ML20129H583: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. .. | {{#Wiki_filter:... | ||
C r | . -... ~ - - | ||
C r | |||
i l | |||
GPU Nuclear, Inc. | GPU Nuclear, Inc. | ||
(. | (. | ||
Route 441 South | |||
Middletown. PA 17057-0480 | ' NUCLEAR PostOfficeBc"*80 Middletown. PA 17057-0480 i | ||
October 30,1996 | j Tel 717-944 7621 l | ||
1 October 30,1996 i | |||
6710-96-2367 U. S. Nuclear Regulatory Commission | |||
Washington,DC 20555 | - Attn.: Document Control Desk Washington,DC 20555 l | ||
==Dear Sir:== | ==Dear Sir:== | ||
{ | { | ||
? | |||
==Subject:== | ==Subject:== | ||
Three Mile Island Nuclear Station, Unit 1 (TMI-1) | Three Mile Island Nuclear Station, Unit 1 (TMI-1) | ||
Operating License No. DPR-50 | Operating License No. DPR-50 j | ||
Docket No. 50-289 Response to Generic Letter (GL) 96-06 | |||
==Reference:== | ==Reference:== | ||
NRC Letter dated September 30,1996, GL 96-06, " Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions" | NRC Letter dated September 30,1996, GL 96-06, " Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions" j | ||
GL 96-06 requested licensees to determine: (a) if containment air cooler cooling water systems are l | |||
susceptible to either water hammer or two-phase flow conditions during any postulated DBA conditions; and, (b) if piping systems that penetrate the containment are susceptible to thermal expansion of fluids so that overpressurization of the piping could occur. | |||
GPU Nuclear Inc. (GPUN) intends to complete the requested actions and submit a sununary report by January 28,1997 as requested by the GL. If the results of the industry meeting held on October 29,1996 indicate that more extensive analysis / testing may be required, GPUN will advise the NRC of an alternative date for our submittal. | GPU Nuclear Inc. (GPUN) intends to complete the requested actions and submit a sununary report by January 28,1997 as requested by the GL. If the results of the industry meeting held on October 29,1996 indicate that more extensive analysis / testing may be required, GPUN will advise the NRC of an alternative date for our submittal. | ||
Sincerely | Sincerely | ||
~ | |||
9611050290 9610% | J. Knubel 9611050290 9610% | ||
MRK 050098 | PDR ADOCK 05000289 Vice President and Director, TMI P | ||
cc: | PDR MRK 050098 i | ||
i cc: | |||
NRC Project Manager | |||
/ | |||
Administrator, Region I AOD,/ o NRC Sr. Resident Inspector}} | |||
Latest revision as of 10:58, 12 December 2024
| ML20129H583 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/30/1996 |
| From: | James Knubel GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 6710-96-2367, GL-96-06, GL-96-6, NUDOCS 9611050290 | |
| Download: ML20129H583 (1) | |
Text
...
. -... ~ - -
C r
i l
GPU Nuclear, Inc.
(.
Route 441 South
' NUCLEAR PostOfficeBc"*80 Middletown. PA 17057-0480 i
j Tel 717-944 7621 l
1 October 30,1996 i
6710-96-2367 U. S. Nuclear Regulatory Commission
- Attn.: Document Control Desk Washington,DC 20555 l
Dear Sir:
{
?
Subject:
Three Mile Island Nuclear Station, Unit 1 (TMI-1)
Operating License No. DPR-50 j
Docket No. 50-289 Response to Generic Letter (GL) 96-06
Reference:
NRC Letter dated September 30,1996, GL 96-06, " Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions" j
GL 96-06 requested licensees to determine: (a) if containment air cooler cooling water systems are l
susceptible to either water hammer or two-phase flow conditions during any postulated DBA conditions; and, (b) if piping systems that penetrate the containment are susceptible to thermal expansion of fluids so that overpressurization of the piping could occur.
GPU Nuclear Inc. (GPUN) intends to complete the requested actions and submit a sununary report by January 28,1997 as requested by the GL. If the results of the industry meeting held on October 29,1996 indicate that more extensive analysis / testing may be required, GPUN will advise the NRC of an alternative date for our submittal.
Sincerely
~
J. Knubel 9611050290 9610%
PDR ADOCK 05000289 Vice President and Director, TMI P
PDR MRK 050098 i
i cc:
NRC Project Manager
/
Administrator, Region I AOD,/ o NRC Sr. Resident Inspector