ENS 45723: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 04/23/2009 EST
| event date = 04/23/2009 EST
| last update date = 02/24/2010
| last update date = 02/24/2010
| title = Faulty Logic Board For Cyberex 20 Kva Inverter Model Ac
| title = Faulty Logic Board for Cyberex 20 Kva Inverter Model Ac
| event text = The following is a summary of information received via fax:
| event text = The following is a summary of information received via fax:
On or around April 23rd, 2009, PSEG Nuclear LLC at Hope Creek Nuclear Station notified United Controls International (UCI), that they had encountered a problem with a Logic Power Supply circuit board (p/n: 90-41-974313) after installing it in their safety related inverter.  This circuit board was a Logic Power Supply printed circuit board used in a Cyberex 20 KVA Inverter model AC.  
On or around April 23rd, 2009, PSEG Nuclear LLC at Hope Creek Nuclear Station notified United Controls International (UCI), that they had encountered a problem with a Logic Power Supply circuit board (p/n: 90-41-974313) after installing it in their safety related inverter.  This circuit board was a Logic Power Supply printed circuit board used in a Cyberex 20 KVA Inverter model AC.  

Latest revision as of 22:10, 1 March 2018

ENS 45723 +/-
Where
Thomas & Betts
Tucker, Georgia (NRC Region 1)
Organization: United Controls International
Reporting
10 CFR 21.21
Time - Person (Reporting Time:+7378.7 h307.446 days <br />43.921 weeks <br />10.107 months <br />)
Opened: Robert Hale
16:42 Feb 24, 2010
NRC Officer: Joe O'Hara
Last Updated: Feb 24, 2010
45723 - NRC Website