ENS 45723: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 04/23/2009 EST | | event date = 04/23/2009 EST | ||
| last update date = 02/24/2010 | | last update date = 02/24/2010 | ||
| title = Faulty Logic Board | | title = Faulty Logic Board for Cyberex 20 Kva Inverter Model Ac | ||
| event text = The following is a summary of information received via fax: | | event text = The following is a summary of information received via fax: | ||
On or around April 23rd, 2009, PSEG Nuclear LLC at Hope Creek Nuclear Station notified United Controls International (UCI), that they had encountered a problem with a Logic Power Supply circuit board (p/n: 90-41-974313) after installing it in their safety related inverter. This circuit board was a Logic Power Supply printed circuit board used in a Cyberex 20 KVA Inverter model AC. | On or around April 23rd, 2009, PSEG Nuclear LLC at Hope Creek Nuclear Station notified United Controls International (UCI), that they had encountered a problem with a Logic Power Supply circuit board (p/n: 90-41-974313) after installing it in their safety related inverter. This circuit board was a Logic Power Supply printed circuit board used in a Cyberex 20 KVA Inverter model AC. |
Latest revision as of 22:10, 1 March 2018
Where | |
---|---|
Thomas & Betts Tucker, Georgia (NRC Region 1) | |
Organization: | United Controls International |
Reporting | |
10 CFR 21.21 | |
Time - Person (Reporting Time:+7378.7 h307.446 days <br />43.921 weeks <br />10.107 months <br />) | |
Opened: | Robert Hale 16:42 Feb 24, 2010 |
NRC Officer: | Joe O'Hara |
Last Updated: | Feb 24, 2010 |
45723 - NRC Website | |