ENS 47716: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 02/16/2012 CST | | event date = 02/16/2012 CST | ||
| last update date = 04/03/2012 | | last update date = 04/03/2012 | ||
| title = Part 21 Report - Rosemont Pressure Transmitters Out | | title = Part 21 Report - Rosemont Pressure Transmitters Out of Tolerance Condition | ||
| event text = The following information was received by facsimile: | | event text = The following information was received by facsimile: | ||
During the course of qualification testing to replace certain diodes identified for obsolescence, an out of tolerance condition during steam pressure/temperature testing was observed on a test pressure transmitter in the qualification program. Through investigation into the out of tolerance condition, it was determined that the condition was not related to the replacement diode, but rather the result of the magnitude of a resistance change made to the transmitter temperature compensation circuitry during a final factory acceptance test. A brief description of the final acceptance test follows. | During the course of qualification testing to replace certain diodes identified for obsolescence, an out of tolerance condition during steam pressure/temperature testing was observed on a test pressure transmitter in the qualification program. Through investigation into the out of tolerance condition, it was determined that the condition was not related to the replacement diode, but rather the result of the magnitude of a resistance change made to the transmitter temperature compensation circuitry during a final factory acceptance test. A brief description of the final acceptance test follows. |
Latest revision as of 22:04, 1 March 2018
Where | |
---|---|
Rosemount Nuclear Chanhassen, Minnesota (NRC Region 3) | |
Organization: | Rosemount Nuclear |
Reporting | |
10 CFR 21.21 | |
Time - Person (Reporting Time:+370.85 h15.452 days <br />2.207 weeks <br />0.508 months <br />) | |
Opened: | Duyen Pham 16:51 Mar 2, 2012 |
NRC Officer: | John Knoke |
Last Updated: | Apr 3, 2012 |
47716 - NRC Website | |