ENS 47073: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 07/10/2011 12:00 PDT | | event date = 07/10/2011 12:00 PDT | ||
| last update date = 07/19/2011 | | last update date = 07/19/2011 | ||
| title = Agreement State Report - Lost Static Eliminator Containing | | title = Agreement State Report - Lost Static Eliminator Containing a 40 Millicurie Po-210 Source | ||
| event text = The following event report was received from the Washington Office of Radiation Protection via e-mail: | | event text = The following event report was received from the Washington Office of Radiation Protection via e-mail: | ||
On or about 10 July 2011, upon taking inventory of the static eliminators, a device was found to be missing. The device was leased from NRD, LLC on 10 November 2009. The last time the device was used was 2 June 2011. Upon discovering the device was missing, a thorough search of the facility was conducted to include personal lockers, the boat, the boat parts, the boat house, as well as other facilities around the company. At this time no one knows the location of the device, whether it was stolen, misplaced or thrown away. The company will inform the department if the device is found. Since this incident, Westport Shipyard 50 Meter Facility has changed its protocols for issuing and receiving these types of devices. They will be placed in the safety department in a locked cabinet. The will be logged out by safety on the day of use and logged back in the same day. Only leads and Supervisor will have the ability to sign for these devices and will be held accountable for their safe return at the end of the operation. | On or about 10 July 2011, upon taking inventory of the static eliminators, a device was found to be missing. The device was leased from NRD, LLC on 10 November 2009. The last time the device was used was 2 June 2011. Upon discovering the device was missing, a thorough search of the facility was conducted to include personal lockers, the boat, the boat parts, the boat house, as well as other facilities around the company. At this time no one knows the location of the device, whether it was stolen, misplaced or thrown away. The company will inform the department if the device is found. Since this incident, Westport Shipyard 50 Meter Facility has changed its protocols for issuing and receiving these types of devices. They will be placed in the safety department in a locked cabinet. The will be logged out by safety on the day of use and logged back in the same day. Only leads and Supervisor will have the ability to sign for these devices and will be held accountable for their safe return at the end of the operation. |
Latest revision as of 21:06, 1 March 2018
Where | |
---|---|
Westport Shipyard, Inc Port Angeles, Washington (NRC Region 4) | |
License number: | R1163 |
Organization: | Wa Division Of Radiation Protection |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+210.5 h8.771 days <br />1.253 weeks <br />0.288 months <br />) | |
Opened: | Brandy Ketter 13:30 Jul 19, 2011 |
NRC Officer: | Bill Huffman |
Last Updated: | Jul 19, 2011 |
47073 - NRC Website | |