ENS 46879: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 05/24/2011 09:18 CDT | | event date = 05/24/2011 09:18 CDT | ||
| last update date = 05/24/2011 | | last update date = 05/24/2011 | ||
| title = Loss | | title = Loss of Power to Thirty-Two Emergency Sirens | ||
| event text = This 8-hour notification is being made per the reporting requirements specified by 10 CFR 50.72(b)(3)xiii. | | event text = This 8-hour notification is being made per the reporting requirements specified by 10 CFR 50.72(b)(3)xiii. | ||
At 0946 CDT on May 24, 2011, the TVA Corporate Operations Duty Specialist notified the Nuclear Power Group Emergency Duty Officer that the fifteen minute communication test for Lawrence County indicated a loss of communications with the Lawrence County siren activation system. | At 0946 CDT on May 24, 2011, the TVA Corporate Operations Duty Specialist notified the Nuclear Power Group Emergency Duty Officer that the fifteen minute communication test for Lawrence County indicated a loss of communications with the Lawrence County siren activation system. |
Latest revision as of 22:07, 1 March 2018
Where | |
---|---|
Browns Ferry Alabama (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+3.63 h0.151 days <br />0.0216 weeks <br />0.00497 months <br />) | |
Opened: | Ricky Givens 17:56 May 24, 2011 |
NRC Officer: | Howie Crouch |
Last Updated: | May 24, 2011 |
46879 - NRC Website
| |