;
'.*Marijuarm Cocaine.:
' Opiates:
. Amphetamines Phencyclidinel : Alcohol:
- to Test-
' Barbiturates
... _Benzodiazepines flicensee:
L Employees -
jong-Tenn Contractors -
' Short Term -
Contractors YTOTAIU-0 0
0 0
0 0
0 0
0 0
0 0
- Left Side Record of test results that would have been Positive at the NRC cutofYlevel.
Right Side Record of MRO confirmed positives based on Union Electric's more stringent cutofflevel.
There were no confirmed positive tests for this reporting period.
O e
G
=
uA-a
-- a
.~_-
ULNRC-3414 August 12,1996
. Attachment B Initiatives Taken i
An internal quality assurance assessment of the FFD Program was conducted during this reporting period.
The auditor had no findings, but made some program enhancement recommendations. These recommendations are being incorporated into the current program.
Reportable Fitness For Duty Events Under 10CFR26.73 No significant events occurred during this reporting period.
i 1
l 1
(
1 l
- -