Line 16: Line 16:
| event date = 07/20/2012 14:00 CDT
| event date = 07/20/2012 14:00 CDT
| last update date = 07/20/2012
| last update date = 07/20/2012
| title = Unit 2 Emergency Diesel Generators Inoperable Due To Missing Flood Control Barrier Seal
| title = Unit 2 Emergency Diesel Generators Inoperable Due to Missing Flood Control Barrier Seal
| event text = D5 and D6 Diesel Generators (DG) were declared inoperable at 1400 CDT due to a missing internal flood control barrier seal.  The missing flood control barrier seal is required to be installed with Unit 2 in Modes 1, 2, 3, and 4 when the MSIV's are open.
| event text = D5 and D6 Diesel Generators (DG) were declared inoperable at 1400 CDT due to a missing internal flood control barrier seal.  The missing flood control barrier seal is required to be installed with Unit 2 in Modes 1, 2, 3, and 4 when the MSIV's are open.
LCO 3.8.1 Condition B was entered for both DGs and LCO 3.8.1 Condition E was entered for two DGs inoperable on the same unit.  The DGs could start and run if required at the time of entry.
LCO 3.8.1 Condition B was entered for both DGs and LCO 3.8.1 Condition E was entered for two DGs inoperable on the same unit.  The DGs could start and run if required at the time of entry.

Latest revision as of 21:03, 1 March 2018

ENS 48122 +/-
Where
Prairie Island Xcel Energy icon.png
Minnesota (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor
Time - Person (Reporting Time:+-2.08 h-0.0867 days <br />-0.0124 weeks <br />-0.00285 months <br />)
Opened: Stever Schmidt
16:55 Jul 20, 2012
NRC Officer: Donald Norwood
Last Updated: Jul 20, 2012
48122 - NRC Website
Loading map...