ENS 47350: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 10/18/2011 04:50 CDT | | event date = 10/18/2011 04:50 CDT | ||
| last update date = 10/18/2011 | | last update date = 10/18/2011 | ||
| title = Technical Support Center Emergency Diesel Generator Out | | title = Technical Support Center Emergency Diesel Generator Out of Service | ||
| event text = At 0450 (CDT), on October 18, 2011, the Duane Arnold Energy Center (DAEC) Technical Support Center (TSC) Emergency Diesel Generator (EDG) was removed from service for preplanned maintenance. The expected duration of the maintenance is 12 hours. Normal power to the TSC will be available for the duration of the maintenance. | | event text = At 0450 (CDT), on October 18, 2011, the Duane Arnold Energy Center (DAEC) Technical Support Center (TSC) Emergency Diesel Generator (EDG) was removed from service for preplanned maintenance. The expected duration of the maintenance is 12 hours. Normal power to the TSC will be available for the duration of the maintenance. | ||
This notification is being made pursuant to 10 CFR 50.72(b)(3)(xiii) | This notification is being made pursuant to 10 CFR 50.72(b)(3)(xiii) |
Latest revision as of 22:05, 1 March 2018
Where | |
---|---|
Duane Arnold ![]() Iowa (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-3.85 h-0.16 days <br />-0.0229 weeks <br />-0.00527 months <br />) | |
Opened: | Ben Wescot 05:59 Oct 18, 2011 |
NRC Officer: | Joe O'Hara |
Last Updated: | Oct 18, 2011 |
47350 - NRC Website
| |