ENS 44251: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 05/30/2008 15:05 PDT | | event date = 05/30/2008 15:05 PDT | ||
| last update date = 05/31/2008 | | last update date = 05/31/2008 | ||
| title = Planned Power Outage | | title = Planned Power Outage at Primary Emergency Operations Facility (Eof) | ||
| event text = Southern California Edison has scheduled replacement of the backup diesel generator (DG) for the San Onofre Emergency Operations Facility (EOF), for Saturday May 31, 2008. While the new DG is being installed, the EOF will be inoperable. The EOF outage is expected to begin at about 0700 and last approximately 8 hours. | | event text = Southern California Edison has scheduled replacement of the backup diesel generator (DG) for the San Onofre Emergency Operations Facility (EOF), for Saturday May 31, 2008. While the new DG is being installed, the EOF will be inoperable. The EOF outage is expected to begin at about 0700 and last approximately 8 hours. | ||
The alternate EOF located in Irvine, CA, will be available should SONGS need to respond to an Emergency Event. | The alternate EOF located in Irvine, CA, will be available should SONGS need to respond to an Emergency Event. |
Latest revision as of 22:14, 1 March 2018
Where | |
---|---|
San Onofre California (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-4 h-0.167 days <br />-0.0238 weeks <br />-0.00548 months <br />) | |
Opened: | Mike Mcbrearty 18:05 May 30, 2008 |
NRC Officer: | Pete Snyder |
Last Updated: | May 31, 2008 |
44251 - NRC Website
| |