ENS 48141: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 07/26/2012 21:20 CDT
| event date = 07/26/2012 21:20 CDT
| last update date = 07/27/2012
| last update date = 07/27/2012
| title = Loss Of Ac Power To The Emergency Operations Facility
| title = Loss of Ac Power to the Emergency Operations Facility
| event text = At 2120 [CDT] [on 07/26/12], a loss of AC power to the Emergency Operations Facility (EOF) occurred effecting emergency response capability. The Technical Support Center (TSC) remained available.  In the event of on emergency declaration requiring an EOF, the emergency Response Organization (ERO) would have been directed to report to the Backup EOF.
| event text = At 2120 [CDT] [on 07/26/12], a loss of AC power to the Emergency Operations Facility (EOF) occurred effecting emergency response capability. The Technical Support Center (TSC) remained available.  In the event of on emergency declaration requiring an EOF, the emergency Response Organization (ERO) would have been directed to report to the Backup EOF.
Assessment capability via SPDS was not lost during this time period and communications equipment also remained available.
Assessment capability via SPDS was not lost during this time period and communications equipment also remained available.

Latest revision as of 22:03, 1 March 2018

ENS 48141 +/-
Where
Arkansas Nuclear Entergy icon.png
Arkansas (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-1.85 h-0.0771 days <br />-0.011 weeks <br />-0.00253 months <br />)
Opened: James Crabill
00:29 Jul 27, 2012
NRC Officer: John Shoemaker
Last Updated: Jul 27, 2012
48141 - NRC Website
Loading map...