ENS 44251: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/30/2008 15:05 PDT
| event date = 05/30/2008 15:05 PDT
| last update date = 05/31/2008
| last update date = 05/31/2008
| title = Planned Power Outage At Primary Emergency Operations Facility (Eof)
| title = Planned Power Outage at Primary Emergency Operations Facility (Eof)
| event text = Southern California Edison has scheduled replacement of the backup diesel generator (DG) for the San Onofre Emergency Operations Facility (EOF), for Saturday May 31, 2008. While the new DG is being installed, the EOF will be inoperable. The EOF outage is expected to begin at about 0700 and last approximately 8 hours.  
| event text = Southern California Edison has scheduled replacement of the backup diesel generator (DG) for the San Onofre Emergency Operations Facility (EOF), for Saturday May 31, 2008. While the new DG is being installed, the EOF will be inoperable. The EOF outage is expected to begin at about 0700 and last approximately 8 hours.  
The alternate EOF located in Irvine, CA, will be available should SONGS need to respond to an Emergency Event.
The alternate EOF located in Irvine, CA, will be available should SONGS need to respond to an Emergency Event.

Latest revision as of 22:14, 1 March 2018

ENS 44251 +/-
Where
San Onofre Southern California Edison icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4 h-0.167 days <br />-0.0238 weeks <br />-0.00548 months <br />)
Opened: Mike Mcbrearty
18:05 May 30, 2008
NRC Officer: Pete Snyder
Last Updated: May 31, 2008
44251 - NRC Website
Loading map...