| event date = 08/05/2005 17:08 CDT
| event date = 08/05/2005 17:08 CDT
| last update date = 08/06/2005
| last update date = 08/06/2005
| title = Rps Actuation Due To Low Reactor Water Level Caused By Loss Of Reactor Feed Pumps
| title = Rps Actuation Due to Low Reactor Water Level Caused by Loss of Reactor Feed Pumps
| event text = At 1708 on 08/05/2005, Unit 2 reactor scrammed from 100% power when reactor water level reached Level 3 Reactor Scram setpoint due to loss of 2C and 2B Reactor Feed Pumps.  All rods inserted [fully].  Unit 3 was also at 100% power and was unaffected by this event.  Reactor water level reached level 2 (-45) HPCI & RCIC initiation setpoint and was recovered by HPCI and RCIC injection.  All expected PCIS isolations, Group 2 (RHR S/D cooling), Group 3 (RWCU), Group 6 (ventilation), and Group 8 (TIP) were received along with the auto start of CREV, 3 SGT trains, HPCI and RCIC with injection into Reactor Vessel.  Recirc Pumps tripped at -45" as expected.  Four MSRVs lifted momentarily to stabilize reactor pressure.
| event text = At 1708 on 08/05/2005, Unit 2 reactor scrammed from 100% power when reactor water level reached Level 3 Reactor Scram setpoint due to loss of 2C and 2B Reactor Feed Pumps.  All rods inserted [fully].  Unit 3 was also at 100% power and was unaffected by this event.  Reactor water level reached level 2 (-45) HPCI & RCIC initiation setpoint and was recovered by HPCI and RCIC injection.  All expected PCIS isolations, Group 2 (RHR S/D cooling), Group 3 (RWCU), Group 6 (ventilation), and Group 8 (TIP) were received along with the auto start of CREV, 3 SGT trains, HPCI and RCIC with injection into Reactor Vessel.  Recirc Pumps tripped at -45" as expected.  Four MSRVs lifted momentarily to stabilize reactor pressure.
This event is reportable at 4 hour and 8 hour Non-Emergency Notification along with a 60 day written report in accordance with 10CFR50.72(b)(2)(iv)(A), 10CFR50.72(b)(2)(iv)(B), 10CFR50.72(b)(3)(iv)(A) and 10CFR50.73(a)(2)(iv)(A) as 'Any event or condition that results in a valid actuation of RPS and PCIS as described in (l) and (2) below.'
This event is reportable at 4 hour and 8 hour Non-Emergency Notification along with a 60 day written report in accordance with 10CFR50.72(b)(2)(iv)(A), 10CFR50.72(b)(2)(iv)(B), 10CFR50.72(b)(3)(iv)(A) and 10CFR50.73(a)(2)(iv)(A) as 'Any event or condition that results in a valid actuation of RPS and PCIS as described in (l) and (2) below.'

Latest revision as of 21:20, 1 March 2018

ENS 41896 +/-
Where
Browns Ferry Tennessee Valley Authority icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-0.3 h-0.0125 days <br />-0.00179 weeks <br />-4.1094e-4 months <br />)
Opened: Michael Hunter
21:50 Aug 5, 2005
NRC Officer: Bill Gott
Last Updated: Aug 6, 2005
41896 - NRC Website