ENS 44655: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 11/13/2008 00:20 CST
| event date = 11/13/2008 00:20 CST
| last update date = 11/13/2008
| last update date = 11/13/2008
| title = Oil Spill From Circulating Water Pump Oil Sight Glass Line
| title = Oil Spill from Circulating Water Pump Oil Sight Glass Line
| event text = On November 13, 2008, at 0020 CST, the State of Nebraska, Department of Environmental Quality and National Response Center were notified by Omaha Public Power District's Fort Calhoun Nuclear Station of an oil spill due to a crack in upper pump bearing sight glass line for 'C' Circulating Water Pump, CW-1C.  The spill involved a small quantity of oil estimated to be less than one gallon to the intake Structure sump with trace amounts discharged to the Missouri River.  Per Fort Calhoun Nuclear Stations' National Pollutant Discharge Elimination System (NPDES) permit, the notifications were made and samples were taken for offsite analysis to determine if the quantity discharged involved an actual violation of the discharge permit.
| event text = On November 13, 2008, at 0020 CST, the State of Nebraska, Department of Environmental Quality and National Response Center were notified by Omaha Public Power District's Fort Calhoun Nuclear Station of an oil spill due to a crack in upper pump bearing sight glass line for 'C' Circulating Water Pump, CW-1C.  The spill involved a small quantity of oil estimated to be less than one gallon to the intake Structure sump with trace amounts discharged to the Missouri River.  Per Fort Calhoun Nuclear Stations' National Pollutant Discharge Elimination System (NPDES) permit, the notifications were made and samples were taken for offsite analysis to determine if the quantity discharged involved an actual violation of the discharge permit.
This notification is being made in accordance with 10 CFR 72.75 (b) (2) (xi), 4 hour non-emergency notification due to a notification being made to a Government Agency (State of Nebraska, Department of Environmental Quality and National Response Center).
This notification is being made in accordance with 10 CFR 72.75 (b) (2) (xi), 4 hour non-emergency notification due to a notification being made to a Government Agency (State of Nebraska, Department of Environmental Quality and National Response Center).

Latest revision as of 22:13, 1 March 2018

ENS 44655 +/-
Where
Ft Calhoun Omaha Public Power District icon.png
Nebraska (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-2.97 h-0.124 days <br />-0.0177 weeks <br />-0.00407 months <br />)
Opened: Bill Blessie
03:22 Nov 13, 2008
NRC Officer: Donald Norwood
Last Updated: Nov 13, 2008
44655 - NRC Website
Loading map...