ML20132F125: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:9
{{#Wiki_filter:9
          >" " M O,
>" " MO,
                  t                                  UNITEo STATES
UNITEo STATES
'a   *               #
t
    . , <             1               NUCLEAR REGULATORY COMMISSION
'a
  e                   o
*
  {,               q$                                 REGloN IV
#
  3                 8                     611 RYAN PLAZA DRIVE, SUITE 400
. , <
    #'+9           8                         AR LINGToN, TEXAS 76011-8064
1
          * ..*                                                                                         3
NUCLEAR REGULATORY COMMISSION
                                                      DEC i 31996
e
                                                                                                        l
o
                                                                                                        l
{,
            Mr. C. L. Terry
q$
            TU Electric
REGloN IV
            Group Vice President, Nuclear
3
            ATTN: Regulatory Affairs Department
8
            P.O. Box 1002
611 RYAN PLAZA DRIVE, SUITE 400
            Glen Rose, Texas 76043
#'+9
            SUBJECT: NRC INSPECTION REPORT 50-445/96-15:50-446/96-15
8
            Dear Mr. Terry:
AR LINGToN, TEXAS 76011-8064
            An NRC inspection was conducted November 18-22,1996, at your Comanche Peak Steam
* ..*
            Electric Station, Units 1 and 2, reactor facilities. The enclosed report presents the scope
3
            and results of that inspection.
DEC i 31996
            This routine, announced inspection focused upon your radiation protection activities during
l
            the Unit 1 Refueling Outage 1RF05. We determined that you had implemented an effective       !
Mr. C. L. Terry
            radiation protection program to address the radiological challenges encountered during the
TU Electric
            refueling outage,                                                                           j
Group Vice President, Nuclear
            in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter   i
ATTN: Regulatory Affairs Department
            and its enclosure will be placed in the NRC Public Document Room.
P.O. Box 1002
            Should you have questions concerning this inspection, we will be pleased to discuss them
Glen Rose, Texas 76043
            with you.
SUBJECT: NRC INSPECTION REPORT 50-445/96-15:50-446/96-15
                                                            Sincerely
Dear Mr. Terry:
                                                                            -
An NRC inspection was conducted November 18-22,1996, at your Comanche Peak Steam
                                                                                  ,       _m"
Electric Station, Units 1 and 2, reactor facilities. The enclosed report presents the scope
                                                            Thomas P. Gwynn, irec or
and results of that inspection.
                                                            Division of Reactor P ty
This routine, announced inspection focused upon your radiation protection activities during
            Dockot Nos.: 50-445;50-446
the Unit 1 Refueling Outage 1RF05. We determined that you had implemented an effective
            License Nos.: NPF-87; NPF-89
radiation protection program to address the radiological challenges encountered during the
              Enclosure:
refueling outage,
              NRC Inspection Report
j
              50-445/96-15:50-446/96-15
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
          9612240133 961213
i
          PDR       ADOCK 05000445
and its enclosure will be placed in the NRC Public Document Room.
          0                     PDR
Should you have questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely
-
,
_m"
Thomas P. Gwynn,
irec or
Division of Reactor P
ty
Dockot Nos.: 50-445;50-446
License Nos.: NPF-87; NPF-89
Enclosure:
NRC Inspection Report
50-445/96-15:50-446/96-15
9612240133 961213
PDR
ADOCK 05000445
0
PDR


                                                . _ _ . _ . . .
. _
*                                                               I
_ . _ . . .
                                                                I
*
                                                                l
I
l
.
.
  TU Electric                               -2-
TU Electric
  cc w/ enclosure:
-2-
  Mr. Roger D. Walker
cc w/ enclosure:
  TU Electric
Mr. Roger D. Walker
  Regulatory Affairs Manager
TU Electric
  P.O. Box 1002                                                 l
Regulatory Affairs Manager
  Glen Rose, Texas 76043
P.O. Box 1002
  Juanita Ellis
l
  President - CASE
Glen Rose, Texas 76043
  1426 South Polk Street
Juanita Ellis
  Dallas, Texas 75224
President - CASE
  TU Electric
1426 South Polk Street
  Bethesda Licensing                                           l
Dallas, Texas 75224
  3 Metro Center, Suite 610                                     l
TU Electric
  Bethesda, Maryland 20814
Bethesda Licensing
  George L. Edgar, Esq.
3 Metro Center, Suite 610
  Morgan, Lewis & Bockius
l
  1800 M. Street, NW                                           l
Bethesda, Maryland 20814
  Washington, D.C. 20036                                       )
George L. Edgar, Esq.
                                                                i
Morgan, Lewis & Bockius
  G. R. Bynog, Program Manager /                               j
1800 M. Street, NW
    Chief Inspector
l
  Texas Department of Licensing & Regulation                   l
Washington, D.C. 20036
  Boiler Division
)
  P.O. Box 12157, Capitol Station
i
  Austin, Texas 78711
G. R. Bynog, Program Manager /
  Honorable Dale McPherson
j
  County Judge
Chief Inspector
  P.O. Box 851
Texas Department of Licensing & Regulation
  Glen Rose, Texas 76043
Boiler Division
  Texas Radiation Control Program Director
P.O. Box 12157, Capitol Station
  1100 West 49th Street
Austin, Texas 78711
  Austin, Texas 78756
Honorable Dale McPherson
                                                                !
County Judge
  Susan Rieff, Director                                         j
P.O. Box 851
  Environmental Policy
Glen Rose, Texas 76043
  Office of the Governor
Texas Radiation Control Program Director
  P.O. Box 12428
1100 West 49th Street
  Austin, Texas 78711
Austin, Texas 78756
Susan Rieff, Director
j
Environmental Policy
Office of the Governor
P.O. Box 12428
Austin, Texas 78711


  b.                                                                                                                       l
b.
        TU Electric                                         -3-
TU Electric
                                                                                                                          l
-3-
                                                                                                                          :
l
        E-Mail report to D. Nelson (DJN)
E-Mail report to D. Nelson (DJN)
        E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to NRR Event Tracking System (IPAS)
      ,;bcc to DMB,(IEO6);
,;bcc to DMB,(IEO6);
        bec distrib. by RIV:
bec distrib. by RIV:
        L. J. Callan                               Resident inspector (2)
L. J. Callan
        DRP Director                               DRS-PSB
Resident inspector (2)
        Branch Chief (DRP/A)                       MIS System
DRP Director
        Projcct Engineer (DRP/A)                   RIV File
DRS-PSB
        Branch Chief (DRP/TSS)                     Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
Branch Chief (DRP/A)
                                                                                                                          I
MIS System
                                                                                                                          !
Projcct Engineer (DRP/A)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
l
l
!
!
Line 138: Line 167:
i
i
i
i
i       DOCUMENT NAME: G:\ REPORTS \CP615RP.JBN
i
          To receive cgpyhument, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
DOCUMENT NAME: G:\\ REPORTS \\CP615RP.JBN
;         RIV/SRS:$           E   RS:PSB           E   C:PSB       l, E   D:DRP   n    .E     D:DRS           N
To receive cgpyhument, indicate in box: "C" = Copy without enclosures
                                                                                                                        p
"E" = Copy with enclosures "N" = No copy
          JBNicholasy               GLGuerra c,J BMurray Q                   JEDye % h             TPGwynn (/[}
;
;         12Pd96                   12/o/96             12AQ96             124VJ()jp             12//3'96 ' /
RIV/SRS:$
                                                  OFFICIAL TECORD COPY                 M
E
                                                                                                                  '
RS:PSB
    240015
E
C:PSB
l, E
D:DRP
.E
D:DRS
N
n
p
JBNicholasy
GLGuerra c,J BMurray Q
JEDye %h
TPGwynn (/[}
;
12Pd96
12/o/96
12AQ96
124VJ()jp
12//3'96 '
/
OFFICIAL TECORD COPY
M
'
240015


    d
d
    .
.
      TU Electric                                     -3-
TU Electric
      E-Mail report to D. Nelson (DJN)
-3-
      E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to D. Nelson (DJN)
      bec to DMB (IE06)
E-Mail report to NRR Event Tracking System (IPAS)
      bec distrib. by RIV:
bec to DMB (IE06)
      L. J. Callan                       Resident inspector (2)
bec distrib. by RIV:
      DRP Director                       DRS-PSB
L. J. Callan
      Branch Chief (DRP/A)               MIS System
Resident inspector (2)
      Project Engineer (DRP/A)           RIV File
DRP Director
      Branch Chief (DRP/TSS)             Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
DRS-PSB
Branch Chief (DRP/A)
MIS System
Project Engineer (DRP/A)
RIV File
Branch Chief (DRP/TSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
;
;
e
e
i
i
      DOCUMENT NAME: G:\ REPORTS \CP615RP.JBN
DOCUMENT NAME: G:\\ REPORTS \\CP615RP.JBN
      To receive c     ument. indk Ps box: "C" = Copy without erdosures "E" = Copy wth enclosures "N" = No copy
To receive c
      RIV/SRS:PSBfl E       RS:PSb     lE       C:PSB         ,E     D:DRP n        E   D:DRS           N
ument. indk
                                                                                                                  p
Ps box: "C" = Copy without erdosures
      JBNicholasfW           GLGuerra cub BMurray Q                   JEDye @             TPGwynn {/[}
"E" = Copy wth enclosures "N" = No copy
        12M96                 124o/96           12Ag96               12W9Q)J               12//396 ' /
RIV/SRS:PSBfl E
                                        OFFICIAL 3ECORD COPY                     6pJcA4h
RS:PSb
  _
lE
C:PSB
,E
D:DRP
E
D:DRS
N
n
p
JBNicholasfW
GLGuerra cub BMurray Q
JEDye @
TPGwynn {/[}
12M96
124o/96
12Ag96
12W9Q)J
12//396 '
/
OFFICIAL 3ECORD COPY
6pJcA4h
}}
}}

Latest revision as of 09:41, 12 December 2024

Forwards Insp Repts 50-445/96-15 & 50-446/96-15 on 961118- 22.No Violations Noted
ML20132F125
Person / Time
Site: Comanche Peak  
Issue date: 12/13/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20132F129 List:
References
NUDOCS 9612240133
Download: ML20132F125 (4)


See also: IR 05000445/1996015

Text

9

>" " MO,

UNITEo STATES

t

'a

. , <

1

NUCLEAR REGULATORY COMMISSION

e

o

{,

q$

REGloN IV

3

8

611 RYAN PLAZA DRIVE, SUITE 400

  1. '+9

8

AR LINGToN, TEXAS 76011-8064

  • ..*

3

DEC i 31996

l

Mr. C. L. Terry

TU Electric

Group Vice President, Nuclear

ATTN: Regulatory Affairs Department

P.O. Box 1002

Glen Rose, Texas 76043

SUBJECT: NRC INSPECTION REPORT 50-445/96-15:50-446/96-15

Dear Mr. Terry:

An NRC inspection was conducted November 18-22,1996, at your Comanche Peak Steam

Electric Station, Units 1 and 2, reactor facilities. The enclosed report presents the scope

and results of that inspection.

This routine, announced inspection focused upon your radiation protection activities during

the Unit 1 Refueling Outage 1RF05. We determined that you had implemented an effective

radiation protection program to address the radiological challenges encountered during the

refueling outage,

j

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

i

and its enclosure will be placed in the NRC Public Document Room.

Should you have questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely

-

,

_m"

Thomas P. Gwynn,

irec or

Division of Reactor P

ty

Dockot Nos.: 50-445;50-446

License Nos.: NPF-87; NPF-89

Enclosure:

NRC Inspection Report

50-445/96-15:50-446/96-15

9612240133 961213

PDR

ADOCK 05000445

0

PDR

. _

_ . _ . . .

I

l

.

TU Electric

-2-

cc w/ enclosure:

Mr. Roger D. Walker

TU Electric

Regulatory Affairs Manager

P.O. Box 1002

l

Glen Rose, Texas 76043

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

TU Electric

Bethesda Licensing

3 Metro Center, Suite 610

l

Bethesda, Maryland 20814

George L. Edgar, Esq.

Morgan, Lewis & Bockius

1800 M. Street, NW

l

Washington, D.C. 20036

)

i

G. R. Bynog, Program Manager /

j

Chief Inspector

Texas Department of Licensing & Regulation

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

Honorable Dale McPherson

County Judge

P.O. Box 851

Glen Rose, Texas 76043

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

Susan Rieff, Director

j

Environmental Policy

Office of the Governor

P.O. Box 12428

Austin, Texas 78711

b.

TU Electric

-3-

l

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

,;bcc to DMB,(IEO6);

bec distrib. by RIV:

L. J. Callan

Resident inspector (2)

DRP Director

DRS-PSB

Branch Chief (DRP/A)

MIS System

Projcct Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

l

!

)

i

1

I

,

l

!

i

i

i

i

DOCUMENT NAME: G:\\ REPORTS \\CP615RP.JBN

To receive cgpyhument, indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures "N" = No copy

RIV/SRS:$

E

RS:PSB

E

C:PSB

l, E

D:DRP

.E

D:DRS

N

n

p

JBNicholasy

GLGuerra c,J BMurray Q

JEDye %h

TPGwynn (/[}

12Pd96

12/o/96

12AQ96

124VJ()jp

12//3'96 '

/

OFFICIAL TECORD COPY

M

'

240015

d

.

TU Electric

-3-

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

bec to DMB (IE06)

bec distrib. by RIV:

L. J. Callan

Resident inspector (2)

DRP Director

DRS-PSB

Branch Chief (DRP/A)

MIS System

Project Engineer (DRP/A)

RIV File

Branch Chief (DRP/TSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

e

i

DOCUMENT NAME: G:\\ REPORTS \\CP615RP.JBN

To receive c

ument. indk

Ps box: "C" = Copy without erdosures

"E" = Copy wth enclosures "N" = No copy

RIV/SRS:PSBfl E

RS:PSb

lE

C:PSB

,E

D:DRP

E

D:DRS

N

n

p

JBNicholasfW

GLGuerra cub BMurray Q

JEDye @

TPGwynn {/[}

12M96

124o/96

12Ag96

12W9Q)J

12//396 '

/

OFFICIAL 3ECORD COPY

6pJcA4h