ML20132C417: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:_ _ _ _ _ _ | {{#Wiki_filter:_ _ _ _ _ _ | ||
Muling Addr:ss Alabama Power Company 600 North 18th Street Post Office Box 2641 l- | Muling Addr:ss Alabama Power Company 600 North 18th Street Post Office Box 2641 l-Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald | ||
(~ | (~ | ||
Senior Vice President Flintridge Duilding AlabamaPower July 22, 1985 i | |||
Docket Nos. 50-348 50-364 l | Docket Nos. 50-348 50-364 l | ||
i- | i-Director, Nuclear Reactor Regulatiol U. S. Nuclear Regulatory Commission l | ||
Director, Nuclear Reactor Regulatiol | Washington, D.C. | ||
20555 I | |||
Joseph M. Farley Nuclear Plant - Units 1 and 2 Fire Protection Program Reevaluation - Amendment 6 Gentlemen: | Attention: Mr. S. A. Varga i | ||
1 In accordance with Alabama Power Company's comitment to the NRC by letter dated December 9,1983, attached is a copy of Amendment 6 to the Farley Nuclear Plant Fire Protection Program Reevaluation (FPPR). Amendment | Joseph M. Farley Nuclear Plant - Units 1 and 2 Fire Protection Program Reevaluation - Amendment 6 Gentlemen: | ||
6 to the FPPR incorporates changes which, in the judgement of Alabama Power. | 1 In accordance with Alabama Power Company's comitment to the NRC by {{letter dated|date=December 9, 1983|text=letter dated December 9,1983}}, attached is a copy of Amendment 6 to the Farley Nuclear Plant Fire Protection Program Reevaluation (FPPR). Amendment 6 to the FPPR incorporates changes which, in the judgement of Alabama Power. | ||
Company, do not decrease the effectiveness of the program. | Company, do not decrease the effectiveness of the program. | ||
If there are any questions or coments, please contact this office. | If there are any questions or coments, please contact this office. | ||
Yours very t GG v | Yours very t GG v R. P. Mcdonald A | ||
R. P. Mcdonald | p RPM /DHJ :bdy-D30 Attachment cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves i | ||
Mr. W. H. Bradford File: P43.0 J | |||
4*11 8507300263 850722 ADOCK050%40 PDR R-F | |||
_a}} | _a}} | ||
Latest revision as of 10:13, 12 December 2024
| ML20132C417 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 07/22/1985 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | Varga S Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20132C422 | List: |
| References | |
| NUDOCS 8507300263 | |
| Download: ML20132C417 (1) | |
Text
_ _ _ _ _ _
Muling Addr:ss Alabama Power Company 600 North 18th Street Post Office Box 2641 l-Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald
(~
Senior Vice President Flintridge Duilding AlabamaPower July 22, 1985 i
Docket Nos. 50-348 50-364 l
i-Director, Nuclear Reactor Regulatiol U. S. Nuclear Regulatory Commission l
Washington, D.C.
20555 I
Attention: Mr. S. A. Varga i
Joseph M. Farley Nuclear Plant - Units 1 and 2 Fire Protection Program Reevaluation - Amendment 6 Gentlemen:
1 In accordance with Alabama Power Company's comitment to the NRC by letter dated December 9,1983, attached is a copy of Amendment 6 to the Farley Nuclear Plant Fire Protection Program Reevaluation (FPPR). Amendment 6 to the FPPR incorporates changes which, in the judgement of Alabama Power.
Company, do not decrease the effectiveness of the program.
If there are any questions or coments, please contact this office.
Yours very t GG v R. P. Mcdonald A
p RPM /DHJ :bdy-D30 Attachment cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves i
Mr. W. H. Bradford File: P43.0 J
4*11 8507300263 850722 ADOCK050%40 PDR R-F
_a