ENS 47866: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 04/26/2012 09:55 EDT | | event date = 04/26/2012 09:55 EDT | ||
| last update date = 04/26/2012 | | last update date = 04/26/2012 | ||
| title = Offsite Notification Due | | title = Offsite Notification Due to Death of a Bald Eagle | ||
| event text = At 0955 [EDT] on April 26, 2012, a bald eagle (bird of prey) caused a phase to phase fault on the Station's 428 power line (power to buildings outside the protected area). The fault temporarily de-energized the 428 line. The bald eagle was found dead beneath the power lines. | | event text = At 0955 [EDT] on April 26, 2012, a bald eagle (bird of prey) caused a phase to phase fault on the Station's 428 power line (power to buildings outside the protected area). The fault temporarily de-energized the 428 line. The bald eagle was found dead beneath the power lines. | ||
Two outside agencies, The Virginia Department of Game and Inland Fisheries and The U.S. Fish and Wildlife Service will be notified. | Two outside agencies, The Virginia Department of Game and Inland Fisheries and The U.S. Fish and Wildlife Service will be notified. |
Latest revision as of 22:04, 1 March 2018
Where | |
---|---|
Surry Virginia (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release | |
Time - Person (Reporting Time:+-0.08 h-0.00333 days <br />-4.761905e-4 weeks <br />-1.09584e-4 months <br />) | |
Opened: | Bret Rickert 13:50 Apr 26, 2012 |
NRC Officer: | Vince Klco |
Last Updated: | Apr 26, 2012 |
47866 - NRC Website
| |