ENS 45900: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/05/2010 05:00 EDT
| event date = 05/05/2010 05:00 EDT
| last update date = 05/05/2010
| last update date = 05/05/2010
| title = Technical Support Center Out Of Service For Preventive Maintenance
| title = Technical Support Center Out of Service for Preventive Maintenance
| event text = On May 5, 2010, at 0500 hours EDT, Fermi 2 removed the Technical Support Center (TSC) from operation to facilitate routine preventive maintenance on the facilities' heating ventilation and air-conditioning system.  During this work, which is expected to last approximately 12 hours, the TSC will be unavailable.  In the event TSC activation is necessary, the Emergency Operations Facility (EOF) will be used for the TSC function.  Activation and use of the EOF as a backup for the TSC is included in Fermi 2's Radiological Emergency Response Preparedness Plan.  The Emergency Call Out System (ECOS) is designed to facilitate contacting TSC personnel to respond directly to the EOF in the event of an emergency.  Fermi 2 is making this notification in accordance with 10 CFR 50.72(b)(3)(xiii).  Fermi 2 will notify the NRC upon completion of this work.  Fermi 2 has notified the NRC Resident Inspector.
| event text = On May 5, 2010, at 0500 hours EDT, Fermi 2 removed the Technical Support Center (TSC) from operation to facilitate routine preventive maintenance on the facilities' heating ventilation and air-conditioning system.  During this work, which is expected to last approximately 12 hours, the TSC will be unavailable.  In the event TSC activation is necessary, the Emergency Operations Facility (EOF) will be used for the TSC function.  Activation and use of the EOF as a backup for the TSC is included in Fermi 2's Radiological Emergency Response Preparedness Plan.  The Emergency Call Out System (ECOS) is designed to facilitate contacting TSC personnel to respond directly to the EOF in the event of an emergency.  Fermi 2 is making this notification in accordance with 10 CFR 50.72(b)(3)(xiii).  Fermi 2 will notify the NRC upon completion of this work.  Fermi 2 has notified the NRC Resident Inspector.
  * * * UPDATE FROM JIM KONRAD TO PETE SNYDER ON 5/5/10 AT 1725 EDT * * *  
  * * * UPDATE FROM JIM KONRAD TO PETE SNYDER ON 5/5/10 AT 1725 EDT * * *  

Latest revision as of 22:09, 1 March 2018

ENS 45900 +/-
Where
Fermi DTE Energy icon.png
Michigan (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-3.88 h-0.162 days <br />-0.0231 weeks <br />-0.00531 months <br />)
Opened: Greg Miller
05:07 May 5, 2010
NRC Officer: Mark Abramovitz
Last Updated: May 5, 2010
45900 - NRC Website
Loading map...